Long-Baseline Neutrino Facility LBNF Elaine McCluskey, LBNF Project Manager Fermilab PAC Meeting 23 June 2015.

Slides:



Advertisements
Similar presentations
DOE Neutrino Program Plans
Advertisements

Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
Towards a Future Long-Baseline Neutrino Experiment Bob Wilson Colorado State University CERN Prototype/Beam Test Meeting CERN, 20 October 2014.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Long-Baseline Neutrino Facility LBNF Summary of FSCF Final Design Parameters Meeting at SURF, 10 Aug 2015 Elaine McCluskey, LBNF Project Manager EFIG 19.
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
Recommendations for Science at SNOLAB Andrew Hime On behalf of the Experiment Advisory Committee Aug. 17, 2005 SNOLAB Surface Building.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Logistics Workshop Summary Mike Headley August 19, 2015.
LBNF status. Process to chose 2 SPs Candidates who accepted (vote starts the 27 th ) : Milind Diwan Chang Kee Jung Sanjib Mishra Andre Rubbia Jim Strait.
Cost and Engineering Working Group Introduction Jim Strait Fermilab LBNE Project Manager Deputy Chair, Cost and Engineering Working Group LBNE Reconfiguration.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Long-Baseline Neutrino Facility LBNF Integration - Interfaces, Config Mgmt and Requirements Jeffrey Dolph LBNF/DUNE DOE/SC CD-1 Refresh Review July 14-16,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Conventional Facilities for the Far Detector Options Assumptions and Cost Estimates T. Lundin April 25, 2012 LBNE Reconfiguration Workshop - 25, 26 - April-2012.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Project 29 September 2015.
News from LBNF C. J. Mossey, LBNF Project Director DUNE Collaboration Meeting - South Dakota School of Mines and Technology 19 May 2016.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
Fermilab View Nigel S. Lockyer DUNE Collaboration Meeting 9/3/2015.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Status N. S. Lockyer
Long-Baseline Neutrino Facility LBNF Far Site CF Scope Joshua Willhite Logistics Workshops August 11-13, 2015.
Robert J. WilsonRobert J. Wilson 13 February February 2013 HEPAP Facilities Sub-Panel Fermilab.
Long-Baseline Neutrino Facility LBNF Update: LBNF EVMS Implementation for CD-3a Elaine McCluskey, LBNF Project Manager Bob O’Sullivan, Project Controls.
K. Long, R. Roser, 23 July 2014 Report from the Neutrino Summit.
Long-Baseline Neutrino Facility LBNF LBNF Project C. J. Mossey, LBNF Project Director 49 th Annual Fermilab Users Meeting 16 June 2016.
LBNC report to the PAC David MacFarlane, LBNC Chair January 20, 2016.
LBNE Reconfiguration Engineering/Cost Working Group Report Jim Strait Fermilab LBNE Project Manager Deputy Chair, Cost and Engineering Working Group Fermilab.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
Long-Baseline Neutrino Facility LBNF LBNC: Far Site Update and Planning Mike Headley LBNF Far Site Facilities Project Manager January 11, 2016.
Strategic Planning Process Erik Gottschalk Fermilab Physics Advisory Committee Meeting – June 22-25, June 2015.
Long-Baseline Neutrino Facility LBNF Update on LBNF to Long-Baseline Neutrino Committee Elaine McCluskey, LBNF Project Manager 13 June 2016.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
Challenges to get LBNF ready for Far Detector installation ASAP Elaine McCluskey ELBNF Proto-Collaboration Meeting 22 Jan 2015.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
LBNF 1 LBNF/DUNE – Construction Summary. LBNF Far Site Facilities Scope and Requirements LNG Membrane cryostat is an European technology. CERN has now.
CERN Steve Kettell DUNE Collaboration Meeting January 12, 2016.
Executive Session Director’s Conceptual Design Review of Muon g-2 Project June 5-7, 2013 Jon Kotcher.
1 DOE Independent Project Review Critical Decision-3a Long-Baseline Neutrino Facility/ Deep Underground Neutrino Experiment (LBNF/DUNE) Project DOE Executive.
IEFIG update Joe Lykken | iEFIG Chair ELBNF IB phone meeting | 6 March 2015.
LBNE Project Scope, Cost, Schedule and International Involvement 1 Jim Strait, Fermilab LBNE Project Director P5 Meeting 3 November 2013.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Experimental Hall in Mountain Regions
Head, Office of Project Management Oversight (OPMO)
LBNF/DUNE Update Public Meeting Sanford Lab Update
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Overview of the Long-Baseline Neutrino Facility Cryogenic System
LBNF CAD models, Drawings and Component list
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
CERN Neutrino Project 26th November, 2013 M.Nessi.
News and brief overview of Beamline plans for the next few months
Experimental equipment Edgar L. Black February 17, 2019
X-Ray Endstations Update
Preliminary Project Execution Plan
Presentation transcript:

