THEMIS SOCScience Data Products − 1December 10, 2005 Data Products Timothy Quinn.

Slides:



Advertisements
Similar presentations
THEMIS Science Software Training1July 2007 The THEMIS Graphical User Interface J. McTiernan 23-Jul-2007
Advertisements

THEMIS Science Software and Products Slide − 1SWT - UNH, September 22, 2008 THEMIS Software & Products Agenda Products L1 & L2 – Jim L & Jim M TDAS Plotting.
Chapter 1 Number Systems and Codes William Kleitz Digital Electronics with VHDL, Quartus® II Version Copyright ©2006 by Pearson Education, Inc. Upper Saddle.
Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
IES Calibration Modeling Phil Valek and Roman Gomez May 29, 2013.
M. Zareinejad 1. 2 Outline # Sensors –––– Sensor types Sensor examples #Actuators Actuator types Actuator examples ––––
Current status of A. Matsuoka, Y. Miyoshi, I. Shinohara, T. Takashima, K. Asamura, and ERG project team ERG project ERG project Van Allen Probes SWG 2014/09.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
Correlation Analysis of Electrostatic Fluctuation between Central and End Cells in GAMMA 10 Y. Miyata, M. Yoshikawa, F. Yaguchi, M. Ichimura, T. Murakami.
MPSREFI- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW “Our Gateway to the Cape…” The Electric Field Instrument (EFI) John Bonnell University of California.
THEMIS End of Prime Mission ReviewESA- 1 UCB, November, ESA Plasma Instrument End of Prime Mission Review Dr. James McFadden and Dr. Charles Carlson.
Aurora, Substorms, and THEMIS D. G. Sibeck NASA/GSFC THEMIS Project Scientist.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
Number Systems and Codes
Plastic Software Status and Data Access March 27, 2007 Lynn Kistler & Lorna Ellis.
THEMIS Workshop 1 UC Berkeley, 18 December 2004 Data Products and Access Tim Quinn UC Berkeley.
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
THEMIS SRR 1 UCB, June 8-9, 2003 Solid State Telescope Davin Larson SSL.
THEMIS PROJECT NAS UCB, June 2003 Science Operations Tim Quinn 4 June 2003.
1 THEMIS Inner Magnetosphere Review, Dec 20, 2008 Summary of THEMIS results in the inner magnetosphere Future mission operations discussion: –Science targets.
THEMIS IDPU FSW 11/29/ UCB THEMIS IDPU FSW V4 Mission Profile Tests Peter Harvey Michael Ludlam.
Magnetospheric MultiScale Mission (MMS) Overview
THEMIS ESA SWT ESA- 1 UCB, Aug ESA In-Flight Calibration and First Results J. McFadden, C. Carlson, D. Larson UC Berkeley SSL.
Simple Approach to Salvaging THEMIS ESA Moments Prior to Boom Deployment Vladimir Kondratovich David G. Sibeck.
EGU General Assembly 2006, 2-7 April, 2006, Wien ST6 Multi-point measurements of solar-terrestrial plasma: results and future perspectives Scientific objectives.
Lander Experiment ROMAP
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
M. Zareinejad 1. 2 Outline # Sensors –––– Sensor types Sensor examples #Actuators Actuator types Actuator examples ––––
EFW SOC DATA John Wygant SWG June Redondo Beach.
THEMIS-ERG-Orbitals1 UCLA, March 18-19, 2010 THEMIS in the RBSP, ERG, Orbitals era Vassilis Angelopoulos UCLA ESS/IGPP & SSL/UCB.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
How ARTEMIS Contributes to Key NLSI Objectives C.T. Russell, J. Halekas, V. Angelopoulos, et al. NLSI Lunar Science Conference Ames Research Center Monday,
Pre-THEMIS-launch Science MeetingSoftware- 1 Cape Canaveral, Feb 13, 2007 Pre-THEMIS-Launch SCIENCE MEETING Data Analysis Software Tools Bromund GST Inc.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Operational Concept.
THEMIS SOCScience Data Products − 1March 29, 2006 Science Data Products Timothy Quinn.
Zou Ziming 1 Ma Wenzhen Li Lei Zhao Hua Wang Chi 1: Center for Space Science and Applied Research Chinese Academy of Sciences Moscow ·
Aquarius Level 0-to-1A Processing Rule #1: save everything from the Level 0 data. Rule #2: never forget Rule #1! The objective is to ensure that the Level.
SST- Solid State Telescope ESA - Electrostatic Analyzer Science Measurement and Operational Requirements.
PEACE DAA Status Andrew Fazakerley, Iryna Rozum, Andrew Lahiff, Branislav Mihaljčić & the PEACE ops team 5 November 2009, DAA meeting, Paris, France MSSL.
PDS M/C November 2012 PPI MAVEN Report PDS4 Mission Report: MAVEN PDS Management Council November 28, 2012 J. Mafi.
OVT status Yuri Khotyaintsev Swedish Institute of Space Physics, Uppsala and the OVT team ovt.irfu.se November 18, 2015.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
9 th CAA Cross-Calibration Workshop, Jesus College, Cambridge, UK, March /17 CAA Graphics: Pre-generated/On-demand Panels and Cross-Calibration.
CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu EDI Status of Calibration and Archiving Activities.
Cluster Active Archive Science User Working Group (CAASUWG) - update Matt Taylor on behalf of CAASUWG.
8th Cross-calibration Workshop CIS data delivery report Kinsale – October 2008.
Double Star Active Archive - DWP/STAFF 1 Double Star Active Archive STAFF/DWP Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin.
PLASTIC Post Launch Data Flow Lynn Kistler & Lorna Ellis May 2006.
Working with MAVEN Data
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
CIS Data Archival Status
10th CAA Operations Review Annual Report of the CIS Experiment
Cluster Active Archive – Wideband data BM2 mode
EDI – CAA STATUS REPORT EDI CAA Status
Time Series Analysis of Particles and Fields data
THEMIS INSTRUMENT SUITE
Databases for THEMIS and GEOTAIL Magnetopause Crossings at GSFC
THEMIS INSTRUMENT TRAINING
THEMIS Electric Field Instrument
Kinetic Theory.
On Feb 12, a minor THEMIS conjunction, TH-C at 18RE in the tail, observed the first indication of reconnection Earthward of it. Substorm ~03:00-04:30UT.
Using MMS Data with SPEDAS
Homework #7, Due June 3rd Find a THEMIS interval of interest to your research. Read the thm_sst_cleanup.pro and crib_sst_contamination.pro routines. Plot.
Presentation transcript:

