CCS reference for Civil Engineer Works H3 line Existing Floor AWAKE line.

Slides:



Advertisements
Similar presentations
Find the slope of the tangent line to the graph of f at the point ( - 1, 10 ). f ( x ) = 6 - 4x
Advertisements

T h e G a s L a w s. T H E G A S L A W S z B o y l e ‘ s L a w z D a l t o n ‘ s L a w z C h a r l e s ‘ L a w z T h e C o m b i n e d G a s L a w z B.
Joanne Beebe-Wang 7/27/11 1 SR in eRHIC IR Synchrotron Radiation in eRHIC IR and Detector Background Joanne Beebe-Wang Brookhaven National Laboratory 10/
Parallel and Perpendicular Lines
#1#1 Write the equation of the line that passes through the points: #3#3 Write the equation of the line that passes through (8,2) and has the same x-intercept.
Beamline 12 Project BL12 In-vacuum Undulator Source August 11, 2004 Andy Ringwall BL12 In-vacuum Undulator Source August 11, 2004 Andy Ringwall.
Magnet rotated by 5.9 degree Distance from entrance point to magnet right bottom corner m.
Forces Acting on a Control Volume Body forces: Act through the entire body of the control volume: gravity, electric, and magnetic forces. Surface forces:
Integrated Civil Engineering Design Project (Building Structure Design Example) CIVL 395 HKUST By : Ir. K.S. Kwan Date: 4/07.
All rocks are classified by how they form. Rocks can form a couple of different ways: Intense heat and pressure Cooling Recycling of old rock inside the.
Home Truths (P1) Ariadna Aston, Ben Greenaway, Gurcan Ozyigit, Joanne Langford, Stavros Gargaretas, Yogesh Taylor.
Flashback The 2 diagrams below show a circle of radius 1 inch with shaded sectors of angle x°, for 2 different values of x. One of the following.
Notes Over Reflections A _______________is a change of position or size of a figure.
- is a flat surface that extends in all directions. Objective - To identify angles as vertical, adjacent, complementary and supplementary. Plane.
Considerations on laser-p+ beam merging for CB, BG, PM.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Fish Passage Lessons Learned on the Hudson River Hudson Valley Restoration Coordination Meeting Columbia Greene CC, Hudson, NY, Oct. 15, 2015 Curtis Orvis,
LIU external beam dump review External beam dump option A: branching off from LSS6 J.L. Abelleira Thanks to: F. Velotti, B. Goddard, M. Meddahi, H. Vincke,
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
Preliminary Design of Electron Beam line F. Velotti, C. Bracco, B. Goddard and M. Meddahi.
Gas Coordination Meeting Cabling. General Philosophy Cables between racks within the Surface Gas Building or between racks within the Underground Gas.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
Objective: To design a labyrinth that a Nano Bug can successfully navigate. Activity Details: Each team of three will be given one NanoBug. You team is.
WUHSD Geometry Cell Phone Tower Performance Task Pre-Performance Activity 1)Equations from Coordinate Geometry 2) Task-Specific Vocabulary.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
LTR for ILC e- (eLTR) RF section solenoid section.
{. { { { { { { Describe what it means if a shape is flat. Can you think of any two- dimensional shapes?
Preservation of Magnetized Beam Quality in a Non-Isochronous Bend
4.1 A formula for slope Learning Targets learn how to calculate the slope of a line given two points on the line ● determine whether a point lies on the.
Primary Beam Lines for the Project at CERN
3.3: Point-Slope Form.
AWAKE proposals for BE/BI
Plasma Cell Leukemia Presenting as a Chest Wall Mass: A Case Report
Tapered Beams: Engineers often taper beams so that the beam strength is larger where the bending moment is larger.
3.3 Rate of Change and Slope
Coordinate Algebra Unit 3
Consider the function {image} and find the value of {image} Choose the correct answer from the following:
Geometry Agenda 1. ENTRANCE 2. Go over Practice
Are you ready for the test?
Section 11.3 Euler’s Method
Geometry Agenda 1. ENTRANCE 2. Go over Practice
Geometry Agenda 1. ENTRANCE 2. Go over Practice
Name:______________________________
1.5: Velocity-time graphs
Mathematics Unit 45: Twisted Building
EXIT PROBLEMS SLOPE.
Point-Slope Form y – y1 = m(x – x1)
Geometry Agenda 1. ENTRANCE 2. Go over Practice
Cell Culture Engineering XI


{

















Presentation transcript:

CCS reference for Civil Engineer Works H3 line Existing Floor AWAKE line

CCS reference for Civil Engineer Works Existing Floor Start digging at x = y = z = Flat part at x = y = z = Old coordinates: x = y = z = H3 line AWAKE line

CCS reference for Civil Engineer Works From end of TT61: ~ 50 m line to plasma cell (tbc) 2° angle wrt floor surface (bending) Plasma cell entrance ~1 m below flat part (3 m underground) 10 m long plasma cell + 30 m drift before dump (1.4 m)  dump entrance 4.4 m underground 10 m long dump. In total: 100 m, 2° slope  Preliminary estimate at dump exit: x = ???? (tbd) y = z = It could be underestimated (to be recalculated after lattice design and matching )