Off & On Shore Electronics overview KM3Net APC Paris 05 / 09 / 2012 Frédéric LOUIS.

Slides:



Advertisements
Similar presentations
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
Advertisements

Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
Fabrication & Assembly of Opto-Rx12 Modules for CMS- Preshower S. K. Lalwani Electronics Division Bhabha Atomic Research Centre Mumbai –
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
Martino Ruppi – KM3NeT 16 – 18 April Pylos Clock distribution and absolute time calibration in NEMO phase 1 Martino Ruppi INFN di Bari.
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
Stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The NEMO DAQ electronics: Actual characteristics and new features.
Group Electronique Csnsm AGATA SLOW CONTROL MEETING 19th fev AGATA PROJECT PREPROCESSING MEZZANINE SLOW CONTROL GUI FOR THE SEGMENT AND THE CORE.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Research of long distance clock distribution system Université Libre de Bruxelles (IIHE) Yifan Yang, Kael Hanson, Aongus Ó Murchadha, Thomas Meures, Michael.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
CKM Data Source System CKM Electronics Group July 2003.
September 11-12, 2013KM3NeT, CLBv2 Workshop Valencia Peter Jansweijer Nikhef Amsterdam Electronics- Technology Shore station brainstorm 1.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
REDNet - Status overview Rok Stefanic Ziga Kroflic
DCS for TRD Pre-trigger Ken Oyama Jan. 22, 2007 DCS Workshop in Heidelberg.
BPM stripline acquisition in CLEX Sébastien Vilalte.
January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Receiving 91 PB this week: A little bit more of work load! (We will be for a while production guys :) Test bench separated in two parts: 1.- The PB will.
NIKHEF 2014 David Calvo IFIC (CSIC – Universidad de Valencia) Time to Digital Converters for KM3NeT Data Readout System.
S.Anvar, V.Gautard, H.Le Provost, F.Louis, K.Menager, Y.Moudden, B.Vallage, E.Zonca, on behalf of the KM3NeT consortium 1 IRFU/SEDI-CEA Saclay F
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
29 Oct, 2014 IFIC (CSIC – Universidad de Valencia) CLB: Current status and development.
KM3NeT Offshore Readout System On Chip A highly integrated system using FPGA COTS S. Anvar, H. Le Provost, F. Louis, B.Vallage – CEA Saclay IRFU – Amsterdam/NIKHEF,
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Peter Jansweijer Nikhef Amsterdam Electronics- Technology November 21, 2012KM3NeT, CLBv2 Meeting via EVO KM3NeT CLBv2 1.
System On Chip Offshore Node S. Anvar, H. Le Provost, Y.Moudden, F. Louis, B.Vallage, E.Zonca – CEA Saclay IRFU – Amsterdam/NIKHEF, 2010 July 5.
CLB meeting APC Tentative action/work list.
DOM Electronics (Digital Optical Module) 1 WPFLElectronics PPMDOM ElectronicsF. Louis.
Firmware and Software for the PPM DU S. Anvar, H. Le Provost, Y.Moudden, F. Louis, E.Zonca – CEA Saclay IRFU – Amsterdam/NIKHEF, 2011 March 30.
Marseille 29 January 2013 Diego Real IFIC (CSIC – Universidad de Valencia) Instrumentation for Optical Calibration: Laser Beacon and Nanobeacon.
Peter Jansweijer Nikhef Amsterdam Electronics- Technology September 19, 2012KM3NeT, CLB/DAQ Videocon KM3NeT CLBv2 1.
July 31, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
October 29, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
CLB demonstration board & prototype tests (CLB: Central Logic Board) 1 WPFLElectronics PPMCLB F. Louis.
CLB/DAQ meeting, Paris APC, 05 September DAQ in infrastructure and DU foot P. Lamare (CPPM)
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
Control Software Features  Modularity and flexibility to ensure the long-term viability and scalability of the MUST-SIM Control System  System setup.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
P. Jansweijer Nikhef Amsterdam Electronics- Technology Amsterdam July 5-6, 2010KM3NeT: General WPF/L meeting 1 Measuring time offset over a bidirectional.
A DWDM link for Real-Time data acquisition systems
White Rabbit and KM3NeT Peter Jansweijer, on behalf of KM3NeT
of the Upgraded LHCb Readout System
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
DAQ read out system Status Report
Diego Real, IFIC Spain, KM3NeT Electronics Coordinator
The Jülich Digital Readout System for PANDA Developments
“FPGA shore station demonstrator for KM3NeT”
Concluding remarks E. Migneco
White Rabbit in KM3NeT Mieke Bouwhuis NIKHEF 9th White Rabbit Workshop
The Data Handling Hybrid
STANDARD WR STRAW-MAN ARCHITECTURES FOR PHASE II & WRS RELIABILITY
Sub-nanosecond Time Synchronization Mechanism for Radio Interferometer Array
Els de Wolf 20 February 2012, Catania
Kostas Manolopoulos Tasos Belias
TDR of PMT: Timing issues
CALICE/EUDET Electronics in 2007
Commodity Flash ADC-FPGA Based Electronics for an
Characteristics of Reconfigurable Hardware
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Measuring propagation delay over a coded serial communication channel using FPGAs P.P.M. Jansweijer, H.Z. Peek October 15, 2009 VLVnT-09 Athens.
Data Communication Real-Time Semi Real-Time Store and forward
The Performance and Scalability of the back-end DAQ sub-system
TPC Electronics Meeting, 13/01/05 Carmen González Gutiérrez
Presentation transcript:

Off & On Shore Electronics overview KM3Net APC Paris 05 / 09 / 2012 Frédéric LOUIS

Digital Optical Module Considered like a PC KM3Net APC Paris 05/09/2012 Frédéric LOUIS

On Shore Station Off Shore Nodes Optical Network Data communication model KM3Net APC Paris 05/09/2012 Frédéric LOUIS

Reference Clock Optical Network Synchronous commands Clock & Command distribution Known latency KM3Net APC Paris 05/09/2012 Frédéric LOUIS

Phase measurement Optical Network Electrical Calibration system & Time KM3Net APC Paris 05/09/2012 Frédéric LOUIS

Time measurement Optical Network Opical Calibration system KM3Net APC Paris 05/09/2012 Frédéric LOUIS

Off Shore DOM electronics KM3Net APC Paris 05/09/2012 Frédéric LOUIS

Off Shore DOM electronics description KM3Net APC Paris 05/09/2012 Frédéric LOUIS

Off Shore CLB FPGA description KM3Net APC Paris 05/09/2012 Frédéric LOUIS

Off Shore CLB electronic Firmware & Software KM3Net APC Paris 05/09/2012 Frédéric LOUIS

Off Shore CLB instrumentation KM3Net APC Paris 05/09/2012 Frédéric LOUIS

Off Shore CLB interfaces KM3Net APC Paris 05/09/2012 Frédéric LOUIS

On Shore Electronics KM3Net APC Paris 05/09/2012 Frédéric LOUIS

PC On Shore 1 PC On Shore 2 Data Readout flow DOM Off Shore On Shore PPM DOM On Shore PPM DOM Data flow KM3Net APC Paris 05/09/2012 Frédéric LOUIS

On Shore PPM DOM KM3Net APC Paris 05/09/2012 Frédéric LOUIS

On Shore PPM DOM description KM3Net APC Paris 05/09/2012 Frédéric LOUIS

On Shore PPM DOM Shore station crate KM3Net APC Paris 05/09/2012 Frédéric LOUIS

On Shore PPM DOM Shore station crate description KM3Net APC Paris 05/09/2012 Frédéric LOUIS

External measurement Start/Stop Clk & Cmd Insertion Clk & Cmd Control GTX ML507 SPI Link Clk & Cmd Extraction GPS Master Clock Phase & Time measurement Measurement Control Time system (Counter, etc….) GPS Tag 1 pps ML 605 On Shore PPM DOM Configuration Off Shore Side On Shore Side KM3Net APC Paris 05/09/2012 Frédéric LOUIS

On Shore PPM DOM firmware & software description KM3Net APC Paris 05/09/2012 Frédéric LOUIS

Off Shore PPM DOM Software architecture KM3Net APC Paris 05/09/2012 Frédéric LOUIS

PPC Boot across Optical Network Load software & LMK configuration GPS data for each ’’Start Run’’ KM3Net APC Paris 05/09/2012 Frédéric LOUIS

On Shore PPM DOM Ice grid Gui & Configuration editor KM3Net APC Paris 05/09/2012 Frédéric LOUIS

On Shore PPM DOM Kdaq Run Control KM3Net APC Paris 05/09/2012 Frédéric LOUIS

On Shore PPM DOM Data readout and root analysis KM3Net APC Paris 05/09/2012 Frédéric LOUIS

PPM DOM PPM DU Off shoreCLB/FPGA CLB/FPGA On ShoreOne Channel Three channels Broadcast Clock & Cmd system system TDC & Fine TDC Optical Calibration Calibration PPM DOM / PPM DU KM3Net APC Paris 05/09/2012 Frédéric LOUIS

PPM documentation KM3Net APC Paris 05/09/2012 Frédéric LOUIS

Extract from Catania slides

PPM DOM Shore Station Crate Saclay will be able to assembly (with your evaluation boards) few crates (procedure and price not yet fixed by IRFU) If you are interested, let me know.

Thank you for your attention KM3Net APC Paris 05/09/2012 Frédéric LOUIS