ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.

Slides:



Advertisements
Similar presentations
LAPD Run 2 Results and Notes Terry Tope
Advertisements

LBNF Test Cryostat Requirements David Montanari / Jack Fowler Jan 29, 2015 Rev. 11.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Cryogenic discussion and update 30 October 2014Neutrino platform.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
LAr1-ND Conceptual Design Review of Status June 25 Craig Thorn.
LAr1-ND David Montanari Fermi National Accelerator Laboratory CERN – Feb 16, 2014.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
William Notardonato 1, Adam Swanger 1, Wesley Johnson 2, and Thomas Tomsik 2 1 -NASA Kennedy Space Center 2- NASA Glenn Research Center Ground Operations.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
LAr1-ND Cryogenics Concept David Montanari Neutrino Cryogenics Requirements Meeting 24 September 2014.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
Neutrino Cryogenics Requirements Meeting Overall Summary of Our Discussions Barry Norris (Fermilab) / Johan Bremer (CERN) Neutrino Short Baseline Meeting.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Single Phase Test at CERN Cryostat/Cryogenics Update
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
EHN1 Cryogenic Integration Requirements David Montanari / Johan Bremer Jun 18, 2015 Rev. 1.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Installation of the T600 at Fermilab CSN2, September 22,
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
EXTRACTION OF HIGH VOLUME CRYOGENIC HEAT LOAD
35ton and LAPD cryostats and future DUNE detector development.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
35 Ton LAr Impurity Distribution Measurements and CFD simulation Erik Voirin – Fermilab – Thermal and Fluids Engineering Group / Engineering.
Neutrino Platform Proximity Cryogenics Functional Design M.Chalifour 14/04/2016 M. Chalifour - TE/CRG-CI 2.
ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14,
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
SBND Cryostat Requirements David Montanari, Michael Geynisman, Dimitar Mladenov, Joe Howell 14 October 2015.
European cryogenic days Membrane cryostats for large volume neutrino detectors June 9 th, GENEVA.
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
Installation of the T600 at Fermilab
EHN1 Cryogenics Integration
Neutrino Platform Proximity Cryogenics 62th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Overview of the Long-Baseline Neutrino Facility Cryogenic System
Magnet cryogenic system update.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Proximity Cryogenics P&IDs Meeting
protoDUNE – single-phase Instrumentation - Gas Analyzers
Proximity Cryogenics P&IDs meeting
Instrumentation Used in LAPD and 35T Runs (Dune DocDB 1759)
M. Chalifour - TE/CRG-CI
SPS cryogenic proximity equipment and SM18 validation
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Follow-up of the tests with the copper filter
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Warm structure requirements :
CRYOGENICS OPERATIONS 2008 Organized by CERN
Status of Hydrogen System Development
Cryogenics – The Basics
Operator Training Requirements
CTF Users’ Perspective
Discussion on MERIT Cryogenics Specifications
Cryogenics – The Basics
Presentation transcript:

ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting Mar 3, 2016

Outline Requirements Modes of Operations Process Flow Diagram Process and Instrument Diagram Summary David Montanari | ProtoDUNE Single Phase (NP-04) P&ID2

Requirements (From DUNE Far Detector) Cryo-se-4: The system shall allow recirculation and purification of the liquid argon inventory to achieve the needed LAr purity to meet the scientific requirements (Less than 10 days/volume change based on ICARUS experience). Cryo-se-6: The purification system shall be capable of removing contaminants from the LAr prior to filling and shall maintain purity during operation. LArFD-L2-se-44: Electron Lifetime > 3 ms. Cryo-se-5: The system shall provide an argon gas boil off recovery and reliquefaction system. Cryo-se-16: There shall be no sources of argon gas reliquefaction inside the cryostat, e.g. un-insulated pipes carrying liquid argon. Cryo-se-25: The cryostat and cryogenic systems shall be designed for using the piston-purge technique (introducing heavy gas at the bottom and taking out exhaust from the top) for removing initial electronegative impurities. Cryo-se-8: The cryogenics system shall be designed so as not to introduce unwanted noise into the electronics. Cryo-se-10: The detector cryostat shall provide a stable liquid argon environment for the detector. Cryo-se-28: The cryostat and cryogenic systems shall be designed to maintain a single phase in the entire liquid argon volume at a stable temperature. The chosen temperature is 88.3 K +/- 1 K. Full list available on DocDB n. 112.DocDB n David Montanari | ProtoDUNE Single Phase (NP-04) P&ID3

