1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.

Slides:



Advertisements
Similar presentations
GTK WG Meeting April 5 th 2011 Update on Microchannel Cooling - Paolo Petagna 1/15 PH-DT Update on Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
Advertisements

Novel technologies and materials for thermal management
DCP Meeting – September 12 th 2010 WP1/4: Leak Search & Repair- Paolo Petagna 1/9 PH-DT - WP1: REMOTE LEAK REPAIR- Update Report on status of leak analysis/quantification.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
P. Tropea for the PH-DT CO 2 team CO 2 CERN 11 March 2015 CO 2 cooling activities in PH-DT.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Acceptance criteria, Materials, Methods and Techniques for cooling plant construction DCP WP4 status 3 March 2010.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
M. Battistin – 28 th May 2010EN/CV/DC1 M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop - Back-up solutions to.
LHCb CO 2 cooling meeting Burkhard Schmidt – February 18,
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
M. Battistin – 9 th June 2010EN/CV/DC M. Battistin (EN/CV/DC) 9 th June 2010 Detector Cooling Project - WP III Advancement Status.
M. Battistin – 8 th April 2009 DC Project 1 M. Battistin 8 th April 2009 Detector Cooling Project - The present M&O Agreement.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
Magnet & services projects P. Tropea 9 Nov 2011 – CMS upgrade workshop.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Space, labs & testing equipment Paolo Petagna Meeting on CO 2 Cooling CERN 04 February 2015.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO Łukasz Zwaliński PH-DT-PO 1 J.Godlewski,
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
Cooling System Solutions
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Issues about the full scale thermosiphon (TSP ) D. Giugni Thermosiphon Review III, May 28 th 2010 D. GiugniThermosiphon Review III, May
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
PH-DT FLUIDIC SYSTEM 1 ST SECTION MEETING 19 NOVEMBER 2015.
DETECTOR COOLING PROJECT Preliminary Plan for WP#1 P. Petagna – June 17 th 2009.
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
3 June 09P. Tropea1 Cooling system acceptance Define a common set of acceptance criteria for cooling system commissioning Write the testing procedures.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
M. Battistin –17 th d June 2009 DC Project 1 M. Battistin 17 th June 2009 Detector Cooling Project - WP3 Advancement status.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 LHCb - Install Meeting 24/05/06 TS/CV/DC activities for LHCb: - IT, TT, OT & SPD/PS, RICH.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
Demineralised water cooling system
EN-CV activities for LHC during LS2
For the CMS Pixel detector
DT-LHCb coordination meeting 18 April 2016
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Gas system Commissioning procedures and status
Detector Cooling Project WP2 CO2 activities status report
Micro-channel Cooling
For the CMS Pixel detector
ATLAS Thermosiphon Readiness Review 17th March 2016
M. Battistin CERN EN/CV/DC 9th July 2009
Cooling Service and R&D activities
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
EN-CV: P8 systems and Detector Cooling
CO2 cooling requirements for the IBL
Status of CO2 Cooling tests at CERN for Pixel phase 1
CF testing pipe & testing plan
For the CMS Pixel detector
Presentation transcript:

1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009

2M. Battistin The background (1/2) The LHC Detector Cooling systems have been mainly realized at CERN. They use water or perfluorocarbons (C 3 F 8, C 4 F 10, C 6 F 14 ). The two exceptions are: LHCb Velo (Nikhef) – CO 2 ALICE Phos (Russian collaboration) – C 6 F 14 The CO 2 cooling solution is very promising for the upgrade phases of LHC. Both CMS and ATLAS Experiments are investing resources to develop the CO 2 concept of cooling.

