TRIO-CINEMA 1 UCB, 2/08/2010 FSW & Operations Winter Summary Seyoung Yoon KHU EE Team.

Slides:



Advertisements
Similar presentations
Page 1 Aalborg University Communication system for the AAUSAT-II Communication System for the AAUSAT-II Kresten K. Sørensen Department.
Advertisements

Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
Yongho Kim Aug 2, : My Job TLM_ReceiverRS decoderGSEOS Nothing.. Interface - Serial line - TCP/IP connection with MPS Functions - CCSDS frame,
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
TRIO-CINEMA 1 UCB, 2/08/2010 STEIN Intro Davin Larson Space Sciences Laboratory University of California, Berkeley.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
KHU Ground Station Nayoung Yoon KHU, 2010/10/041TRIO-CINEMA.
CINEMA Mission Readiness Review
Page 1 of 35 Achieving Over-The-Horizon Requirements Using Low Earth Orbit Satellites (LEOS) Presented by Eric Saikin.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
CINEMA (CubeSat for Ions, Neutrals, Electrons & MAgnetic fields) Jerry Kim * David Glaser † Thomas Immel ‡ * Systems Engineer, †
Week 7 Status Updates. Statement of Work: To design and prototype an attitude control system (ACS) for a Cube-Sat. This ACS will align the Cube-Sat with.
Guidance, Navigation and Controls Subsystem Winter 1999 Semester Review.
TRIO-CINEMA 1 UCB, 2/08/2010 Cinema Stein Interface FPGA (CSI) [Part II] Karthik Lakshmanan CINEMA - EE Team Space Sciences Laboratory University of California,
TRIO-CINEMA Meeting at KHU 1 October 19-23, 2009 CINEMA Operations Manfred Bester.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
TRIO-CINEMA 1 KHU, 08/10/2010 TRIO-CINEMA Activity in Korea Jongho Seon 10 Aug 2010.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.
TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley.
CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
TRIO-CINEMA FSW- 1 SSL, 8/10/2010 Flight Software Seyoung Yoon and Sameet Ramakrishnan Space Sciences Laboratory Kyung Hee University University of California,
TRIO-CINEMA 1 KHU, 10/08/2010 Ground Support Software Yong-ho Kim 22 Feb 2011 School of Space Research Kyung Hee University.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Chris Pasma, SSL Mechanical.
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
TRIO-CINEMA 1 UCB, 2/08/2010 LVPS & Switching Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 Integration and Test Program Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 ClydeSpace Electronic Power System Yashraj Khaitan Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA C&DH- 1 KHU, 10/19/2009 Command & Data Handling System (C&DH) Peter Harvey David Curtis David McGrogan Space Sciences Laboratory University.
TRIO-CINEMA 1 UCB, 2/08/2010 ACS Dave Auslander, Dave Pankow, Han Chen, Yao-Ting Mao, UC Berkeley Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
OBC Shawn Thompson Demi Vis 1. OBC Outline Requirements Concept of Operations Subsystem Description Development Environment/Tools Theory of Operations.
Simulink Interface Layer (SIL)
Preliminary Platform Design for KuaFu-A
USNA Next Generation Ground Station
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
Command & Data Handling
I&T&C Organization Chart
Seyoung Yoon and Sameet Ramakrishnan
CINEMA System Engineering
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
GLAST Large Area Telescope:
Command & Data Handling
Flight Software – EPS Module
Telemetry system The telemetry, tracking, and command (TT&C) subsystem performs several routine functions abroad a spacecraft. The telemetry or "telemetering"
Instrument Interface FPGA
ACS UC Berkeley Space Sciences Laboratory
DSP Operation Management Center (DOMC)
JPL Autonomous Space Mission Simulation
HA1L High Altitude 1U Laboratory
Satellite On Board Computer Software
Launch and On-orbit Checkout
CubeSat vs. Science Instrument Complexity
Mark Suder
Integration & Test Instrument Operations Coordination
Main information on the «WORLD SPACE OBSERVATORY» project
<Your Team # > Your Team Name Here
Charles Sommer October 21st, 2019
Presentation transcript:

TRIO-CINEMA 1 UCB, 2/08/2010 FSW & Operations Winter Summary Seyoung Yoon KHU EE Team

TRIO-CINEMA 2 UCB, 2/08/2010 Page  2 Agenda Operations –Operation Scenario –Contact Sequence –Power Status –Mission Operation Center Flight Software –Execute Module –Command Module –Sun-sensor Module –SPI-to-UART converter using another dsPIC

TRIO-CINEMA 3 UCB, 2/08/2010 Page  3 Operation Mode HSKSTETXSTEMAGSTETXSTE HSKSTETXSTE TXSTE TXSTEMAGSTETXSTE CMDSTETXSTE TXSTE HSKSTETXSTEMAGSTETXSTE TXSTE TXSTE TXSTEMAGSTETXSTE TXSTE TXSTE Safe mode All instruments are not available. Science mode All instruments are available exce pt boom and antenna actuators an d torque coils. ACS mode STEIN instruments are not availa ble and MAGIC operation mode i s switched to ACS mode. Torque coils are available. Engineering mode All instruments are available. OBC, EPS, BATT, RX and Sun-sens ors are always turned on.