Modes of operation 1)Piston Purge  GAr is slowly flown from the bottom of the tank to push the impurities out from the top. 2)Cool down  A mix of GAr and LAr is flown into sprayers to generate a mist of small liquid droplets that are moved around by another set of sprayers flowing GAr only. 3)Filling  Once the cryostat and TPC are cold, LAr is introduced in the cryostat. 4)Normal operations  LAr is continuously purified by means of an external LAr pump (2 are installed for redundancy, but only one is in use).  Boil-off GAr is recondensed outside of the cryostat and purified before being reintroduced as LAr. 5)Emptying  At the end of the operations (or if/when maintenance on the tank is needed), the tank is emptied and the LAr removed David Montanari | ProtoDUNE Single Phase (NP-04) P&ID4

Engineering parameters (from Detector Requirements) ModeParameterValueNotes 1 GAr purge flow rate88 m 3 /hrFrom 1.2 m/hr 2 Maximum cool-down rate TPC 40 K/hr 10 K/m T sensors to be defined and placed by Internal Cryogenics/Detector 2 Maximum Delta T between any two points in the detector 50 K T sensors to be defined and placed by Internal Cryogenics/Detector 3 LAr filling flow rate (*)18 l/minAssuming 2 trucks/day (**) 4 Cryostat static heat leak3.0 kWGAr boil-off (18 g/s) 4 Other heat loads (estimate)5.0 kWTotal estimate is ~ 8 kW 4 LAr circulation (5 days turnover)72 l/min (19 gpm)Nominal value (1 pump) 5 Max emptying (w both LAr pumps)144 l/min (38 gpm)Limited by size of tank/truck David Montanari | ProtoDUNE Single Phase (NP-04) P&ID5 Note: Noise, micro phonics and vibrations inside the LAr volume will be studied with an external pump configuration. * Value might be limited by the pressure inside the LAr storage dewar. ** We need to contact the supplier to confirm availability of 2 trucks/day of LAr.

Cryogenic systems Internal Cryogenics:  Inside the cryostat.  GAr/LAr distribution for cryostat purge, cool down, fill. Proximity Cryogenics:  Circulate and purify LAr.  Achieve and maintain LAr purity.  Recondense and purify boil off GAr. Infrastructure/External Cryogenics:  Receive Ar/N2.  Transport GAr/LAr, GN2/LN2 to Proximity.  Vents David Montanari | ProtoDUNE Single Phase (NP-04) P&ID6 This tender covers Proximity and External Cryogenics only. Not part of this tender.

Process Flow Diagram David Montanari | ProtoDUNE Single Phase (NP-04) P&ID7 EDMS:

Cryogen supply (Sheet 3/3) David Montanari | ProtoDUNE Single Phase (NP-04) P&ID8 EDMS:

LAr/GAr Filtration (Sheet 2/3) David Montanari | ProtoDUNE Single Phase (NP-04) P&ID9 EDMS:

Cryostat (Sheet 1/3) David Montanari | ProtoDUNE Single Phase (NP-04) P&ID10 EDMS:

1a) Purge in Open Loop David Montanari | ProtoDUNE Single Phase (NP-04) P&ID11 EDMS:

1b) Purge in Closed Loop David Montanari | ProtoDUNE Single Phase (NP-04) P&ID12 EDMS:

2) Cool down David Montanari | ProtoDUNE Single Phase (NP-04) P&ID13 EDMS:

3) Filling David Montanari | ProtoDUNE Single Phase (NP-04) P&ID14 EDMS:

4) Normal Operations David Montanari | ProtoDUNE Single Phase (NP-04) P&ID15 EDMS:

5) Emptying David Montanari | ProtoDUNE Single Phase (NP-04) P&ID16 EDMS:

Summary We have identified the type, size and location of the penetrations (through the cryostat top and sides) for the cryogenic services and instrumentation. We are developing the P&IDs for Single Phase and Dual Phase. We would like them to be as identical as possible to minimize the cost (and duration) of the design (by vendor). We have identified the spaces required inside the cryostat and in EHN1 for the installation of the cryogenic systems. We are starting the 3D space allocation and integration in EHN1. The documentation (including bids, etc.) needs to be submitted to CERN Finance Committee by Jun 24, The schedule for tendering will be presented in the next talk, it is very aggressive and we need to proceed quickly David Montanari | ProtoDUNE Single Phase (NP-04) P&ID17

Thanks David Montanari | ProtoDUNE Single Phase (NP-04) P&ID18

List of available documents P&ID and PFD:  EDMS EDMS D model and drawings:  EDMS EDMS LAr filtration information:  EDMS EDMS Cryo-Piping design:  EDMS EDMS GAr purge CFD Simulations:  DUNE DocDB n. 903.DocDB n. 903 LAr cool down CFD Simulations:  DUNE DocDB n. 866.DocDB n. 866 This presentation:  David Montanari | ProtoDUNE Single Phase (NP-04) P&ID19

Cryostat with pump towers David Montanari | ProtoDUNE Single Phase (NP-04) P&ID20 EDMS: pumps for redundancy. Only 1 running during normal ops.