LINDBERGH Chesterfield Mall Chesterfield, MO Prepared by: Rick Zavala Week 10 of 10.

Slides:



Advertisements
Similar presentations
Supply presentation FACELIFT. Who Are We ? Design and Architectural Studio Construction and Trade Company Service Center.
Advertisements

The following photo essay shows a 2011 Hyundai Equus Sedan being transformed from a running passenger car into a specialized platform used for photographing.
Carriage house expansion at the Grover Cleveland birthplace
1 Zero Tax Increase Referendum: Community Information Session.
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
(Builder Marketing Message) (Builder Logo) Consider adding your logo to the master slide.
Background Surface Treatments
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725.
The Dalles Middle School
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Source One Source One Network and Building Solutions.
Expand Media Wall & Podium Case Training Video’s & Instructions.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.
American Arches America's Premium Custom & Stock Arch Manufacturer Using Computerized Equipment and Commercial Systems American Arches America's Premium.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Location & Exterior/Interior Design The Retail Flower Shop.
Interior Lifestyles Pvt. Ltd Welcome to our six step process for Interior designing of your commercial space. 6 6.
Chapter 11, Section 3. Interior Installation Installing a curtain rod Mounting Venetian blinds Mounting a window shade Hanging a picture.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
Ria Thompson, DenDesignery UNDER-STAIRS BUILT-IN STORAGE CONCEPT CADL03/6207, HND Stage 1, Final.
House Design Project Overview What each student must accomplish – 10 journals: date, time, weather, and what was accomplished or learned – Bubble drawings.
Riverside Community Schools Overview of Summer Maintenance Projects.
1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Sonora Clubhouse Ralene Cox IDE222 May 10, Inspiration Inspiration.
Kitchen ItemCostWhereStyle Sink Faucet$135 (paid)C-listBrushed stainless Sink ` Main Countertop Island Countertop Island Cabinet Cabinet hardware.
Quetzal FOOD SERVICE SOLUTIONS. Front of House Seating, Counters, Bars, Displays, Kiosks, Booths, Desks, and Signage.
Hard Floor Care VCT floor finish application This presentation is available for review at:
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
DIL-009 Phasing Plan TASKS START END CONSTRUCTION (7 weeks) 02/07/11 04/01/11 PHASE 1: BACKROOM AND GROCERY (2 WKS) 2/7/11PM2/18/11AM.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Interior Painting How to paint like a pro.. Step 1: Preparation Remove as many items from room as possible Cover any remaining furniture & floors Remove.
Visual Merchandising Rhiannon Gagin 1/30/12 3A.
CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD CHATSWORTH HSChatsworth.
Section drawings know standard construction finish attachment and dimension custom fabrications 1.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Saunders Road, Unit 8, Barrie, ON L4N 9A4 T E.
We clean from top to bottom!. Professional Cleaning Services Office Programs –Restroom cleaning and disinfecting –Trash gathering, collection, removal.
The Art & Science of Visual Merchandising How Human Anatomy, Physiology and Kinesiology relate to the shopping experience in your store. --Anne Cecil,
How can I find the area and perimeter of a rectangle? MCC.4.MD.3.
Loft Conversions Bringing you the latest in sprayfoam insulation technology.
Queen Anne Academic Center Prince George’s Community College 301 Largo Road Largo, Maryland By: Austin Heidelbaugh.
Chicago Public Library Board of Directors Meeting January 13, 2015 Projects in Planning Schedule/Activity Phase 1 – Under construction. Refer to YOUmedia.
Rosemead.
Children’s Section of the Library Entrance lobby from Main Street looking east.
Click here for the LIVE WEBCAM
Introducing the Dakota 28483D
Click here for the LIVE WEBCAM
Assembly And Installation Of Ikea Kitchen Cabinets
Housing to meet Special Needs
Western Union Plano-O-Grams Check Casher, Grocery, Independent
Objective 6.05: Types of Architectural Drawings
Housing to meet Special Needs
October 2017 Mustang panther package b update
Objective 6.05: Types of Architectural Drawings
City of Santa Cruz Accessory Dwelling Unit Development Program
DOWNTOWN TAMPA HISTORIC LANDMARK
Project Name – ID # 7/1/2009 Current Project Status Project Issues
Building & Property Committee
J bathroom/ hi bedroom/ I kitchen
C bathroom/AB and B Kitchens
Minuteman Vocational Technical Regional High School Progress
Proposed New Layout for Lobby Eagle Hospitality Interiors
Presentation transcript:

LINDBERGH Chesterfield Mall Chesterfield, MO Prepared by: Rick Zavala Week 10 of 10

Electrical panels Fitting rooms area doors and walls painted Electrical Panels stock room No change only modification Modifications complete 12/1/14

Existing stock room Existing stock room shelving. Painted one coat 12/19 and existing VCT strip & Wax 12/23 for turnover on 12-24

Existing restroom hall ways Signage and water coolers VCT patched, new vinyl wall base installed 12/11 complete Hallways one coat paint applied Painting to be complete 12/19 and final cleaning 12/23

Existing restrooms Fully painted and new EMR lights installed 12/1 Inspected 12/11 Cleaning TBD 12/23

Sales floor at POS Back wrap installed 12/1, tile complete New electric feed installed for back wrap sign. Wall repainted per Marco Was white per drawings 1) Cash wrap delayed, back wrap sign, trim, millwork panels, lights and counter tops not on site as of 12/18 Estimated delivery date 12/22 2) Expansion floor cover not installed Estimated delivery and install 12/23 3) Fabric for Barrisol columns not complete A)Replacement LED arrived today will install 12/19 B)Fabric to be installed 12/22

Sales floor “F” fixtures North wall Fixtures installed & lighting partially 7 LED transformers & can lights Notice no hang bars in the picture of the F fixture to the LHS Per today they are to be installed two per fixture Fixtures installed per plans

Sales floor Middle of store north east showing FINELIGHTS w/ new tile Base, floor tile complete Walls painted white per plan

Fitting room area Fitting rooms area doors and walls Painted, floor tile 100% complete Wall base & door hardware 12/19-12/20

Fitting rooms Interior of ADA fitting Room. Wall base and benches TBD 12/ /20

Store front from north to south Store front glass & break metal Complete Cleaning 12/23

Sales floor Sales floor looking from back to front Will need to be stocked into store, un wrapped, assembled, set into place & trash removed Cleaning 12/23

SHOE Fixture walls Shoe fixture walls South and east Floor tile 100% complete Modifications made to wall panels to Insure proper fit LED lights installed & working Glass onsite Missing glass clips and suction cups To install Due to arrive 12/23