National Organization of Minority Engineers Metropolitan Water Reclamation District of Greater Chicago June 30, 2016.

Slides:



Advertisements
Similar presentations
Capital Improvement Program (CIP) Overview Dean Fisher, P.E., PMP, CCM July 25, 2013.
Advertisements

11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Presented by: Ronald O. Nichols LADWP General Manager
Facilities Management Utilities & Engineering Services Duke CHWP-2 RECLAIM WATER DU-107-PP.
DC Water Town Hall Meeting Series 2013 General Manager George S. Hawkins.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 17, 2012 DC WATER Hosted by: DBIA-MAR Monthly Luncheon Water Wastewater.
City of Berea North End Area Sewer Investigation Project- Phase I Commencing Fall 2011.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
2013 Stormwater Workshop June 13, 2013 Sponsored By Michiana Stormwater Partnership John J. Dillon Director, LTCP Management City of South Bend.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
STORMWATER MANAGEMENT PROGRAM UPDATE July 23, 2014.
Wastewater Treatment & Collection System Improvements.
The City of North Bend Sanitary Sewer System
1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Leadership Summit Cheiko High, Deputy Commissioner, CDOT.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Facilities Maintenance Department LtCol Todd A. Kerzie Facilities Maintenance Officer (760) 725 – 3807 Mr. Jeff Hunt Maintenance Control Director Marine.
Special Order by Consent Wastewater Collection Improvement Projects Mark Fisher and Dennis Asbury Final Report to City of Eden October 20, 2009.
Matt Schueler Civil Project Management & Programs
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
What does PWD do for our City?. Administrative Services Engineering Operations.
We provide and maintain all utilities such as Electricity, Water, Waste Water, Heating and Cooling Services, Refuse Collection, and the Garrison Recycling.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
TCC Budget Highlights Capital Budget - $190.43M Operating Budget - $384.9M Total Budget – $575.33M.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
Broomfield Comprehensive Plan 2016 Update Utility Work Group Report Utility Work Group: − Bob Pearson, Coordinator − Beth Willman, Recorder − Hal Lunka.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
P UBLIC W ORKS D EPARTMENT Total Proposed Budget $52,121,714 Funded Full Time Equivalent Positions (FTEs) = 238 Budget page Budgets shown in Millions.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
AES HUNTINGTON BEACH ENERGY PROJECT
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
ACEC Presentation September 22, 2016
Sewerage & Water Board of New Orleans
Stormwater Management
Knoxville Utilities Board June 21, 2016
Presented by Tom Heinemann, CH2MHILL October 2, 2013
Town of Brighton, Department of Public Works
Public Works/Municipal Utilities Department
Environmental Services
UMCP Learning Objectives
MSD’s Second Annual “Can You Dig It?”
PROFESSIONAL GENERAL ENGINEERING SERVICES FOR TOWN OF SURFSIDE
Presented by: Sandra Easter
ACEC Presentation September 22, 2016
Construction Management & Inspection
Town of Dunn Sanitary District No. 3
City of Valdosta Utilities Department.
FEE INCREASES Public Work Shop June 2, 2018.
Available Funding Resources
Effects of Disasters on Wastewater Treatment and Collection Systems
Design and Engineering Services
The Project Overview and Status Report
Sacramento Environmental Commission January 2019.
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

National Organization of Minority Engineers Metropolitan Water Reclamation District of Greater Chicago June 30, 2016

Overview 1.Contracts with the M & O Department 2. Contracts with the Engineering Department

Contracts with the M&O Department Consultant Contracts Construction Contracts Parts and Services Chemicals Utilities

Farmland Management Environmental Assessments –Phase 1, Phase 2 Energy Management Consultant Contracts with M&O

Landscape Maintenance Small Streams Maintenance Heavy Equipment Repair Trucking Sewer Cleaning Manhole repairs Construction/Maintenance Contracts with M&O

Collection Systems Repair Building Restoration Painting Pavement Repairs Street Sweeping, Snow Removal Janitorial Services

