Status of the ALS and APEX RF Systems at LBNL RF Group: K. Baptiste, S. Kwiatkowski (retired), Q. Du, M. Vinco, J. Julian (retired) ME Group: P. McKean.

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

THE RADIO FREQUENCY SYSTEM FOR SOLARIS TOWARDS OPERATION
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
1.0 MW / 175 MHz Source for IFMIF: a study of alternatives
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Development of Solid State Long Pulse Klystron Modulators
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
Thales Components & Subsystems
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
1 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva CEA-SACLAY HIGH VOLTAGE MODULATOR FOR PULSED KLYSTRONS CEA Saclay RF teststand MODULATOR.
Performance of the Advanced Photon Source 350-MHz 1MW CW Klystrons Doug Horan RF Group Accelerator Systems Division CWRF08 Workshop March 25-28,2008.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
 High Power RF Systems (352 MHZ - 12 GHz)  High Efficiency Power Sources  High Voltage Systems  High Gradient Accelerating Structures.
I. Syratchev, April 2015, EuCARD2, Barcelona. Review of Efficient RF Sources I. Syratchev, CERN.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Anders Sunesson RF Group ESS Accelerator Division
Operational experience of high-power RF at Diamond Light Source Chris Christou, Pengda Gu, Alun Watkins Diamond Light Source.
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Solid State RF High Power Amplifier Developments at SOLEIL Ti RUAN, on behalf of SOLEIL RF Group CWRF10 CELLS-ALBA Barcelona Spain May
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
7th CWRF 2012 Workshop - BNL, May 7-11, 2012
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
NSLS I : Challenges and upgrades on 30 year old high power RF systems Aditya Goel Brookhaven National Laboratory 08 May 2012.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
CWRF 2008, Geneva, March Alessandro Fabris on behalf of the Elettra RF Group Sincrotrone Trieste, Trieste, Italy. Elettra RF System Upgrade:
Operational experience of high-power RF at Diamond Light Source
The LHC RF Power Systems Skip the intro… CWRF08 workshop - March'08 1 Presented by : Luca Arnaudon Slides by : Olivier Brunner & Luca Arnaudon Important.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
Status of the 1.2 MW MB-IOT for ESS Morten Jensen CLIC Workshop 2016, January, CERN.
650 MHz Solid State RF Power development at RRCAT
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
New MI Cavity Progress and Plans 2010 Joseph E. Dey Project X Collaboration Meeting September 8, 2010.
ALBA RF Systems Francis Perez.
B. Buonomo for the DAFNE LINAC group First BTF Users Workshop – LNF 6-7/5/
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Operation Status of the RF Systems and Taiwan Photon Source
Status of the ELETTRA RF Plants
Areal RF Station A. Vardanyan
The Survey of the Power Supply Reliability at SSRF
How does a klystron work? TE-MPE Section Meeting Karolina Kulesz
Development of high-power IOTs as an efficient alternative to klystrons Morten Jensen Energy for Sustainable Science 24 October 2013, CERN.
Status and New Developments of RF Systems of ALBA
Development of X-band 50MW klystron in BVERI
An X-band system for phase space linearisation on CLARA
Status of the ALS and APEX RF Systems at LBNL
Construction and Commissioning of Electronic Test Benches
352MHz Klystron Control for the 3MeV Linac test stand
Notkestrasse 85, Hamburg, Germany
IFMIF-EVEDA RF POWER SYSTEM
CEPC RF Power Sources System
PEP-II RF System Status and Upgrades
RF systems introduction
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status and New Developments of ALBA RF Systems
Status of the ASTRID2 RF systems
Status and New Developments of ALBA RF Systems
IOT operation in the SPS Long term experience TWC 800 MHz
Presentation transcript:

Status of the ALS and APEX RF Systems at LBNL RF Group: K. Baptiste, S. Kwiatkowski (retired), Q. Du, M. Vinco, J. Julian (retired) ME Group: P. McKean (retired), G. Harris 9 th CWRF Workshop - ESRF, June 21-25, 2016

Scope 9 th CWRF Workshop - ESRF, June 21-25, 2016 ALS RF Systems Injection System Electron Gun (125 MHz) GTL Sub-Harmonic Bunchers (125 MHz & 500 MHz) S-Band Linac Modulators (2.998GHz) Booster RF System (500 MHz) Storage Ring Storage Ring RF System (500 MHz) SRRF Reliability 3 rd Harmonic Cavities APEX RF Systems VHF Photo-Cathode Gun L-Band Buncher L-Band Linac Modulator

ALS’s RF Systems 9 th CWRF Workshop - ESRF, June 21-25, GeV BOOSTER SYNCHROTRON 1.9 GeV STORAGE RING SYNCHROTRON LTB BRF SR RF 3rd HC 50 MeV LINAC

Injection System – Electron Gun & Linac 9 th CWRF Workshop - ESRF, June 21-25, 2016 Electron Gun 125 MHz Buncher 500 MHz Buncher 3 GHz Buncher Acceleration Guide #1