9 th July 20093M. Battistin The background (2/2) The construction has been realized on the basis of sharp specifications and responsibility distribution. EN/CV/DC Cooling station Connection piping Distribution manifolds Distribution lines Heating equipment CERN/EN mandate CERN/EN mandate Experiment mandate Experiment mandate Detector EN/CV Cooling network Was that division of competence effective? Was there some lack of communication? Could we have done differently? During the construction phase CERN and the Detector communities have worked in parallel on the specification base

4M. Battistin Detector Cooling Project At the beginning 2009 has been defined a new project on Detector Cooling. The Cooling Coordinators of the four main LHC Experiments The representative of PH/DT group in charge of Detector Cooling The representative of EN/CV group in charge of Detector Cooling The representatives of PH and EN management Are defining the streamlines of the Detector Cooling activities at CERN. 9 th July 2009 PH/DTEN/CV CMS ALICEATLAS LHCb Detector Cooling Project

5M. Battistin DCP Mandate (…) Recommend consolidation paths which will improve the long term reliability of the present systems Define common R&D programs for the detector cooling system upgrades and periodically reviewing it Define a set of standard procedures for the acceptance of the cooling systems (leak tests, cleaning, pressure tests, commissioning, etc.); Define a common database of materials, components and techniques suitable for the future cooling systems 9 th July 2009

6M. Battistin WBS: the Work Package definition Four main Work Packages has been defined: 1.Detector Cooling loops leak repair on-site 2.CO2 cooling solutions 3.Consolidation of the ATLAS ID cooling unit plant 4.Acceptance Criteria for cooling systems, Material, Components Methods and techniques database 9 th July 2009

7M. Battistin WP§1 - On site leak repair Research dedicated to finding and curing leaks in situ. Such line of research will provide invaluable help in case of unexpected leaks at high luminosity when coolants will be activated. Phase1: Identification and classification of several known sources of leaks Phase2: Leak repair by means of in-situ methods. Phase3: cleaning of residual and long-term reliability tests. Paolo Petagna (PH/DT) leads this Work Package 9 th July 2009

8M. Battistin WP§2 - CO2 Cooling Solutions Construction and installation of CO2 cooling system at CERN for the qualification of the thermal management parameters (HTC, CHF, P/T, etc.) of the boiling channel and the stave prototype. Definition of the cooling plant specifications (Hans Postema CMS and Danilo Giugni ATLAS) Construction of CO2 cooling plant(s) (Paolo Petagna PH/DT) Measurements and thermodynamics correlations validation (Hans Postema CMS and Danilo Giugni ATLAS) CERN Cryolab is already a relevant partner of this project (Frederic Haug, TE/ECR) We are defining the contribution of Jan Godlewki for the general coordination of this work package 9 th July 2009

9M. Battistin WP§3 – Consolidation of the ATLAS ID cooling We doubt the long term reliability of the present compressor solution for the ATLAS ID cooling system. The cleanliness and leaks development could be improved. Alternative solutions shall be identified. Thermo-siphon (gravity driven fluid circulation) cooling system study. Perfluorocarbon blends are an option. Alternative compressions solutions: oil free screw compressors, oil free piston labyrinth compressors, membrane compressors, centrifugal compressors. Michele Battistin (EN/CV/DC) leads this work package. 9 th July 2009

10M. Battistin WP§4 – Acceptance Criteria and database… A basis of common and agreed construction and acceptance criteria shall be defined and widely used as a reference for the construction of the future on detector and off detector cooling system. Leak tightness Cleanliness Risk analysis Performance test quality plan A common database of Materials, equipments, components and techniques will be the reference for the construction of future on detector and off detector cooling system Paola Tropea (CMS) leads this work package. 9 th July 2009

11M. Battistin Conclusions Engineering and Physics Department are working in close collaboration to consolidate the present installations and study the future ones The Detector Cooling Project has defined the main streamlines of the R&D activities for the future generation of cooling systems CO2 is a very appealing option for both CMS and ATLAS detector Nikhef is the natural partner of DCP for CO2 cooling system study and support We want to define with you the agreement to work together and realize cooling systems to be used as bench test for stave heat transfer qualification I personally wish to all of us a very profitable working day in Nikhef 9 th July 2009