Long-Baseline Neutrino Facility LBNF Elaine McCluskey, LBNF Project Manager Fermilab PAC Meeting 23 June 2015

LBNF Outline 23 June 2015E McCluskey | Fermilab PAC Meeting2 LBNF scope at CD-1 Refresh The LBNF team Interfaces with DUNE LBNF/DUNE Project schedule LBNF/DUNE Reviews Near-term plan Summary and conclusions

LBNF The LBNF Project supports the DUNE Detectors 23 June 2015E McCluskey | Fermilab PAC Meeting3 conventional facilities at both the near and far sites cryogenics infrastructure to support the DUNE LAr-TPC detectors at SURF an intense neutrino beam aimed at the far site LBNF is a Fermilab-hosted project with international participation

LBNF 23 June 2015E McCluskey | Fermilab PAC Meeting4 Sanford Underground Research Facility: at the 4850L LBNF: Four cryostats in pits for 4-10kt detector modules, a central utility cavern with utilities & cryogenic equipment, access/egress drifts.

LBNF SURF – the Far Site 23 June 2015E McCluskey | Fermilab PAC Meeting5 Facility donated to the State of South Dakota for science in perpetuity Over $100M invested from private and state funds Experimental facilities at 4850 ft level Two vertical access shafts for safety Ross shaft refurbishment in process and is ~50% complete; working two 12 hour shifts/day in order to be done by 2017 Current underground physics program Large Underground Xenon (LUX) Future home of LZ Majorana Demonstrator Compact Accelerator System for Performing Astrophysical Research (CASPAR) Black Hills State Univ. Underground Campus – Low Background Assay and Measurement

LBNF Far Detector cavern configuration 23 June 2015E McCluskey | Fermilab PAC Meeting6 Cryostat 1 Cryostat 4 Cryostat 3 Cryostat 2 Central Utility Cavern Each Cryostat holds 17.1 kt LAr Central Utility Cavern holds cold boxes, LN2 dewars, booster compressors, LAr/GAr filters, electrical/mechanical utilities Two parallel caverns each have two 10 kt detector pits with a laydown space in between The CF utilities and cryogenics are in a separate parallel cavern, to alleviate conflicts with cryostat & detector install To Ross Shaft

LBNF Free-standing cryostat steel frame support 23 June 2015E McCluskey | Fermilab PAC Meeting7 Outer structure Stainless steel skin Vertical belts Horizontal belts Design is being developed to accommodate both single- and dual-phase detectors. Similar designs are being used by the Short-Baseline Neutrino program and for LAr-TPC prototypes at CERN. person Top cap & Detector supports Inner cryostat dimension: L = m W = m H = m

LBNF Membrane cryostat interior 23 June 2015E McCluskey | Fermilab PAC Meeting8

LBNF 23 June 2015E McCluskey | Fermilab PAC Meeting9 Fermilab – the Near Site North LBNF Project Area

LBNF 23 June 2015E McCluskey | Fermilab PAC Meeting10 Neutrino Beam at Fermilab & the Near Detector Facility N To South Dakota Embankment allows placement of the target close to grade to reduce risk of tritium production in the aquifer.

LBNF 23 June 2015E McCluskey | Fermilab PAC Meeting11 Is this useful? Near Site cross-section Beamline designed for initial 1.2 MW beam power with PIP-II, upgradable to 2.4 MW in the future. Near Detector Surface Building Near Detector Hall Target and Horns Decay Pipe Absorber

LBNF LBNF/DUNE Organization 23 June 2015E McCluskey | Fermilab PAC Meeting12 IAC: International Advisory Council RRB: Resources Review Boards LBNC: Long-Baseline Neutrino Committee EFIG: Experiment-Facility Interface Group Fermilab Directorate: The Fermilab Director and the 2 Deputy Directors Additional organization charts in follow- on presentations will provide further detail regarding organization & management. Is Mark showing this first?

LBNF LBNF Project Organization 23 June 2015E McCluskey | Fermilab PAC Meeting13 Fermilab is the host laboratory with responsibility to execute the LBNF Project. New L2 Projects for Far Site Facilities and Near Site Facilities will be led by heads of new Fermilab LBNF divisions – integrates SDSTA into Far Site leadership with Mike Headley as L2 Manager Ensures coordination and single point of contact at each site INCLUDES: SDSTA STAFF CERN &( OTHERS?) FUTURE PARTNERS Much of the project team worked on LBNE and has the background and experience for LBNF.