M&O Contracts 2016 AWARDED Truck Hauling (Biosolids) ~ $ 6.6 million (2 contracts) Scum Line Replacement ~ $ 310,000 Labor ~ $12.6 million Sewer Manhole Repair ~ $ 875,000 Building Restoration OWRP ~ $ 485,000 Rehab Digester Gas Turbine~ $ 2 million TO BE AWARDED Stream Cleaning ~ $ 3.1 million Pavement Rehab~ $ 1.4 million Tree Farm Establishment ~ $ 2.5 million

Consulting Contracts Design Evaluation Post-construction work Construction Contracts 22 expected for 2016 award (9 Construction, 13 Stormwater) 14 projects under development Contracts with the Engineering Department

CONSULTANT WORK W/ ENGINEERING DEPT. –Average Approximately 25,000 Consultant Man-Days Per Year –Quality Based Selection Process –PCE Goals –Large Variety of Work –Diverse Variety of Firms

QUALITY BASED SELECTION PROCESS Database Selection for Long Lists -- Primes Only Keep Informed of Upcoming Awards Minimal Cost/Impact to Firms and District –Long List RFQ –Standard Documents and Presentations –Short List RFP –Selection and Price/Scope Negotiations Schedule Meetings to Discuss Current Status of Program

PCE GOALS 20 / 10 / 10 …. (Minority / Women / Small) Involvement in the Core Elements of the Work –Discourage Use of Copying, Drafting and Other Peripheral Services –Aim to Develop Firms Capable of Doing Work as Primes Encourage PCE Firms to Prime on Smaller Single Discipline Projects

VARIETY OF WORK All Disciplines ( Electrical, Mechanical, Civil, Structural, Architectural, Process) Typical Repetitive Smaller Agreements –Bridge Inspections –Cost Estimating –Materials Inspections –Geotech –Investigations –Concrete Testing and Inspections

VARIETY OF WORK (CONTINUED) Typical Larger Prime Projects –Pump Station Design –Master Underground Piping Plans –Short Circuit Studies –Distributed Control Systems Design –Plant Expansions/ Process Efficiency –Digester Gas Utilization Design –Odor Control Design

CONSTRUCTION CONTRACTS (2016 Award) Organic Waste Receiving and Processing Facility CWRP Safety Railing around Tanks, SWRP Safety Railing around Tanks, OWRP Safety Railing around Tanks, CWRP Conversion of Old GCTs to the WASSTRIP Process, SWRP Digester Gas Utilization Facilities, CWRP Drop Shaft 5 Inspection and Rehabilitation, NSA Aeration Tanks Air Valves Automation in Batteries A, B, C and D, SWRP Conversion of Tanks to Fermenters, SWRP

CONSTRUCTION CONTRACTS (Under Development) Upper Des Plaines Intercepting Sewer 11D, Ext. C Rehabilitation, NSA Odor Control Facilities, CWRP 39th Street Conduit Rehabilitation - Phase II, SSA Upper Des Plaines Intercepting Sewer 11D Rehabilitation, NSA Phosphorus Recovery System, CWRP Upper Des Plaines Intercepting Sewer 14B Rehabilitation, NSA Digester Gas Utilization Facilities, SWRP Organic Waste Receiving Station, SWRP Odor Control Facilities, SWRP

STORMWATER CONTRACTS (2016 Award) Streambank Stabilization Project on Oak Lawn Creek Streambank Stabilization Project on Tinley Creek in Orland Park, IL Streambank Stabilization Project along Calumet Union Drainage Ditch Streambank Stabilization Project on Melvina Ditch Melvina Ditch Reservoir Improvements Flood Control Project on the East Branch of Cherry Creek in Flossmoor, IL Controls for Northbrook Wescott Park Flood Control Project at Arrowhead Lake in the City of Palos Heights, IL Flood Control Project for Deer Creek Installation of Green Infrastructure at Chicago Public Schools Buffalo Creek Reservoir Expansion Flood Control Project on Farmers and Prairie Creeks Levee along Thorn Creek at Arquilla Park in Glenwood

STORMWATER CONTRACTS (Under Development) Flood Control Project on the Des Plaines River in Lyons Melvina Ditch Pump Station Improvements Flood Control Project for the W. Fork of the N. Branch of the Chicago River Addison Creek Reservoir Addison Creek Channel Improvements

Comments, Questions?