THE DEVELOPMENT OF A 310MW WIND FARM AND ANCILLARIES IN LAISAMIS DISTRICT, NORTHERN KENYA PRESENTATION.

Slides:



Advertisements
Similar presentations
Intersolar India Conference November 11 th, 2013 FROM NSM TO GRID PARITY MODELS: FEED-BACK FROM EXPERIENCE.
Advertisements

Eskom CSP / Solar Augmentation Conference CSP Project Development Marc Immerman Director Solafrica.
Overview of the South African Renewable Energy Independent Power Producer Programme (IPP Program) Bruce Linke Finance and Projects 30 April 2012.
Green Energy Co-operative of Ontario Introduction to H.A.R.E. (Hamilton Association for Renewable Energy)
Aldwych Overview Aldwych was formed in 2004 to invest in, construct, own and operate power generation, transmission and distribution/ supply businesses.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
1 Power Sector in Tanzania Recent Developments, Current Crisis, Issues, Challenges and Solutions.
Strictly Private & Confidential 1 Tunis, 21 October 2009 Nur Energie Solar Development in the Mediterranean Basin.
Renewable Energy Program Arab Union for Electricity
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
SOLAR IMPACT ON FYI Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
Mini-Grid Based on Renewable Energy (Biomass) Sources to Augment Rural Electrification Implemented by UNIDO.
Longyuan Mulilo De Aar 2 WEF MW Onshore Wind Energy Facility
THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT
October 2004 Wind Power in Denmark How did it start?
Infrastructure for Development Investing in Clean Energy.
Rural Electrification Institutional Experience: Case of TUNISIA Ahmed Ounalli(*) Director, Strategic Studies Group-STEG Energy Week at the World Bank 6-9.
Bridging Nigeria’s Infrastructure Gap By M. K. Ahmad Director General National Pension Commission – Nigeria 1 18 November, 2008.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
Private Infrastructure Development Group (PIDG) A consortium of nine donor organisations who have joined together to help facilitate PSI in infrastructure.
An electricity strategy for South Africa Hein Reyneke Country Manager, South Africa October 2014 PCTI/ /CoB/MRP/79.
Turkish Power System Overview March 2012
Twin Groves Wind Farm Bloomington Moraine McLean County, Illinois A Strong Beginning for Illinois Wind Robert Nagel
Progresses and Challenges of Infrastructure Spending in Timor-Leste By: Antonio Vitor The 2013 Timor-Leste Update - ANU ADB Consultant & MPW Adviser.
Dr. Silas M. Simiyu Managing Director & CEO Geothermal Development Company Ltd May 18, 2011 Development of Geothermal Resources in Kenya.
September Elements of success behind CASA-1000.
1 WIND ENRGY STATUS : PAKISTAN ASIAN CLEAN ENERGY FORUM ND ADB Quantum Leap in Wind Conference GOVERNMENT OF PAKISTAN June 20, 2011.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Energy Commission Ministry of Economic Affairs May 2004 Financing Renewable Energy Development in Chinese Taipei.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Mobilising Aid for Trade: A Global Review
1 Radhika Bharat, Senior Investment Officer, Private Sector Infrastructure Development Africa Carbon Forum, Nairobi, March 2010 Clean Development Mechanism.
Wind, Wind Power and Vestas Implementation of Wind Power.
Wind Energy in Denmark Industry and framework Camilla Holbech, Senior Policy Adviser Danish Wind Industry Association.
Job number/BT/ serial number/ page number 008 BA003 1 Some thoughts on the cost of wind energy Andrew Garrad Garrad Hassan and Partners Cost effectiveness.
MINING AND INFRASTRUCTURE INDABA 2015 ZPC PRESENTATION Presented by: N.F. Gwariro (MD)
BI Marketing Analyst input into report marketing Report TitleElectricity in Namibia Report Subtitle Country profile of power sector, market trends and.
Implementing Power Rationing Programs The Tanzania and Uganda Experience Karen Rasmussen (AFTEG)
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
SEMINAR ON ENERGY: ELECTRICITY TRANSMISSION A presentation to the KENYA – SPAIN MULTILATERAL PARTNERSHIP MEETING By Dr. (Eng.) John M. Mativo Chief Manager.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
AFRICAN DEVELOPMENT BANK KENYA- SPAIN Multilateral Partnership Meeting Nairobi, 9 December 2013.
An Introduction of Silk Road Fund Dan WANG Executive Vice President Algiers, September 2, 2015 Silk Road Fund - Promoting promoting One Belt and One Road.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Funding the Internet of Things Roger Bickerstaff – 15 March 2016.
Getting a Grid Connection to Export Power Energy in Agriculture rd August 2016.
Power Purchase Agreements (PPA) Owner’s Perspective What is a Power Purchase Agreement? Agreement to purchase power from a third-party provider Fixed term:
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Global Offshore Wind Market to reach 60 GW by 2024: Global Market Insights.
Planning and Realisation of Wind Farms
Njuguna Ndung’u, CBS Governor, Central Bank of Kenya
MHI Products © 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.
Executive Board meeting 1 July 2004
Damitha Kumarasinghe Director General
Enron Corp. Board of Directors Presentation
Alternative Energy Promotion Center (AEPC)
Dominican Republic LNG and Power Plan Facility
Presentation to the Enron Corp. Finance Committee
Bangladesh access to sanitation
in the Russian Federation
Financing of Solar power plants
Zahrani & Selaata IPP Projects
GenComm Workshop Galway, Ireland 16/11/2018 GenComm Workshop.
GenComm Workshop Stornoway Scotland 22/11/2018 GenComm Workshop.
Construction of Balkhashskaya TPS
COMMUNITY UPDATE OCTOBER 23, 2013
March, 30 – April 3, 2009, Honolulu, Hawaii
Progress on the Renewable Energy IPP Procurement Programme
Detail | Customise | Optimise
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