LBNF Requirements and interfaces 23 June 2015E McCluskey | Fermilab PAC Meeting14 LBNF manages requirements interfaces internally between  the beamline and Near Site conventional facilities  the cryostat/cryogenic systems and Far Site conventional facilities LBNF must coordinate requirements for and interfaces with DUNE regarding  Cryostats & cryogenic systems for the Far Detector  Conventional facilities for the Far and Near Detectors  Beamline technical components to meet physics requirements Extensive work has been done through meetings between L2 and L3 subproject to be ready for CD-1 Refresh The Experiment-Facility Interface Group (EFIG) has also provided a formal means to come to consensus in many areas recently.  Modular, 4-cavern/cryostat layout with central utility cavern  Larger target hall to allow for potentially optimized neutrino beam components  Elimination of longer/wider decay pipes

LBNF LBNF/ DUNE Schedule Summary Overview 23 June 2015E McCluskey | Fermilab PAC Meeting15 FY27 FY26FY25FY24FY23FY22FY21FY20FY19FY18FY17 FY16 CFFS Excavation and Caverns FY15 CFNS Preliminary & Final Design Cryostat and Cryogenics Construction Dec-19 CD-2/3c Project Baseline/ Construction Approval Jul-15 CD-1 Refresh Review Jan-16 CD-3a FD Detector Design and Prototyping FD Detector 1-4 Procurement assembly, installation, filling, commissioning Detector #1 Commissioned Near Detector & Beamline Design Near Detector Procurement and Assembly N.D. Hall & Install of Near Detector in Hall ND Commissioning Beamline Complete May-18 CD-3b CFFS Preliminary & Final Design Beamline Conventional Facilities and Component Installation Beamline Installation NSCF Installation Near Detector Installation NEAR SITE FAR SITE Needs to be checked for updated dates

LBNF Design Reviews 23 June 2015E McCluskey | Fermilab PAC Meeting16 All technical areas of the LBNF and DUNE Projects had conceptual design reviews in May. All indicated readiness for CD-1 Refresh, noting many areas were beyond conceptual design. Design review recommendations being addressed before DOE Independent Project Review (IPR). Not sure this one is needed

LBNF Recommendations from Director’s Review 23 June 2015E McCluskey | Fermilab PAC Meeting17 Review outcome was positive – ready for DOE CD-1R IPR. Final report publicly available. Final report 30 recommendations with 16 needing to be addressed and closed before the review. Status provided here:

LBNF 23 June 2015E McCluskey | Fermilab PAC Meeting18

LBNF 23 June 2015E McCluskey | Fermilab PAC Meeting19

LBNF Near Term Plan 23 June 2015E McCluskey | Fermilab PAC Meeting20 DOE CD-1 Refresh Independent Cost Review 7-8 July  Practicing for drill downs DOE CD-1 Refresh IPR  Applying information learned from Director’s review  Engaging with subcommittee chairs in next 2 weeks to ensure they have what they need Recruiting for key open positions in both LBNF and DUNE In preparation for CD-3a, planned for November:  Planning for Far Site logistics meeting in August with consultants, conventional facilities (CF), cryo, and far detector participants, led by Far Site Facilities Manager, to ensure  Planning for decision-making meeting with key leaders in Aug/Sep to set Far Site CF interfaces and determine final design requirements

LBNF Summary 23 June 2015E McCluskey | Fermilab PAC Meeting21 LBNF will provide the facility and the neutrino beamline for the DUNE detectors.  conventional facilities at both the near and far sites  cryogenics infrastructure to support the DUNE detectors at SURF  an intense neutrino beam aimed at the far site Conventional facilities designs are advancing quickly, based on requirements from the beamline, cryogenics and detectors Modular cryostats based on designs similar to the short-baseline program and prototypes at CERN will be installed as excavated detector pits are completed with detector installation similarly executed one module at a time. The beamline design is based on NuMI experience and well understood and is designed to accept up to 2.4 MW beam

LBNF Conclusions 23 June 2015E McCluskey | Fermilab PAC Meeting22 Together, LBNF and DUNE will provide a world-leading facility and experiment for neutrino physics, nucleon decay and astroparticle physics. Aggressive schedule is planned:  Excavation at SURF to start late in 2017  Construction of first cryostat in early 2020  First far detector installation in late 2021, ready for filling in 2023  2 nd, 3 rd and 4 th detectors in following ~ 2 years  1.2 MW beam by 2026  Precision near detector by 2027 Significant progress has been made in the last 5 months and we are well positioned for CD-1 Refresh and know what is needed to do for CD-3a.