1 Notes from today’s meeting on Laser Transport and 2:00 IP Laser installations (please add and correct): Attendees: Z. Zhao, A. Fedotov, R. Meier, P.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Drawing In One-Point Perspective
Dimensioning Dimensioning Gateway To Technology®
IP Area Reconfiguration Conceptual Design Five Phases: 1.Transport (A) 2.Gas Chamber 3.Injection Chamber 4.Compressor 5.Transport (B) M. Litos July 24,
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Heavy Concrete Construction Formwork
Pipe Supports and Hangers
Service Technician Training
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Reduced Vertical Separation Minimum (RVSM)
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
3- Pipsqueak Piston and Cylinder. Work holding in the Lathe Collets have definite advantages over chucks in gripping work pieces in the lathe. They apply.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
PLANOMETRIC VIEW OF A KITCHEN.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
An Introduction to Sazeh Negar 6.
Ken YoussefiIntroduction to Engineering – E10 1. Various Blade designs Ken YoussefiIntroduction to Engineering – E10 2.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
Precision Layout Unit 21.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
One Point Perspective Design and Technology. One Point Perspective Task 3 Here are some high quality examples of what we are aiming to produce by the.
Structural Drafting Connection Details and Gages.
FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007.
1.3GHz Input Coupler for ILC
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Manufacturing the Base Plate #2. Contents of this presentation are for the machinist to view the best method of producing this foundational part to the.
15.75 in quick check of fields in a test structure – design will be improved A Ross Engineering Toroid water jetted plate ground plane shaped button cable.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Booster L12/Noker-L13/Absorber Update PIP Update Talk August 15, 2012 Salah Chaurize.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Cardboard Bridge Construction Inventor Step 1 1.Open Autodesk Inventor Open the Card Board Bridge ipt file from the assignment log 3.Use.
Schematic of Laser Transport Vacuum enclosure Laser Room Interlocked, controlled area Laser Wall Periscope in vacuum enclosure Cathode Fiduciary Beam line.
Structural Drafting Assembly Clearance Dimensions.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
Meeting Minutes: LEReC DC Gun, Transport Lines, and Dump Installation 2016, May 26, 2016 D. Kayran, A. Fedotov, T. Miller, D. Gassner, D. Weiss, G. Mahler,
5/25/16 Gun to Booster Transport Line Meeting Minutes: A. Fedotov, D. Kayran, S. Bellavia, M. Mapes, T. Rao, B. Sheehy, J. Tuozzolo, Z. Zhao, B. Sheehy,
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Minutes meeting Mapes, Miller, Kayran, Fedotov, Gassner, Hamdi, Bruno, Mahler, Weiss, Hammons, Arno, Nayak, Fite, Bellavia The layout shown in.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
S A Griffiths CM42 June 2015 Electrical & Control.
Meeting Minutes S. Nayak, J. Halinski, L. DeSanto, D. Gassner, C.J. Liaw, Z. Zhao, P. Inacker, M. Minty, J. Tuozzolo All three custom chambers.
704 MHz cavity folded tuner Thermal Analysis C. Pai
Warm Vessel Leveling Islands (Piers)
Drawing Alcoves using One Point Perspective
Ti/SS transitions A.Basti INFN-PISA*
MICE Partial Return Yoke Mechanical Design
Progress and Issues with VTS Upgrade
Revolved Boss/Base Solidworks, a tutorial.
Design of Distribution Feedbox at LHC P7
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
171-SH SH Box with Pre-Installed 101⁄2" Pigtail Popular 4" square boxes and switch boxes Pre-installed 101⁄2" insulated grounding.
Anthony DiPette Installation / Vacuum Group Leader 7/17/2015
Plan The next question would be ... but how do we get the drawings from the 3D object? This will be explained over the next few pages. Take a look at.
Bunker Wall Design Wall ESS
SNS Coupler Shipping Plans
Presentation transcript:

1 Notes from today’s meeting on Laser Transport and 2:00 IP Laser installations (please add and correct): Attendees: Z. Zhao, A. Fedotov, R. Meier, P. Inacker, D. Phillips, M. Minty, S.V. Badea, T. Tallerico, C. Spataro, J. Tuozzolo Topics from meeting notice: 1.Status of tunnel laser table order and phone conference with vendor (Steve, Patrick, Zhi) 2.Tunnel penetration 3” diameter, status (Dave) Frank and Matt were surveying location on Tuesday. 3.Vibration Measurements (Tom, Viorel) 4.Latest plan for stiffening of the laser building foundation under the optical table legs (Dave P.) 5.Specifications for vacuum pumps, the vacuum to air windows, for the transport lines. (Zhi) Minutes: 1. Status of tunnel laser table order and phone conference with vendor (Steve, Patrick, Zhi).  DC gun optics table: It was discussed and agreed that a custom concrete block would be fabricated to the plan view shape of the DC gun laser table. The laser table top would be purchase and then grouted onto the top of this concrete block. a)The thickness of the laser table top was discussed. Patrick will work with Steve to define the laser table thickness. Options are purchasing a flat stainless steel plate and having tapped holes installed in the top or purchasing a standard thinner optics table then was considered previously. The thickness of this optics table top needs to be resolved so that the concrete block can be designed by Bob and purchased by Dave. b)Additional DC Gun optics table dimensions: For the DC gun it was agreed that the laser optics table top will be 6” below the beam centerline height (68” off the floor). The table thickness will be defined as noted in a). The grout under the table will be 1.5” thick (Dave).  DC gun optics table: The design presented for confirmation was the 6’x 4’ table with a 1’x3’ cutout on one corner and 1’x 1’ on the other. a)Zhi is again concerned that the last mirror element is too far from the cathode. The table was simplified in previous meetings to provide floor space for working in the area. Zhi is concerned that this will affect laser system performance. Again a 1’ wide isthmus needs to be added. b)Bob will find a way to show Zhi on the drawing marking for different distances from the cathode for Zhi to review and approve. This extension needs to be minimized. c)Zhi will provide a maximum distance he calculates that is workable. It was noted that a removable extension could be added later if needed by bolting a re-enforced shelf to the concrete block to the table if this maximum distance does not work. d)In order to better define the design of the isthmus, Patrick and/or Zhi will provide the vendor and part numbers for the last mirror assemblies so the isthmus can be accurately laid out by Laura.