Gun thru 3 GHz LINAC RF System 9 th CWRF Workshop - ESRF, June 21-25, 2016 Proposing an upgrade to a Digital LLRF Controller

E. Gun Electronics Rack & Block Diagram 9 th CWRF Workshop - ESRF, June 21-25, 2016 E. Gun Rack (LI01) Block Diagram In Service: 1989 Proposing an upgrade for Drive & Control Electronics

E. Gun Hot Deck, Gun Body & Cathode 9 th CWRF Workshop - ESRF, June 21-25, 2016 Gun Electr. Cart, Hot Deck Cathode Eimac YU-171 Gun Body Cathode Lifetime: ~4 yrs Gun Pulse Generation

125 MHz & 500 MHz Sub-Harmonic Bunchers 9 th CWRF Workshop - ESRF, June 21-25, 2016 Maintenance Items: Amplifier Air Cooling SS Drive amplifier HVPS In Service: 1989 Proposing an upgrade to a Digital LLRF Controller

Sub-Harmonic Buncher Amplifiers 9 th CWRF Workshop - ESRF, June 21-25, 2016 Triode Gain = 15dB Up to 20kW Pulse, 6 kW In service: 1989 Lifetime: yrs Cost: $1550 ea Eimac CV-2404 Eimac 3CPX800A7 Eimac CV MHz Cavity Amplifier 500 MHz Cavity Amplifier

LINAC PFN Modulators 9 th CWRF Workshop - ESRF, June 21-25, 2016 Thales TV-2002 DoD: 24MW, 2us, 1 Hz Lifetime: Mod #1: 17 yrs, 10 yrs, 2+ mo Mod #2: 9 yrs, 14 yrs, 2 yr, 2+ yrs Failures: Thyratron CX-1666 HV Caps HVPS & Cable Focus PS & Magnets In Service: 1989 Low Gain Klystrons

Booster Ring RF Parameters for 1.9 GeV 9 th CWRF Workshop - ESRF, June 21-25, 2016 Present Beam current4 mA Dipoles Radiation< 5 kW Cavity Dissipation43 kW W.G. & other losses< 6 kW Total RF Power Reqr’d54 kW Total RF Power Installed80 kW

Booster Ring RF System 9 th CWRF Workshop - ESRF, June 21-25, 2016 Proposing an upgrade to a Digital LLRF Controller

Booster Ring RF Amplifier 9 th CWRF Workshop - ESRF, June 21-25, 2016 Commercial IOT Based Broadcast TV Transmitter (modified) Cavity Power, 54 kW pk SP Failures: Grid Bias PS HV Cable which led to an IOT failure HV Isolation Transformer Thyratron In Service: 2006

IOT Amplifier 9 th CWRF Workshop - ESRF, June 21-25, 2016 IOT #1: 3 yrs (18k hrs) Failed due to poisoned cathode from HV cable fault IOT #2: 7+ yrs (+45k hrs) CPI CHK2800W Tuning Range: MHz CPI K2H80W MHz Specification: 80 kW CW 130 kW pk Gain = > 23dB Eff. > 65% Operating Parameters V k = 32.1 kV I k = 2.8 A Eff = 60.3% Gain = 23.1 dB RF Out = 54 kW pk

SR Ring RF System Parameters for 1.9 GeV 9 th CWRF Workshop - ESRF, June 21-25, 2016 PresentFuture Beam current (mA) Number of Insertion Devices1113 Gap PositionsNomMinNomMin Dipoles Radiation (kW) Insertion Device Radiation (kW) Power Loss for 3 rd HC (kW)6999 Cavity Dissipation (x2) (kW)4343/50 43/5043/53 W.G. & other losses (kW)78/108/1010/12 Total RF Power Reqr’d (kW)266293/305293/305304/322 Total RF Power Installed (kW)300300~360~360 Cav/Window Power Limit (kW)330330

Upgraded SR RF System 9 th CWRF Workshop - ESRF, June 21-25, 2016 DLLRF to be installed Jan-2017

Upgrade Sequence 9 th CWRF Workshop - ESRF, June 21-25, 2016 Phase I Establish New Klystron Site #2 Phase II Upgrade HVDC PS, Replace Crowbar with HV Dis-Conn SW, New Klstron in Site #1

Waveguide Switch Matrix 9 th CWRF Workshop - ESRF, June 21-25, 2016 Phase IIIa

Digital LLRF & Controls 9 th CWRF Workshop - ESRF, June 21-25, 2016 Phase IIIb, Jan 2017

SR Klystron, Thales 2161L 9 th CWRF Workshop - ESRF, June 21-25, 2016 Operational Hours Black Heat 4773Black Heat 4773 Standby29605Standby29605 HV29126HV29126 Transmit27736Transmit27736 Klystron Operating Parameters V k = kVI k = 9.55 AV k = kVI k = 9.55 A V a = 32.8 kVI a = 1.6 mAV a = 32.8 kVI a = 1.6 mA Eff = 51.53%Gain = dBEff = 51.53%Gain = dB μP = 1.61RF Output = kWμP = 1.61RF Output = kW Failures: Mod-Anode PS PLC SP zeroing Filter Capacitor In Service: 2012

