LIGHT WAGONS FOR COMBINED TRAFFIC BRUSSEL 2016-05-10 AUTHOR: SERGE MÉTRAL (SNCF)

Slides:



Advertisements
Similar presentations
1 Workshop on noise differentiated track access charges Brussels – April 27 th, 2010 Denis BIASIN – Rolling-stock TSI Sector – Interoperability Unit Composite.
Advertisements

IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
T h e E u r o p e a n T y r e a n d R i m T e c h n i c a l O r g a n i s a t i o n New Snow Test Method for Tyre Class C2 Agenda 1.Scope 2.Requirements.
Indian Railways Update 10 th IHHA Conference 2013 New Delhi.
UIC The Worldwide Association Representing the Railway Sector Nathalie Amirault Head of Unit Expertise Development, UIC RAILWAY OPERATION IN ECVET A LLP-DoI.
Specialists I projects I management © Brunel Railmotive, 2005, EURNEX Pole 4 Meeting, Prague, specialists I projects I management Brunel GmbH.
Topic: Standard harmonisation | October 00, 2012 | VNIIZhT1 | JSC Railway Research Institute (VNIIZhT) Methods of Harmonising Standards in Railway Transport.
Module 4: Railway Equipment
WELCOME EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli.
OTM TASK FORCE Draft final report Markus Hofmann OTM Task Force Chairman EFRTC General Meeting Prague, 22 nd June 2012.
Certification of railway equipment. JSC VNIIZhT Test Centre Speakers: Alexandr Savin Eduard Gunchenko 17 October 2012 VNIIZhT (JSC Railway Research Institute)
Russian Railway Transport Research Institute (VNIIZhT) Energy strategy for rail transport: an efficient tool for managing energy savings Alexander KOSAREV.
PRESENTATION OF “AZOVMASH” GROUP. 2 BRIEF DESCRIPTION OF ”AZOVMASH” GROUP Azovmash” Group is the unique scientific and production complex of complete.
Introduction To Servicing Heavy-Duty Trucks
Overview System modelling and holistic simulation :
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
Diesel Technology Dr. James A. Forrest Career and Technology Center Leonardtown, Maryland.
INTRODUCTION OF HIGHER AXLE LOADS ON INDIAN RAILWAYS
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
1 FROM V 250 TO HST 350 THE ANSALDOBREDA NEW GENERATION OF EUROPEAN HIGH SPEED TRAINS:
LEGAL FRAMEWORK & REGULATORY SYSTEM f or introduction of NPP into Vietnam Le Chi Dung (VARANS, Vietnam) Vienna, December 2008.
Help Desk Introduction to Computer User Support. 2 Certificate III Software Applications Introduction to Computer User Support Increased Need for User.
Korea Rail Network Authority, Republic of Korea. Contents Introduction Organizations - KRNA Overview of KOREA’s High Speed Rail development Background.
REGIONAL ENERGY & ENVIRONMENT INTRODUCTION. WHO ARE WE Incorporated in 2007 as a new division from the Regional Petroleum Products Corp. that was incorporated.
1 THE INTRODUCTION OF THE FIRST NPP IN TUNISIA PROJECT STATUS Jomaâ Souissi Souad Baccouche Société Tunisienne d’Electricité et du Gaz Centre National.
Changing risk in the liberalised rail freight market Ian Lake – Railway Safety Commission.
TSI WAGONS (321/2013) modifications BEWAG 27/04/2015.
1 Scientific and Organizing Problems Concerning European Grants Related to Shifting Wheelset Andrzej Chudzikiewicz Bezpieczny i Zrównoważony Transport.
20/06/051 Technology Challenges for 350 km/h EurailSpeed 7-9 November 2005 Session E1 Louis-Marie CLEON I&R Technical Director.
European Railway Safety Strategy EIM Safety Group (PhGALLEY and J-Å HALLDEN) 29 september 2009.
Transport ERTMS on the EU core network by 2015, 2020, 2030 strategic (pragmatic) approach UIC conference 2014 I. Vandoorne.
RE-E / IRSC / 27/09/ /10/09 1 The necessary evolution of railway safety regulations in Europe A challenge – Risks to be controlled.
7 Service Information and Work Orders Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives After.
PRACTICAL SOLUTIONS TO CHALLENGES FACED BY RAILWAYS IN THE REGION The Case of NRZ Harare, 15 October 2015 THERE IS NO BETTER WAY THAN THE RAILWAY.
TSI WAGONS. 1. Former situation 2 Former TSI Wagons  2006/861/CE TSI with open points  each member state must check items to its national regulation.
Veterinary Office Management. What is office management? What does an office manager do? What does an office manager do? Administrative responsibilities.
Detector Derailment Device (&) Frenado (Braking) Automatic Train
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
2nd World RV Conference Standards Breakout Session Tampa Florida 18 January 2013.
A look at Shelby USA (formerly Superformance) sports cars. An amazing car that you can build yourself. Available here in Orange county. Some mechanical.
1 WHO ARE WE ? VÚKV a.s. is a joint stock company based in Prague. VÚKV a.s. operates a test centre which is based in Prague, and a branch test centre.
European Standard Freight Axle (ESFA) AG BEWAG -10th May 2016.
Developments aiming to improve traffic safety on the network of GYSEV Zrt Február 7. Gócza József.
Senior Vice-President for Innovation Development - Chief Engineer, JSC “Russian Railways” VALENTIN GAPANOVICH USING INTERNATIONAL STANDARDS BY RUSSIAN.
Copyright © AEbt 2016 All Rights Reserved. AEbt Angewandte Eisenbahntechnik AEbt Angewandte Eisenbahntechnik (AEbt Applied Railway Technology) Further.
in Croatian Track access charging system
GRRF Ad-Hoc Working Group
ECVET PERMIT: methodology
Today´s Challenges of the Rail Infrastructure Industry
Sustainable maintenance of high-speed lines with mixed traffic
WAGONS IN COMBINED TRANSPORT: CODIFICATION SYSTEM and main markings
ROAD – RAIL – URBAN TRANSPORT
RAILWAY’S AIR BRAKE SYSTEM
IRSC 2005 Cape Town - South Africa 9 – 14 october 2005
Witold Groll, Instytut Kolejnictwa Railway Institute Warsaw, Poland
European Rail Infrastructure Managers
PRESENTATION OF MONTENEGRO
Visit for more Learning Resources
COMBINED TRANSPORT A brief view on the UIRR scrl
PRESENTATION ON- CARRIAGE AND WAGON SHOP
The FCC A frameless container chassis for East Africa and other developing markets...
IRSC 2017 Hong-Kong.
UIC 518.
Pavel Kodym Interoperability expert
JAQUET Products for Railway Applications
JSC Railway Research Institute
Considerations on the NRMM Technical Review
Spring Test Press NST.
Quality Regulation for Mechanical Equipment RESSQ – Mech
custom-engineered solution
Presentation transcript:

LIGHT WAGONS FOR COMBINED TRAFFIC BRUSSEL AUTHOR: SERGE MÉTRAL (SNCF)

LET ME INTRODUCE MYSELF I AM + From the SNCF Centre d'Ingénierie du Matériel (Rolling Stock Engineering Centre) + Speaker for TSI WAG and TSI LOC&PAS + Member of SET 03 of UIC 2 Serge MÉTRAL

CENTRE D’INGÉNIERIE DU MATÉRIEL WHO ARE WE ? ROLLING STOCK ENGINEERING CENTRE Part of the SNCF Rolling Stock Division, located at Le Mans Over 70 years of experience in railway rolling stock engineering 250 technicians & engineers with cutting-edge technical skills covering 90 technological and scientific railway disciplines 3 Serge MÉTRAL

Comprehensive know-how Specification, support to development, design and installation of railway rolling stock and its equipment, Assistance to project management for all rolling stock Know-how upgraded by analysis of operational feedback and technology watch Clients : Operators - Manufacturers - Equipment suppliers - Rolling stock and wagon operators - Wagon owners - Organising Authorities - Institutional bodies - Infrastructure managers CENTRE D’INGÉNIERIE DU MATÉRIEL WHO ARE WE ? 4 Serge MÉTRAL

WHAT WE DO ? Technical responsibilities Project Management Safety and braking equipment Diesel engine Bogies and bearing equipment Propulsion and energy conversion Body structure and interior fittings Systems engineering and transverse functions 5 Serge MÉTRAL

WHAT WE DO ? Services Procurement and refurbishment of rolling stock Assessment and diagnostics Functional and technical standards drafting Safety equipment integration and qualification Verification of component compliance with standards & regulations Assistance and advice for rolling stock design and homologation All engineering services available with & Serge MÉTRAL

SUMMARY 1. Need of Railway Undertaken 2. Description of the light wagon 7 SERGE MÉTRAL

8 NEED OF RAILWAY UNDERTAKEN It exists a 2-axles wagon for block train But Need of short wagon with an UTI of 36 t able to operate at 120 km/h higher height for the ILU Cost equivalent of 2-axles wagon Better productivity with a low tare weight

SERGE MÉTRAL 9 in France, for 120 km/h limits: 700 m and 1400 t Two parameters: PRODUCTIVITY

SERGE MÉTRAL 10 2-AXLES WAGON Built for 22,5 t/axle Tare weight 13 t Height of the loading plane 1150 mm More expensive equipment Brake disc or special wheels Suspension S2000

SERGE MÉTRAL 11 LIGHT WAGON Built for 14 t/axle Tare weight 16 t Payload 40 t Height of the loading plane 900 mm Standard equipment Composite brake blocks Bogies for 140 km/h

SERGE MÉTRAL axles Wagon Light wagon (one end is equipped with UIC coupling) DIAGRAMS

SERGE MÉTRAL light wagons légers for NAVILAND CARGO and NOVATRANS (3 triples, 4 doubles, 2 simples) Running behaviour tests with tare weight 14 t (results not satisfactory) Placing into service at 120 km/h after ballasting (tare weight 16 t) (Summer 2000) EXISTING WAGONS

THANK YOU 14 It is not a light wagon