THE DEVELOPMENT OF A 310MW WIND FARM AND ANCILLARIES IN LAISAMIS DISTRICT, NORTHERN KENYA PRESENTATION

2 Overview of this presentation l How did it all start? ll A unique wind resource lll The logistic challenge lV By who and how is the project Financed? V Where are we?

3 The project’s history dates back to One of the Founding Fathers knew the site since the mid 80’s; In 2004 he approached Anset Africa to look at developing a Wind Power project on that site. In 2005 Oil prices soared to above USD 45/barrel rendering Wind Power competitive in Kenya. June 2005 KP&P of Netherlands was approached to come and visit the site. September 2005, 1 st MOU signed between Anset Africa, Willem Dolleman and KP&P. This marked the beginning of the development of this challenging project. November 2009 Aldwich International (one of the owners of the Rabai plant in Mombasa) joined KP&P to co-develop LTWP to the present stage.

4 Where are we located?

5 We have an unparalleled and unique wind-resource... This location is particularly favourable, as it lies in the “Turkana Corridor” where a low level jet stream originating in the Indian Ocean creates strong and predictable wind conditions aided by the presence of Mount Kulal to the North and Mount Nyiru to the South which act to produce a Venturi effect accelerating the winds across the proposed location where the wind turbines are to be located.

6 310 MW installed capacity, made up of 365 Wind Turbines, (VESTAS V52) carefully placed to optimize the energy output

7 Stable power during all day Estimated wind power output based on wind measurement for May

8

9 The logistic challenge Upgrading of 206 km of Road Construction of 3 flood bridges Use of 6 wheel drive trucks from Laisamis to site Most demanding parts: 3 transformers 80MT/pc measuring 5x4x4Mt in size truck Loads

10 …with solutions to cater for all logistic aspects and challenges. 4 Route surveys by: Mammoet, SDV Transami Vestas Civicon

11 The wind farm will be connected to the National grid by a 400 kV T. Line from the W.Farm site to Suswa – a distance of 428km. International procurement process: Task Force – MOE, KPLC, KETRACO, KEMA, KPMG, LTWP Public Sector Implementation. Contract awarded to ISOLUX Corsan. (Spain). Contract negotiations completed on Execution period 23 months. Cost Euro M of which 110M from Spain and 32.5 M from GOK.

12 Total Project Cost: Euro 625 M (Wind Farm + BOP only) Debt/Equity Ratio: 70% Debt (437.5M) 10% Mezanine (62.5M) 20% Equity (125M) Equity: % Aldwych International. (UK) 25.25% KP&P (original promoters, Netherland) 12.50% NORFUND (Norway) 12.50% VESTAS WIND SYSTEMS (Denmark) 6.25% IFU (Denmark) 12.50% FINFUND (Finland) 0.25% SANDPIPER (Private Investment) Debt Lead Arranger: African Development Bank (AfDB) Co-Arrangers: STANDARD BANK & NEDBANK By who and How is the project financed?

13 PPA details We sold the power to KPLC PPA terms: –fixed price (20 years): 7.52 Euro cents per kWh –Escalation only on O&M part of the costs –Take or pay –20 years term after full commissioning Status: SIGNED ON 29 th January 2010 and restated on 30 th September 2011 Carbon Credits: Approx CER’s/y of which the 1 st US Cent/KWhr returned to Kenya.

14 The project has an extensive social responsibility component… Well designed Corporate and Social Responsibility Programme covering 20 years and implemented in 4 x 5 year development plans focusing on: Water Health and sanitation Education Electrification Carbon Credits: Up to USD 4.5 Million/year to be devoted to the development of the areas surrounding the Wind Farm and along the Transmission Line route.

15 All EPC Contracts completed and initialed. PPA in place. IPP license in place. GOK Letter of Support in place. Term Sheet from lenders completed. Financial Close expected by 19Th Dec Expected date of construction start April 2014 Where are we now?

16 We take this opportunity to extend our gratitude to the Government of Kenya, KPLC, ERC and KETRACO for the unwavering support and faith they have extended to this challenging project. Acknowledgements!

17 THANK YOU