Percentage of Scheduled Beam Time Lost to SRRF & Non-Latching Faults by Fiscal Year SR RF Reliability 9 th CWRF Workshop - ESRF, June 21-25, 2016 Goal for SRRF system based on 5000 hours of User Beam time: 0.3% Percentage of Scheduled Beam Time Lost to SRRF & Non-Latching Faults by Fiscal Year

SRRF Reliabilty 9 th CWRF Workshop - ESRF, June 21-25, 2016 SRRF Faults, MTBF (in hours): Mean time between faults, FY FY2016* Goal for SRRF system based on 5000 hours of User Beam time: 500 hrs

SR RF Reliability 9 th CWRF Workshop - ESRF, June 21-25, 2016 Goal for SRRF system based on 5000 hours of User Beam time: 1.5 hrs SRRF Faults, MTTR (in minutes): Mean time to recovery, FY FY2016*

3 rd Harmonic Cavities (passive) 9 th CWRF Workshop - ESRF, June 21-25, 2016 Failures: Vacuum Feedthru

APEX RF (Advanced Photocathode Experiment) 9 th CWRF Workshop - ESRF, June 21-25, 2016

APEX RF Systems 9 th CWRF Workshop - ESRF, June 21-25, 2016 Gun VHF Tetrode Amplifier 2 x 60 kW CW Buncher L- Band SSA 4 x 2.5 kW CW Linac L-Band Klystron Modulator 25 MW, 10 us

APEX Gun RF Tetrode Amplifier System 9 th CWRF Workshop - ESRF, June 21-25, 2016 Operational Hours Tube #1Tube #2 Black Heat Black Heat Standby Standby HV HV Transmit Transmit Tetrode TH 571B Parameters V a = 9.7 kVI a = 7.47 AV a = 9.7 kVI a = 7.47 A V s = 692 VI s = 165 mAV s = 692 VI s = 165 mA V g = -140 VI g = 10 mAV g = -140 VI g = 10 mA Eff = 62.5%RF Out = 45 kWEff = 62.5%RF Out = 45 kW Failures: Filament PS SSA Drive Amp Fan Control SSA Drive Amp PS Fail Intrlk SSA Drive Amp Pre-Amp SSA Drive Amp Output Module HV Current Limiting Resistors HPAHVPS In Service: 2011 Proposing to build a SSA version of this system for the LCLS II ptoject

APEX Buncher SSA RF Amplifier 9 th CWRF Workshop - ESRF, June 21-25, 2016 In Service: GHz 4 x 2.5 kW SSA Operates at 2.0 kW ~200 hrs Failures: Logic card modification

APEX Linac RF System (Klystron and Modulator) 9 th CWRF Workshop - ESRF, June 21-25, 2016 Linac 1 probe Linac 2 probe 25 MW – 10  s 10 Hz Linac 1 coupler reverse Solid State L-Band Modulator 10 us, 10Hz In Service: 2015, ~300 hrs

APEX RF (Advanced Photocathode Experiment) 9 th CWRF Workshop - ESRF, June 21-25, Overheated area C C

APEX RF (Advanced Photocathode Experiment) 9 th CWRF Workshop - ESRF, June 21-25, 2016 ~ 27” from Gun coupler plane RF /4 ~ 15.9 ” RF /4 ~ 15.9 ” ~ 19” from RF window 1 The internal conductor Melted Teflon bushing Hole Missing from measurements, additional ~5” for length of coupling loop This hole would then be at 27” + 5” = 32”, ~ RF /2 This hole is at a current node. The copper is melting here not arcing.

APEX RF (Advanced Photocathode Experiment) 9 th CWRF Workshop - ESRF, June 21-25, 2016 RF Window Air side Copper transition Vacuum side Facing parts These arc marks are at a voltage maxima. There is no sign of overheating due to high currents. This arcing being ~3” from window would then be at 19” - ~3” = 16”, ~ RF /4 EHT (Enhanced Heat Transfer coax line) rating from company: De-rating for 0 PSIG in line = Average Power Rating = 89 kW derated to 78 kW Peak Voltage Rating = 13 kV Peak Power Rating = 3,685 kW (Ppk = Vpk^2/Zo). Not specified for how long. APEX max operation conditions: Power per coax line = 60 kW CW max (50 kW nominal). Peak Voltage in line = 1.414*sqrt(Pavg * Zo) = 1.414*sqrt(60000 * 50) = 2.45 kV Peak Power in line = Vpk^2/Zo = 2449^2 / 50 = 120 kW Peak Power in line from standing wave: Vpk = 4.9kV, Ppk = 480kW The RF power remained ON for > 4 minutes in this condition due to improperly configured intrlks and a lack of synchronization when in pulse mode. Many watt-seconds were delivered during this time.

APEX RF (Advanced Photocathode Experiment) 9 th CWRF Workshop - ESRF, June 21-25, 2016 Thank you