13-Aug-07 1 Coordination Activities around calo Barrel faces 13-19 Aug 07) Meetings every Monday at 10:00 with team responsibles in UX15, 6th floor HO.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

IBL IST G&S Integration Ned Spencer, UCSC July 15, /15/11IBL IST G&S Integration1.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Design Office meeting Design office meeting.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
ID week - 26 September 2006 A. Ciocio1 SCT Services Installation SCT Cables Web page
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Pippa Wells25 October Procurement and manpower for service installation Services readiness dates Planning for type ii/iii Fibre installation dates.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Technical Support Activities in PH-ADO-PO
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
ATLAS and CERN/ST 2nd April 2003 Marzio Nessi. 02/04/2003 Today ATLAS project Detector Components Construction Detector Integration and Installation ATLAS.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
How 3D models and photos are organized in the database ADO-PO meetingTatiana KLIOUTCHNIKOVA.
Pending mechanics issues for electronics/services (updated 18/08/05 by Ana) Fixation/shielding for 2 LV PS (no fingers):  - Clermont worked out a proposal.
SCTSG - 17 October 2006 A. Ciocio1 SCT Services Installation Update Recent Full Report: September ID week SCT Cables Web page:
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
ATLAS closing scenario  Where we are  What is still be done before closing (ADO-PO support)  Closing scenario / Procedure / Schedule Prepared by Michel.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
31 January 2006A.Ciocio - SCTSG1 Type ii-iii and PP1 Production Timescale for installation Plan PP1and Testing.
Status of the DCS Richard Brenner (Uppsala University) " Structure of the DCS " Cabling of DCS sensors " Interlock " Status and near future plans.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
Status on closing operations End cap calorimeter side A Forthcoming operations ATLAS – April 17th, 2009 Prepared by Michel RAYMOND.
Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’
Status of the Remote HV Tile Upgrade session during the AUW Wednesday, 20 April 2016 François Vazeille on behalf of the Clermont-Ferrand team  Same set-up.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
Straw man layout for ATLAS ID for SLHC
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
ALICE 5 o’clock meeting Wk 51.
TS2 preparatory meeting
Technical Coordination Parallel Session November 2011, FNAL
Equipment simplified model SMR UR safety
LS1 planning meeting
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
LHC Experimental Vacuum Systems Status October ‘07
Technical Support Activities in EP-ADO-PO
ALICE 5 o’clock meeting Wk
n_TOF “Draft” plans for YETS and LS2
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Progress with Experimental Vacuum Chambers
Requirements of the support mechanics
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
LHCb & EYETS
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Initial BIS installation
Technical Support Activities in PH-ADO-PO
Installation plans from mid 2005
ATL-IC-ES new version available - approval starts
Polarized 3He target installation
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

13-Aug-07 1 Coordination Activities around calo Barrel faces Aug 07) Meetings every Monday at 10:00 with team responsibles in UX15, 6th floor HO side A Coordination: Oleg Fedin (163773) and Ana Henriques (163348) Responsibles for various systems activities: - Round scafolding infrusture support+movements: Michel Raymond (163432) Maarit White (164123) - ID Pixel : Eric Anderssen (164091) - ID SCT : Patrick Werneke (165410) - ID TRT : Hans Danielsson (163654) - ID Services : Sigi Wenig (163865) - Beam Pipe : Ray Veness (160753) - LAr : Luis Hervas (163805) - Tiles: Irene Vichou (162098)+Irakli Minashvili (160287) This document is updated every Monday: / / Calorimeters round scaffolding access and safety rules:

13-Aug-07 4 TeamResp. Telep. Tasks description#peopdurationStart time Identify the working zone*): 1) Scafolding +movements Michel Raymond Maarit White ) Beam pipe Ray Veness 2.1 survey and alignment of the beam pipe31 d TueAll 2.2 3) ID Pixel Eric Anderssen ) ID SCT Patrick Werneke Search for short with endoscope3MonSide C 4.2 Installation of PPF1's3Mon - ThuSide C all level 2 and Barrel FSI Ribbon splicing2Wed-SatSide C level Installation LMT cooling loops3Thu-FriSide C all level 2 and Coordination of activities around barrel calo faces (Oleg Fedin (163773)+Ana Henriques (163348) July+Aug 07 (~30min meetings every Monday at 10:00 with all team responsibles in UX15, 6 th floor HS structure side A) * ) A/C,sector#, radius (ID, LAr crates/fingers) ; platform # (side=A,C/position=R,L,M/level=1,2 example AL1)

13-Aug-07 3 TeamResp. Telep. Tasks description#peopdurationStart time Identify the working zone:*) 5) ID TRT Hans Danielsson Side C – cables repairing1 When possibleAll level 2, ) ID Services Sigi Wenig Sealing & close feed through by covers Side C&A1When possible 6.2 Modification of segment plates side C1When possibleSec1C, Sec9C 6.3 Preparation of ID end-plates parts1When possibleAll sectors 6.4 Installation of Heaters&pipes mock-up Side A22dSector 1, side A 7) Lar Luis Hervas No need to access LBC until end of July 7.2 Side A – reinstall of elec. BoardsAM1, AL ) TilesIrene Vichou Irakli Minashvili After 28 SD extraction to surface during last days reconnect services in fingers LBC: 1, 25, 13, 23, 03, 17, 26, 31, 61, 05, 04, 27, 33,02, 08, 09, 14, 15, 19, 21, 22, 24, 29, 30, 32, 34, 39, 59. ~30min Per finger When possible ~All sectors 8.2 Light Shielding the ITC of EBA32d~9amTiles Ext R 8.3 Check of few laser fibers at fingers12d~9amAll platforms Coordination of activities around barrel calo faces (Oleg Fedin (163773)+Ana Henriques (163348) July+Aug 07 (~30min meetings every Monday at 10:00 with all team responsibles in UX15, 6 th floor HS structure side A) * ) A/C,sector#, radius (ID, LAr crates/fingers) ; platform # (side=A,C/position=R,L,M/level=1,2 example AL1)

13-Aug-07 4 WPs around barrel calorimeter (UX15) are submitted by responsibles of teams to F.Butin (160342) For calorimeters: &p_top_type=P&p_open_id= &p_open_type=P For Inner Detector Request for scaffolding modification: 1.Friday 17-th 15:30, scaffolding modification side C for SCT FSI splicing. Put level 2 down ~1m. 2.Put platforms AL4 and AR4 3. In general no need for extra platform for the light shielding activities (confirm)

13-Aug-07 5 A Aug 07 AL4 AL3 AL2 AR4 AR3 AR2 AM3 AM4 AM1 AM2 Beam Pipe (4p) Tue From R. Veness Beam pipe survey&alignment ID Serv (1p) S.Wenig Sealing&Closing of all gaps USA US SCT (2p) Services testing ID Serv (2p) sector 1 S.Wenig Installation of mock-up for evaporative cooling system

13-Aug-07 6 C Aug 07 CL4 CL3 CL2 CR4 CR3 CR2 CM1 CM4 CM3 CM2 ID Serv (1) S.Wenig Segm. plates modification sec 1&9 US USA TRT (4p) All level 2&3 H Danielsson Cables repairing Beam Pipe (4p) Tue from R. Veness Beam pipe survey&alignment SCT (3p) Preparation for the services connection

13-Aug USAUS A August 07 A

13-Aug-07 C August 07 6 USAUS