THEMIS SOCScience Data Products − 1December 10, 2005 Data Products Timothy Quinn

THEMIS SOCScience Data Products − 2December 10, 2005 Level 0 (L0) Data File The L0 data files will:  Contain single AppID packet type  Cover a 24 hour period  Be time ordered  Have overlap deleted  Remain compressed  Contain a 1024 byte ancillary data header

THEMIS SOCScience Data Products − 3December 10, 2005 Level 0 (L0) Data File Header (1024x8 ) Packet (Nx8) Packet (Nx8) Packet (Nx8) Packet (Nx8) Packet (Nx8) 1024 Byte File Header: Bytes 0-19: A 20-byte identifier (could be ASCII) which denotes this as a THEMIS L0 APID file. Bytes 20-23: Four binary bytes with SCID in long, unsigned integer format (MSB first). Bytes 24-27: Four binary bytes with APID in long, unsigned integer format. Bytes 28-31: Four binary bytes with the number of packets in long, unsigned integer format (MSB first). Bytes 32-35: Four binary bytes in 32-bit unsigned MSB format containing the full 4-digit year of the Start Date. Bytes 36-39: Four binary bytes in 32-bit unsigned MSB format containing the Month (1-12) of the Start Date. Bytes 40-43: Four binary bytes in 32-bit unsigned MSB format containing the Day-of-Month (1-31) of the Start Date. Bytes 44-47: Four binary bytes in 32-bit unsigned MSB format containing the version number of the file. Bytes : TBD Packet Size: Nx8, where N is based on APID

THEMIS SOCScience Data Products − 4December 10, 2005 Level 1 (L1) Data Products L1 Probe State File (CDF Format) This will include: Probe Position (GEI Coordinates) Probe Velocity (GEI Coordinates) Probe Spin Axis Attitude (GEI Coordinates)

THEMIS SOCScience Data Products − 5December 10, 2005 Level 1 (L1) Data Products L1 Calibration Data Files(ASCII or CDF Format) This will include: FGM Mounting Orthogonality and Gain FGM Boom Angles SCM Boom Angles SCM Gains ESA MCP Gains, one per anode for 16 anodes x 2 heads SST Gains, 3 per telescope x 4 telescopes x 2 shutter conditions (open/closed EFI 1 current and 3 voltages per sensor x 6 sensors

THEMIS SOCScience Data Products − 6December 10, 2005 Level 1 (L1) Data Products L1 Data File(CDF Format) The CDF data files will: Contain ALL APIDs Cover a 24 hour period Be uncalibrated The end user will process this file using the other L1 products, UCB software, and GSFC/NSSDC CDF software to produce physical quantities: (L1 Products)x(NSSDC/CDF S/W)x(UCB S/W)=Physical Quantities

THEMIS SOCScience Data Products − 7December 10, 2005 Level 2 Data Products Key Parameter Data Sets These will include the following in CDF format: 3-D magnetic field, DC waveforms and AC spectrograms 3-D electric field, DC waveforms and AC spectrograms, probe electric potential Core (10 eV - 40 keV) ion density and velocity moments, temperature and pressure tensor, energy spectrogram Core (5 eV-30 keV) electron temperature and pressure tensor, energy spectrogram Energetic ion and electron fluxes GMAG Activity Index Keograms (Ground image summaries)

THEMIS SOCScience Data Products − 8December 10, 2005 Summary ProductRequired S/WDistribution Medium Level 0 (L0)Instrument Team IDL UCB C-Library UCB LAN Level 1 (L1)UCB and CDF S/WCD/DVD to Co-I UCB Website UCB LAN Key Parameter (KP)CDF S/W or UCB and CDF S/W UCB Website VMO CDAWEB Summary PlotsImage Viewing S/WUCB Website