2  Laser relay optics table: It was discussed and agreed that a custom concrete block would be fabricated in the plan view dimension of the relay table dimensions. The laser table top would be purchase and then grouted onto the top of this concrete block. a)This table top will be the same type and thickness dimension as the DC gun optics table top. Zhi requested that the table by 2’ x 4’. b)Additional relay optics table dimensions: For the relay optics table it was agreed that the laser optics table top will be 3” below the beam centerline height of the center of the laser transport tube coming from 1002F (~80” off the floor). The table thickness will be defined as noted in a). The grout under the table will be 1.5” thick (Dave). c)In order to better define the design of the relay optics table, Patrick and/or Zhi will provide the vendor and part numbers for the mirror assemblies shown in the sketch below so that it can be accurately laid out by Laura. 2. Tunnel penetration 3” diameter, status (Dave) Frank and Matt were surveying location on Tuesday.  It was agreed that the 3”diameter was okay. Dave was ordering the boring tool today. If the bore ends up being crooked it will be rebored as needed.  The tube size through the wall be defined after the boring is complete and the accuracy analyzed. 3. Vibration Measurements (Tom, Viorel, Charlie)  Tom and Viorel will be doing more measurements with help from Charles Spataro.  3 spots were marked on or near the beamline: the DC gun location, the booster cavity location and the laser table location.  On spot was marked on the floor where the relay optics table will be.  Requested that a measurement be taken either on the pier or on the side concrete block of the laser building 1002F for reference of their effectness.  Tom will decide how long to take measurements and note any environmental factors.

3 4.Latest plan for stiffening of the laser building foundation under the optical table legs (Dave P.)  Dave is moving forward with moving the laser building off its piers and installing a steel block that will be under the laser optics table and directly support its legs independent of the laser building. Other topics:  Discussion on temperature control and humidity in the tunnel and the laser building. Dave asked for specific specifications. Zhi and Patrick noted that there were no hard requirements. There were two assignments: a)Zhi check with JLAB to see if they do anything specific for temperature control in the laser rooms there. (It was noted that Cornell does not do anything specific). b)Patrick noted that pockel cells are sensitive to humidity. He will check with the manufacturer on specific limits.

5

Laser Systems Laser transport: (Zhi, Steve, Patrick, Bob) a)Tunnel DC Gun optics table size and location defined b)Tunnel wall optics table size and location almost defined (2x3) or (2x4) c)Laser transport path defined Tunnel table (DC gun and wall) support and configuration being defined a)Custom concrete block from floor to bottom of optics table top b)Grout floor under block and grout optics table top to top of block c)Optics table top configuration to be defined d)Direct connection, no vibration absorbers 6

7 Raise height of both Custom concrete blocks

Laser Systems Through hole location defined/surveyed, bore work order 80” off floor. (Dave) Laser building modifications (AC unit change, vibration mitigation) (Dave) a)Remove building from piers (planning: carpenters, electrical, and riggers) b)Place steel block in ground (with concrete?) c)Build up from block with heavy pipes that will extend through bored out holes in laser building floor and align with laser optics table legs d)Direct connection (bolted down) to laser optics table legs, no shock absorber Remove optics from 1002F laser building this week (Zhi, Patrick) 8

Laser Systems Laser relay box design (Zhi, Patrick, Steve) a)Latest schematic for Laura (horizontal and vertical??) b)High mirror support (Steve) 9

Laser Systems 10 Vacuum transport line a)3” or 4” stainless steel tubes? Transition at shield wall. b)Need pump/gauge ports + long hose, valve, pump, and gauge c)Need coated, fused Silica windows (4.5” flange/2.5” window?)

11

Vibration Measurements – meeting 6/21/16 Measurements taken in laser trailer, 2:00, and 4:00 (56 MHz). Run is coming to an end send requests to T. Tallerico/V. Badea Request T. Tallerico/V. Badea set up a meeting to present results 12