Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
Discussion: Use of RAPs in system operations Kris Dixit 1.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
June 6, 2007 TAC Meeting NERC Registration Issues Andrew Gallo, Assistant General Counsel, Litigation and Business Operations ERCOT Legal Dept.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
9/14/2015 IEEE Presentation Time-Based Management of Large Scale Network Models John Moseley P.E. Lead Network Model Engineer.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Monthly TCR Calculation DRAFT 3 James J. Teixeira 05/11/02 Also review ERCOT Protocols Section 7 for more details and additional data.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
West to North CSC Location Scenario 3b WMS August 20, 2008.
© Property of ERCOT /06/20041 Overview of SPS in ERCOT February 5, 2004.
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Network Model Management System (NMMS)
Lance Cunningham, Ph.D., PE November Frisco, TX 2.
ERS Update – DSWG Presentation September 21, 2012.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
1 State Estimator performance. 2 State of Technology Many metrics have been proposed for measuring State Estimator performance.. PI = min Σ( Z – h i (x))^
Name Of The College & Dept
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Scheduling and Operating Transmission Devices in the Nodal Environment.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Nodal Planning Go Live Austin, TX February 3, 2011
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 5, 2007.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
NMT – Network Operations Modeling & Telemetry - Project
NERC Published Lessons Learned Summary
Sub Station.
Agenda TSOG 8th November
Barrilla Junction Area Transmission Improvements Project
TAC Report to the ERCOT Board
PLWG Review 6.9 and the Interconnection process
John Dumas Director, Wholesale Market Operations
Phase Angle Limitations
UFLS Workshop Discussion #3
Modifications to Planning Charter
NERC Published Lessons Learned Summary
Compliance Report to ERCOT TAC February 2007
PRC Implementation Plan and Summary of Devices
Presented by: LADWP November 14, 2017
Student’s Name with USN No.
Accurate Fault Location Using Modeling and Simulation
Coordinate Operations Standard
EE362G Smart Grids: Architecture
The Network Model Management System
THE SCHOOL SITE COUNCIL
Planning Meeting November 4, 2010 Marv Landauer.
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Time-Based Management of Large Scale Network Models
Presentation transcript:

Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E. - TXU Energy Trading 5/8/2001 Draft Copy

Presentation Outline Overview of market issues. Request for five types of power flow support files. Request for planned system expansion information details and timing. Concluding issues.

Market Issues Section 7 of the ERCOT Protocols addresses how the issue of congestion management will be addressed. It provides the framework by which Transmission Congestion Rights (TCRs) will be defined, valued & implemented in the market. According to section “ERCOT will convert to a direct assignment of cost methodology of CSC Congestion at the earlier of May 1, 2004 or within six months after the cost of clearing CSC Congestion during a rolling twelve month period reaches $20,000,000.”

Market Issues All Market Participants (MPs), including ERCOT itself, have the need of being able to perform meaningful market simulations that predict the expected amount of future transmission congestion. Many of the pieces of the puzzle required to perform these market simulations (SSTF power flow cases, CSC congestion zones, etc…) are already available to all market participants. However, some specific contingency data required to accurately forecast congestion in an automated fashion is still not publicly available to all market participants.

Power Flow Support Files The following requests (#1 - #5), represent information that is needed by all market participants to perform meaningful transmission studies for ERCOT as a whole. The information sought in these requests in conjunction with the dataset A & B power flow models should provide all market participants the information necessary to study future congestion issues.

Request #1 Publish a listing of single element contingencies, by SSTF bus numbers, that power flow programs perform that are historically known to be invalid (or phantom) contingencies from a physical perspective due to modeling limitations. This listing of phantom contingencies should be developed and stored in spreadsheet format (or some other agreed upon method) that easily allows users to import it into the power flow software that they use. A separate file should be developed, maintained and posted on the ERCOT website by the SSTF for each of the dataset A & B cases that are prepared annually.

Illustration #1 Switching Station B Bus 1 Bus 2 Bus 3 Switching Station E 138 kV 69 kV To Station A To Station C To Station F To Station D PSS/E outages branch with function ACCC. This incorrectly leaves the 21 MW load on the 138 kV system at bus 2 as being back fed from the 69 kV system. As a result, PSS/E reports a 168% overload of the 69 kV feed from Station F. If branch were on an exception list, any user would know that this overload could be ignored and the outage of concern (2 - 3) would still be monitored. 21 MW 69 kV 138 kV

Request #2 Publish a listing of the normal and emergency voltage limits that ERCOT Operations personnel will utilize to make voltage related congestion decisions. The intent of this request is to inform all market participants of the low voltage thresholds that will be utilized when determining transfer capability between the CSC congestion zones and for identifying local area voltage related congestion issues. This listing should be published on the ERCOT website and updated periodically to keep in sync with the ERCOT Operations EMS system.

