Click to edit Master title style March 2016 California Coastal Commission (Items W11a, W11b, and W10f)

Slides:



Advertisements
Similar presentations
Syracuse City Council March 8, EIS Process & Schedule.
Advertisements

Keeping San Diego Moving SANDAG Capital Program Update
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 1 Riverside County - Orange County.
March 7, 2012 North Coast Corridor Program Overview Caltrans External Advisory Liaison April 16, 2013.
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level The Economy and Conservation Agendas:
1 GOODS MOVEMENT IN CALIFORNIA. 2 California is facing a significant transportation infrastructure shortfall. California is using innovative approaches.
NCTD/SANDAG Project Update Capital Improvement Program Bill Prey, P.E., LOSSAN Corridor Director San Diego Association of Governments RELATED TO AGENDA.
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
Overview ACEC July 16, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
California Integrated Waste Management Board 1 Permitting and Compliance Committee Agenda Item F (Board Item 5) September 8, 2009 Permitting and Compliance.
Station Development Update Melissa DuMond, Director of Planning and Integration April 29, 2015.
June 23, 2007 Alternatives Brainstorming Workshop Brisbane Baylands Specific Plan EIR.
May 12, 2007 Community Visioning Workshop Brisbane Baylands Specific Plan EIR.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Anaheim Regional Transportation Intermodal Center Project Update.
I n t e g r a t I n g C S S Practitioner Module 4 1 Module 4: CSS in Corridor and Sub-area Planning.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Land Use Study for the Community of Winchester July 9, 2012.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
Consistency Determination: City of Seaside Local Coastal Program FORA Board Meeting March 15, 2013 Agenda No: 8a.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Alachua County Mobility Plan Sidewalk Mitigation & Bicycle and Pedestrian Planning Efforts.
Comprehensive Plan Planning for the Future of East Bethel City Council / Planning and Zoning Commission Public Hearing – March 8, 2006.
1 Poseidon Resources (Channelside), LLC Carlsbad Desalination Project Marine Life Mitigation Plan (MLMP) Marine Life Mitigation Site Selection and Preliminary.
Northeast Corridor Greenway Acquisition Project – Design and Permitting Status Update City Council Workshop August 25, 2015.
Spearfish Community Strategic Planning Process Progress Report Monday, November 16, 2015.
GIS & Quantm 2005 Statewide GIS Conference March 10, 2005.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Item Th14a A2 City of Encinitas Opportunistic Beach Replenishment Program California Coastal Commission August 14, 2014 Meeting Presentation A2.
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
San Diego Regional Comprehensive Plan Presentation to Senate Transportation and Housing Committee February 8, 2005.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Encore Trust California Coastal Commission Hearing June 12, Encore Trust Residence.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
I-5 North Coast Corridor. I-5 North Coast Corridor FREQUENTLY ASKED QUESTIONS Are we “only” expanding the freeway? Why widen the freeway? Are we just.
CDP Application No Integral Communities 500 California Hwy 75, City of Imperial Beach CCC Hearing Item Th24b August 13, 2015.
Orht I-5 North Coast Corridor Project CA Transportation Planning Conference – New Directions in Planning Integrating Resource and Infrastructure Plans.
US Army Corps of Engineers BUILDING STRONG ® ENGINEERING WITH NATURE “ Beneficially Integrating Engineering and Natural Systems” PIANC 2012 Dredging Conference.
Federal Consistency Certification Sorrento To Miramar Double Track - Phase 1.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Biosimilar (Insulin) – Competitive Landscape and Market & Pipeline Analysis, 2016 DelveInsight’s, “Biosimilar (Insulin) – Competitive Landscape and Market. Request for sample of this research report:
The 710 Freeway Threatens Pasadena Presented To The Pasadena City Council August 13, /13/2012 Item 1 Submitted by John Shaffer.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
I TEM W11 A – PWP-6-NCC North San Diego County C ALIFORNIA C OASTAL C OMMISSION S AN D IEGO C OAST D ISTRICT S LIDE 1.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Geary Bus Rapid Transit Project Presentation to the San Francisco.
CONTEXT-SENSITIVE DESIGN 2002 Texas Department of Transportation Design Conference.
Item 4B Approve SPDC Matching Funds request from Southlake Carroll Lacrosse Association for amenities at North Park game fields.
1 Coastal Commission Staff Presentation Item W13A (City of Huntington Beach) Warner Avenue Bridge, Huntington Beach, Orange County.
Federal Consistency Certification Sorrento Valley Double Track.
History of Fifth Avenue Landing Hotel Project
Integrating Transit and Highway Solutions In High Volume Corridors
Carlsbad Policies, Strategies & Projects
cta cog ACEC American Council of Engineering Companies
Jeremy Area Transportation Plan
Using TIF to Support Primary Employers
Draft Transportation Element September 6, 2017
Transportation Alternatives (TA) Set-aside
Regional Projects Report 5-Year Integrated Plan Projects Status
Transportation Task Force Mission and Vision
Pacific Flyway Center Open Space Preserve and Interpretative Educational Facility Applicant: The Pacific Flyway Fund LLC.
Colorado Lagoon Ecosystem Restoration Project
Presentation transcript:

Click to edit Master title style March 2016 California Coastal Commission (Items W11a, W11b, and W10f)

2 $6 billion 40-year project – Four Express Lanes on I-5 – Double track LOSSAN corridor – Improve public and recreational coastal access – Coastal habitat enhancements Coastal Commission unanimous approval August 2014 Multi-modal, integrated solution to balance transportation needs and environmental commitments 27-mile corridor Major goods movement corridor

3 Improve public coastal access Enhance habitat Retain coastal character Holistic, integrated approach Balanced solution to ensure net benefit to coastal environment

4 -Complete Phase 1 Design -Continue Planning, Acquisition and Restoration of Habitat -Construction Integration

Minimize impacts to the environment and public Maximize opportunities for construction alternatives Common understanding of project elements to reduce construction risks 5 CMGCCMGC Flatiron- Skanska- Stacy and Witbeck Coastal Commission and Resource Agencies

6 Advanced Mitigation Progress Hallmark Site (east/west) – restoration progress 1 1

7 Advanced Mitigation Progress Batiquitos Bluffs – acquired 2 2

8 Advanced Mitigation Progress Strawberry fields – acquired Preserved Ag Space Preserved Open Space 3 3

Advanced Mitigation Progress Deer Canyon Site – restored 5 5 9

10 Advanced Mitigation Progress San Elijo Lagoon – Certified EIR (February 2016) 4 4

11 Rail Progress Oceanside Transit Center 1 1

12 Rail Progress Los Peñasquitos Lagoon Bridges Replacement Project 2 2

13 Rail Progress Sorrento Valley Double Track Project 3 3

14 Rail Progress Sorrento to Miramar Phase 1 4 4

Continue collaboration with Coastal Commission, coastal cities, and resource agencies Continue to identify and develop new integrated opportunities for future project phases Begin construction at San Elijo Lagoon fall

15

17 Existing Trails New Trails