Project Management. Projects „Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame.”
CHAPTER 17 Project Management.
pert and cpm ch 9 Learning objectives:
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
WEEK 15A – PROJECT MANAGEMENT (CHAPTER 3) Characteristics, tools, Pert/CPM, critical path, slack calculation, crashing SJSU Bus David Bentley1.
18-1Project Management Chapter 18 Project Management.
Chapter 9 Project Management.
planning, preparing, and coordinating efforts to a accomplish a specific set of objectives Lesson 01 Project Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Operations Management
1 Project Management Inventory Management – In-class Example  Number 2 pencils at the campus book-store are sold at a fairly steady rate of 60 per week.
Operations and Supply Chain Management, 8th Edition
PROJECT MANAGEMENT PART SIX Chapter Eighteen Project Management.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Lecture 4 Project Management Chapter 17.
Roberta Russell & Bernard W. Taylor, III
Project Management Chapter 3 BUSI 2106 – Operations Management.
Chapter 13: Quantitatve Methods in Health Care Management Yasar A. Ozcan 1 Chapter 13. Project Management Time in Weeks Activities
Project Management Chapter 17.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Project Management. Projects „Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame.”
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Project Management OPIM 310.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management. Learning Objectives  Discuss the behavioral aspects of projects in terms of project personnel and the project manager.  Discuss.
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Operations Management
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
© Stevenson, McGraw Hill, Assoc. Prof. Sami Fethi, EMU, All Right Reserved. Project management; Chapter7 MGMT 405, POM, 2010/11. Lec Notes Chapter.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
© Stevenson, McGraw Hill, Assoc. Prof. Sami Fethi, EMU, All Right Reserved. Project management; Chapter 5 MGMT 405, POM, 2012/13. Lec Notes Chapter.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
Project Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
CHAPTER EIGHTEEN Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Chapter 4 MIS Project Management Lecturer Sihem Smida Sihem Smida Developing a project plan.
18-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16 – Project Management
Chapter 5: Project Management
Project Management.
PROJECT MANAGEMENT.
Project Management (專案管理)
Chapter 17 Project Management McGraw-Hill/Irwin
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Hospital Establishment
PART SIX PROJECT MANAGEMENT Chapter Eighteen Project Management.
Project Planning & Scheduling
17 Project Management.
Chapter 5: Project Management
17 Project Management.
Project Planning and Budgeting
Stevenson 17 Project Management.
Project Management Chapter 17
Chapter 16 – Project Management
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
Presentation transcript:

17 Project Management Homework; 1b, 4b, 5b, Sup1, Sup2

17-2 Sup1 Homework Problem For the project depicted below: a.How long is the project expected to take? b.What is the probability that the project will complete within 14 weeks? c.Determine the critical path and slack for all activities.

17-3 Sup2 Homework Problem For the project depicted below: a.Draw the AON diagram. What is the expected completion time? b.What is the probability of completing the project within 21 days? c.What is the probability of completing the project within 17 days? d.What is the probability the project will take more than 17 days?

17-4 Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Projects An interrelated set of activities that has a defined starting and ending points and that results in unique outcomes. Involves resources and allocation of resources.

17-5 Project Management  What are the Key Metrics  Time  Cost  Performance objectives  What are the Key Success Factors?  Top-down commitment  Having a capable project manager  Having time to plan  Careful tracking and control  Good communications

17-6 Project Management  What are the Major Administrative Issues?  Executive responsibilities  Project selection  Project manager selection  Organizational structure  Organizational alternatives  Manage within functional unit  Assign a coordinator  Use a matrix organization with a project leader

17-7 Project Management  What are the tools?  Work breakdown structure  Network diagram  Gantt charts  Risk management

17-8 Planning and Scheduling MARAPRMAYJUNJULAUGSEPOCTNOVDEC Locate new facilities Interview staff Hire and train staff Select and order furniture Remodel and install phones Move in/startup Gantt Chart

17-9  Deciding which projects to implement  Selecting a project manager  Selecting a project team  Planning and designing the project  Managing and controlling project resources  Deciding if and when a project should be terminated Key Decisions

17-10 Project Manager Responsible for: WorkQuality Human ResourcesTime CommunicationsCosts

17-11 Project Life Cycle Definition and organization PlanningExecutionClose out StartFinish Resource requirements Time

17-12 Work Breakdown Structure Project X Level 1 Level 2 Level 3 Level 4 Figure 17.2

17-13 The Network Diagram  Network (precedence) diagram – diagram of project activities that shows sequential relationships by the use of arrows and nodes.  Activity-on-arrow (AOA) – a network diagram convention in which arrows designate activities.  Activity-on-node (AON) – a network diagram convention in which nodes designate activities.  Activities – steps in the project that consume resources and/or time.  Events – the starting and finishing of activities, designated by nodes in the AOA convention.

17-14 The Network Diagram (cont’d)  Path  Sequence of activities that leads from the starting node to the finishing node  Critical path  The longest path; determines expected project duration  Critical activities  Activities on the critical path  Slack  Allowable slippage for path; the difference the length of path and the length of critical path

17-15 Time Estimates  Deterministic  Time estimates that are fairly certain  Probabilistic  Estimates of times that allow for variation

17-16 Probabilistic Time Estimates  Optimistic time  Time required under optimal conditions  Pessimistic time  Time required under worst conditions  Most likely time  Most probable length of time that will be required

17-17 Expected Time tete = t o + 4t m +t p 6 t e = expected time t o = optimistic time t m = most likely time t p = pessimistic time

17-18 Variance    (t p – t o ) 2 36    = variance t o = optimistic time t p = pessimistic time

17-19 Path Probabilities Z = Specified time – Path mean Path standard deviation Z indicates how many standard deviations of the path distribution the specified tine is beyond the expected path duration.

17-20  Computer aided design (CAD)  Groupware (Lotus Notes)  CA Super Project  Harvard Total Manager  MS Project  Sure Track Project Manager  Time Line Project Management Software

17-21  Imposes a methodology  Provides logical planning structure  Enhances team communication  Flag constraint violations  Automatic report formats  Multiple levels of reports  Enables what-if scenarios  Generates various chart types Advantages of PM Software

17-22 Determine all paths and their estimated times Determine the critical path Determine ES and EF times (forward pass) Determine LS and LF times (backward pass) Late Finish (LF) The latest start time of the activity immediately following it The earliest of the following activities LS times Developing the schedule

17-23 Probabilistic AON Example For the project depicted below: a.How long is the project expected to take? b.What is the probability that the project will complete within 23 weeks? c.Determine the critical path and slack for all activities.

17-24 Finish Start A D E G C F B Example