2008-09-10E. Hazen1 HCAL DAQ To Do List Here come the protons! But still lots to do... DQM Tweaks HO Trigger Links New DCC Selective readout.

Slides:



Advertisements
Similar presentations
GCT Software Jim Brooke GCT ESR, 7 th November 2006.
Advertisements

José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
TDPS Wireless v Enhancements E1 - Multi load E2 - Driver time scheduler.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Eunil Won Harvard University April 11, 2003 for ZPD FDR 1 ZPD Prototype Tests and DAQ Implementation Introduction Prototype Tests - Electrical Signals.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
RPC Readiness for Data-taking RPC Collaboration 1.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Plans for Trigger Software Validation During Running Trigger Data Quality Assurance Workshop May 6, 2008 Ricardo Gonçalo, David Strom.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
26 Jan 2010Paul Dauncey1 DESY beam test preparations Paul Dauncey.
Recent Software Issues L3 Review of SM Software, 28 Oct Recent Software Issues Occasional runs had large numbers of single-event files. INIT message.
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
U.S. ATLAS Executive Committee August 3, 2005 U.S. ATLAS TDAQ FY06 M&O Planning A.J. Lankford UC Irvine.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
Monday December DESY1 GDCC news Franck GASTALDI.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013 David Cussans, AIDA WP9.3, DESY 1.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
19 Apr 2007DAQ Readiness1 Paul Dauncey. 19 Apr 2007DAQ Readiness2 DAQ hardware layout ? More CRCs New HCAL stage May not be used.
E. Hazen - Detector Systems1 HCAL Initialization Cooling it Down!
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University.
9/29/2016E. Hazen - oSLB1 HO Trigger Links ● oSLB produced (69 pieces) – First few tested (by me) -- seem OK – Production testing to be done by student.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
E. Hazen1 New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister, Phil Lawson, Jason St John, Shouxiang Wu Boston University.
Online Software Status ● Overview ● Recent Changes ● Required Changes ● Desirable Changes ● Upgrade ● Summary Murrough Landon 1 July 2009.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
E. Hazen1 New DCC Status and Software issues Eric Hazen, Phil Lawson, Shouxiang Wu, Jim Rohlf, Arno Heister, Jason StJohn Boston University.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
What is Epson Error Code 0xf4 Epson Printer Support Canada.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Some first observations
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
HCAL DAQ Path Upgrades Current DCC Status New DCC Hardware Software
HCAL Database Goals for 2009
CLAS12 DAQ & Trigger Status
U.S. ATLAS TDAQ FY06 M&O Planning
LKr status R. Fantechi.
EMCal Cosmics Run Cosmics Run Goals
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Test Stand Status and Plans
DAQ for ATLAS SCT macro-assembly
Controlling a large CPU farm using industrial tools
HERD Prototype Beam Test
EUDAQ Status Report Emlyn Corrin, 29 September 2010
HCAL Data Concentrator Production Status
Online Software Status
Common components for OPC-UA developments at CERN: An enhanced OPC-UA toolkit Ben Farnham.
Online Software Status
HCAL DAQ (hardware) Debugging Status
AMC13XG (XG = Ten Gigabit)
Online Software “To Do” List
New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister,
DQM for the RPC subdetector
LHCb Online Meeting November 15th, 2000
Plans for the 2004 CSC Beam Test
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

E. Hazen1 HCAL DAQ To Do List Here come the protons! But still lots to do... DQM Tweaks HO Trigger Links New DCC Selective readout

E. Hazen2 DQM - Jason Improve reliability of automatic offline DQM for global runs Need some back-up for DBS, which is unreliable Make it easier to find DQM plots (one place to look!) Improve data integrity plots (ala EricDIM) Change error counts to log scale by default Fix bugs in exisiting data integrity plots

E. Hazen3 HO Trigger Links Status: oSLB installed, fibers pulled Link tests done on prototypes(last year!) To be done: Work at CERN: Connect fibers on both ends Link test (with RPC group) Test / commission automatic synchronization procedure Remote work: Define correct mapping, add to firmware Software Flash memory programming Map setting Add support for BX histogramming Enhance expert view

E. Hazen4 New DCC Project Make discreet inquiry about project approvalJim / Larry Software Specification Eric Coding Arno/Phil/Eric Hardware Order critical parts ASAP Finish PCB layout, review Order prototypes (how many?) Assemble, test Firmware Wu First version duplicates current DCC as possible