Request #3 Publish a listing of all the Special Protection Schemes (SPSs) and Remedial Action Plans (RAPs) that are being used, or are planned to be used, in ERCOT and post it on the ERCOT website. Sufficient information such that the implementation date and deactivation date of each SPS and RAP should be specified so that it will be possible for the user to determine in which future year cases that the schemes are applicable. The overall detailing of the scheme should be descriptive enough (i.e. one-line diagrams where necessary) that any user can use it and the SSTF power flow cases alone to interpret how to implement it in a power flow simulation.

Request #4 Provide a listing of all double-circuit lines, by SSTF bus numbers, that are greater than 0.5 miles (as defined by the ERCOT planning criteria) that will be used during planning studies. The list need only include the most limiting sections of a double-circuit line outages and not all of the intermediate sections. Provide an official “good weather” and “bad weather” contingency file that will be used for all operational studies. A separate file should be developed, maintained and posted on the ERCOT website by the SSTF for each of the dataset A & B cases that are prepared annually.

Illustration #4 The entire 138 kV line shown is a double- circuit line. However, for power flow contingency studies related to this example, it is only necessary to study outages of the end sections in order to observe the most severe scenarios. Only branch pairs / and / need to be studied for contingency analysis purposes. The TDSPs via the SSTF should provide a comprehensive list of all double-circuit outages that need to be studied for planning studies and both a “good weather” and a “bad weather” list for operational studies. 138kV Bus 1 Bus 2 Bus 3 Bus 5 Bus 4 Bus 8 Bus 7 Bus 9 Bus 10 Bus 6 Bus 12 Bus 11 Switching Station A Substation B Substation C Substation D Substation E Substation F Switching Station G

Request #5 Provide a listing by load flow bus number of all special contingencies that should be included in power flow contingency studies to reflect the actual response of relay protection and sectionalizing facilities in place that constitute a single element outage. This is necessary since relay operations and sectionalizing often require the removal of multiple power flow branches simultaneously to simulate a single NERC contingency outage in power flow programs. A separate file should be developed, maintained and posted on the ERCOT website by the SSTF for each of the dataset A & B cases that are prepared annually.

Illustration #5 The relay protection in place opens both breakers at Switching Station A and the breakers at Switching Stations A & C for a fault at the point shown. To simulate the conditions immediately after this single element fault, it is necessary to open branches 1 - 2, 7 - 8, 6 - 7, & To simulate the conditions after all possible sectionalizing has occurred, it is necessary to open branches 2 - 3, 3 - 5, & The intent of this item isn’t to create a list of all single element contingencies that have to be studied, only those that aren’t picked up by the automatic contingency functions in power flow packages. Bus 4 Bus 1 Bus 2 155MW 84MW 66MW Bus 6 Bus 5 Bus 3 345kV 138kV Bus 7 Bus 8 Switching Station C Substation B Switching Station A Substation D Switching Station E 345kV There are no sectionalizing switches at this tap point To Switching Station F Fault Location

Planned System Expansion The following requests (#6 - #7), represent information that is needed by all market participants to better understand the planned expansion of the transmission system as detailed in the dataset A & B cases. The same legal disclaimers that apply to the dataset A & B power flow cases should apply to the following requested documents as well.

Request #6 Publish an annual transmission plan document that is posted on the ERCOT website which graphically and verbally illustrates the electrical connectivity (i.e. one-line representation) and proposed in-service date of all projects. The projects proposed and described in this expansion plan document should be of the same scope and timing as the ones modeled in the SSTF dataset A & B cases. This document would be posted annually on the website at the same time as the dataset A & B cases. As an example, the California ISO currently provides this type of information on their website at the following address:

Request #7 Provide a project status report that is updated periodically and documents timing and scope changes to the transmission plan document that is posted annually. Projects that are scheduled to be placed in service within the next twelve months should have their status updated monthly. Projects that are scheduled to be placed in service outside of the next twelve months should have their status updated quarterly.

Conclusions Section 7 of the ERCOT Protocols provides for the creation of TCRs to hedge against transmission congestion. The only way for market participants to objectively determine the value of future TCRs, is to utilize exactly the same study criteria that ERCOT and the TDSPs will be using to study system conditions. This series of requests seeks to make comparable studies possible for all market participants.

Conclusions They will provide information related to the regulated aspects of TCR valuation studies to all market participants in a non-discriminatory manner. It is in the best interest of future system reliability for the specifics of how the grid will be studied, to be broadly known. Currently, all market participants must speculate on how ERCOT and the TDSPs will interpret the NERC planning and operating criteria.