CCS reference for Civil Engineer Works H3 line Existing Floor AWAKE line
CCS reference for Civil Engineer Works Existing Floor Start digging at x = y = z = Flat part at x = y = z = Old coordinates: x = y = z = H3 line AWAKE line
CCS reference for Civil Engineer Works From end of TT61: ~ 50 m line to plasma cell (tbc) 2° angle wrt floor surface (bending) Plasma cell entrance ~1 m below flat part (3 m underground) 10 m long plasma cell + 30 m drift before dump (1.4 m) dump entrance 4.4 m underground 10 m long dump. In total: 100 m, 2° slope Preliminary estimate at dump exit: x = ???? (tbd) y = z = It could be underestimated (to be recalculated after lattice design and matching )