Time Meeting April 2, 2013 Agenda Safety Schedule Machine and system reports 04/02/2013Time Meeting, Run 131.

Slides:



Advertisements
Similar presentations
Programma DayDateProvisional plans SaturdayApril 14Journey to Cracow SundayApril 15Visit to Auschwitz MondayApril 16Akzo Nobel Coatings | University of.
Advertisements

Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
RHIC Run th Time Meeting Tuesday 8 May 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 05/08/2012 Time Meeting, Run 12.
Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
ODH Fans and Work Planning Protecting Against the Big Event 10 Questions Before Starting a Job at C-AD Photo of the Week Collider-Accelerator Department.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
Program DayDateProvisional plans SaturdayApril 14Journey to Cracow SundayApril 15Visit to Auschwitz MondayApril 16University of Cracow (Drug technology)
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
March 22, 2010 Went N017 Proton International 2010 Second informational meeting.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
 Safety  Schedule: Past, Present and Future  RHIC and Experiment Reports  Machine and System Reports  AOB.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Run th Time Meeting Tuesday 5 June 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 06/05/2012 Time Meeting, Run 12.
RCF Status One issues with the Mass Storage System (HPSS) –On 1/1 at 2:40 PM the core server process stopped working –Was automatically restarted by heartbeat.
Take 5 for Safety E. Lessard June 2, Conduct of Operations Agreement 2  An updated set of practices for mission success and safe operation of large.
RHIC Run 12 7 th Time Meeting 21 February 2012 WELCOME Safety SP's slide Experiments and Machine, status 1 02/21/2012 Time Meeting, Run 12.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
RCF Status - Introduction PHENIX and STAR Counting Houses are connected to RCF at a Network Bandwidth of 20 Gbits/sec each –Redundant (Bandwidth-wise and.
BLIP Operations – 162 days of operation o Safety o Forklift needs a new tire o Production o Sr-82 targets out of beam as of 14 Jun o New Sr-82 targets.
RCF Status Extended outage of the Mass Storage System (HPSS) last Wednesday –Latest transaction logs of namespace DB were erroneously deleted in the production.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration Time - 02 April 2013.
Restricted © Siemens AG 2014 All rights reserved.Answers for life. MD Buyline Fiscal Year 2014 Report.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Agenda Safety Schedule Machine and system reports 2/26/2016G. Robert-Demolaize, Time Meeting1.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Agenda Safety Schedule Machine and system reports 2/29/2016G. Robert-Demolaize, Time Meeting1.
4K Wave Cold in both rings PS gave us e-lens PS work during Day PP12 lattice test evening First Collisions Overnight Stores 109x109 Start Physics The Story.
 Safety  Schedule: Past, Present and Future  RHIC and Experiments Reports  Machine and Systems Reports  AOB.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Accelerator Support and Maintenance Startup for Run 13.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
Accelerator Support and Maintenance Startup13. Access LIPA work Friday LIPA taking feed for Booster MMPS down for emergency repair. LIPA taking feed for.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Take 5 for Safety E. Lessard January 19, Credited Controls  Credited controls: controls determined through safety analysis to be essential for.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
Time Meeting May 14, 2013 Agenda Safety Schedule Machine and system reports 05/14/2013Time Meeting, Run 131.
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Preinjectors Status D. Raparia March 22, 2016 Time Meeting.
Preinjectors Status D. Raparia April 26, 2016 Time Meeting.
Presentation transcript:

Time Meeting April 2, 2013 Agenda Safety Schedule Machine and system reports 04/02/2013Time Meeting, Run 131

Safety and training 04/02/2013Time Meeting, Run 132 Ed Lessard

Schedule 04/02/2013Time Meeting, Run 133 BLIP Run continues NSRL Run13A continues RHIC run Physics (beam development continues) April 2:AGS will be stopped at 18:00 for 24 hours to repair Simens MG. Long store at RHIC. April 3:Scheduled Maintenance (8:00-16:00) April 10:APEX (8:00 – 24:00) Continue to follow the preliminary schedule

Schedule 04/02/2013Time Meeting, Run 134 * 8-hour stores, Beam development between stores MondayApril 1 00: :00Run Physics* TuesdayApril 2 00: :00 Run Physics* 18:00 Start to repair Siemens MG (24 hours) WednesdayApril 3 00: :00 06: :00 18: :00 Run Physics* Maintenance Run Physics* Long store (18:00 – 06:00) Maintenance behind Siemens repair ThursdayApril 400: :00 Run Physics* A possible revert to the FY12 lattice (still under discussion) FridayApril 5 00: :00Run Physics* SaturdayApril 600: :00Run physics* SundayApril 700: :00Run Physics* MondayApril 800: :00Run Physics* TuesdayApril 900: :00 Run Physics * WednesdayApril 10 00: :00 08: :00 Run Physics * APEX

Machine and system reports RHIC pp Run13Vahid RanjbarRHIC pp Run13 STARPibero DjawothoSTAR PHENIXHubert van HeckePHENIX AGSHaixin HuangAGS APEXMei BaiAPEX MaintenancePaul SampsonMaintenance OperationsPeter IngrassiaOperations RCFMichaels ErnstRCF 04/02/2013Time Meeting, Run 135

Michael Ernst: RCF status with respect to PHENIX and STAR data taking: all storage and network-related services have been running stably and at the expected level of performance there were no service outages and/or performance degradations overall the level of data transfer activity is slightly higher compared to 1-2 weeks ago, but overall it’s ~50% below expectation 04/02/2013Time Meeting, Run 136

04/02/2013Time Meeting, Run 137 Next Time Meeting Next Time Meeting: Tuesday, April 9 1:30PM, Snyder