TRIO-CINEMA 4 UCB, 2/08/2010 Page  4 Operation Scenario Launch –Launched and separated from the launch vehicle Startup –Power-on, initializes the FSW, deploys the UHF antenna, waits for contact the ground station Stabilization –Contacts the ground station, deploys the boom, calibrates the MAGIC, ACS acquisition mode, ACS procession mode Science Operation –Download mode, Observation mode, ACS mode, Safe mode, Fault recovery Mission Termination

TRIO-CINEMA 5 UCB, 2/08/2010 Page  5 Operation Scenario 1.0 Launch Process 2.0 Startup Process 3.0 Stabilization Process

TRIO-CINEMA 6 UCB, 2/08/2010 Page  6 Operation Scenario 4.0 Science Operations

TRIO-CINEMA 7 UCB, 2/08/2010 Page  7 Contact Sequence Flow Sequence of contact with the Ground Station

TRIO-CINEMA 8 UCB, 2/08/2010 Page  8 Power Status(1/2) TimeOperational Processes C&DHTSEPSACSMAGICSTEIN *On Board Computer Instrument Interface Board *Helium100 UHF Receiver Emhiser S-band Transmitter *Clydespace 3U-EPS *Clydespace 3U-BATT *TASC Solar Array Low Voltage Power Supply *Sun-sensor Magnetic Torque Coils ACS mode Science A, A’, B mode Gradiometer mode STEIN detector & electronics High Voltage Power Supply Deflector Attenuator 1.0 Launch Process 1.1 Separation from launch vehicle √√√√√√ 1.2 Acquisition of orbit parameters √√√√√√ 2.0 Startup Process 2.1 Power on √√√√√√ 2.2 Initialization FSW √√√√√√ 2.3 Deploy the UHF antenna √√√√√√√√√ 3.0 Stabilization Process 3.1 Contact the ground station √√√√√√√√√√ 3.2 Deploy the mag boom √√√√√√√√√ 3.3 MAGIC calibration √√√√√√√√√√

TRIO-CINEMA 9 UCB, 2/08/2010 Page  9 Power Status(2/2) TimeOperational Processes C&DHTSEPSACSMAGICSTEIN *On Board Computer Instrument Interface Board *Helium100 UHF Receiver Emhiser S-band Transmitter *Clydespace 3U-EPS *Clydespace 3U-BATT *TASC Solar Array Low Voltage Power Supply *Sun-sensor Magnetic Torque Coils ACS mode Science A, A’, B mode Gradiometer mode STEIN detector & electronics High Voltage Power Supply Deflector Attenuator 3.4 ACS acquisition mode √√√√√√√√√√ 3.5 ACS procession mode √√√√√√√√√√ 4.0 Science Operation Process 4.1 Safe mode √√√√√√ 4.2 Observation mode √√√√√√√√√√√√√ 4.3 Download mode √√√√√√√√√√√√√√ 4.4 ACS mode √√√√√√√√√√ 4.5 Fault Recovery mode √√√√√√ 5.0 Mission Termination

TRIO-CINEMA 10 UCB, 2/08/2010 Page  10 Mission Operation Center We need more function or system to operate the mission automatically. Integrated Ground Support Software (IGSS) Attitude Simulator (Matlab/simulink) CINEMA Emulator GSEOS Mission Planning System Satellite Tracker (Orbitron?) Orbit Simulator (STK or Orbitron or hand-made?) Radio System CINEMA Radio Not determinedIn progress

TRIO-CINEMA 11 UCB, 2/08/2010 Page  11 Mission Operation Center Radio communication system –UHF/S-band antennae, transceivers, TNCs, RS decoder(TBD) Satellite Tracking System –Tracking software for antenna control (Orbitron in KHU), antenna rotator and controller. GSEOS - Communication software for command and telemetry Mission Planning System –Pass scheduling from the Orbitron or STK or hand-made –Observation planning –Generating the command for the spacecraft Simulator for attitude control (Matlab/Simulink) –It conducts the simulation for attitude control. –For verification, it executes the command with the CINEMA emulator. CINEMA emulator –It consists of the development board for OBC and simulator or EM for other instruments. Integrated Ground Support Software –It shall conduct interfacing between other ground software.

TRIO-CINEMA 12 UCB, 2/08/2010 Page  12 Flight Software EXEC Module –Initialize the functions of each FSW modules –Execute the command(now only immediately command) from CMD module –Organized the structure of function CMD Module (Sameet’s) –Added some code to parse the CDI packet from the Helium radio IDENTIFIERBinaryGSECommand Description MODE_SWITCH xxxxxxMMYesSwitch FSW Mode INIT_DLINK xxxxxxxxYesStart downlink STOP_DLINK xxxxxxxxYesStop downlink

TRIO-CINEMA 13 UCB, 2/08/2010 Page  13 Flight Software Sun-sensor Module –Modified for new sun-sensor circuit –Sun-sensor data is updated when the HSK task is called and when the ACS asks it. –Return the sun-vectors(x, y, z) and spin rate(rad/sec) –Have two problem that Earth’s Albedo and detecting the spin direction –Direction problem can be solved by getting the direction from the ACS SPI-to-UART Converter using another dsPIC –It’s available to check the data from dsPIC or IIB –Current model has fixed clock and data length –Should be updated to get more convenient interface

TRIO-CINEMA 14 UCB, 2/08/2010 Page  14 Future Works Integrate the FSW –Add the commands from the CTM.xls –Add the functions for early orbit Sun-sensor –Find the solution for two problems –Test with real hardware SPI-to-UART converter –Update to control the option such as clock speed and number of received bytes.

TRIO-CINEMA 15 UCB, 2/08/2010 Kyung Hee University / School of Space Research