FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM 0.000 TO KM 53.000) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.

Slides:



Advertisements
Similar presentations
1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
Advertisements

OBJECTIVES OF PMS  PMS is a web based application for monitoring progress of all projects undertaken by CPWD  Monitoring of projects both at pre and.
MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr
SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.
Pranahita – Chevella Project PHASE - II
(A) Completion of on going works of dam, canals,etc. including restoration of works of dam. PROJECT WISE DETAIL Total Provision Rs Crore Measure/Project/SectorDistt.
By: Alizar Rizvi Fatima Raza VIII-A. Mangla Dam is located on the Jhelum river. Kashmir, Pakistan. It is the 16th largest dam in the world. It was built.
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
NIRAV JAYANTIBHAI DHANDHUKIA SHELADIA MIHIRKUMAR KISHORBHAI
(POLAVARAM) (Head Works)
TADIPUDI LIFT IRRIGATION SCHEME
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
SUCCESS STORIES GHATGAON PANCHAYAT SAMITI Dist-KEONJHAR.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
WEL COME PANCHAYAT SAMITI, MUNIGUDA. 1. Updation of information in the online module relating to Muster Roll, MB entry * Online entries are made on the.
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute.
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Karnataka Urban Infrastructure Development & Finance Corporation Working towards better urban living KARNATAKA MUNICIPAL REFORMS PROJECT 1.
Presented by Telangana Retired engineers forum 11.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
GOVERNMENT OF TELANGANA Irrigation & CAD Department
Mid Day Meal Scheme MDM-PAB Meeting – GUJARAT On
Hyderabad city water supply system
ERT 468 SURFACE WATER MANAGEMENT
Sardar Sarovar Narmada Nigam Ltd.
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Review of CADWM Projects Under PMKSY
Polavaram Irrigation Project
PPL1.6 Pumping Plant Project Overview
Polavaram Irrigation Project
Polavaram Irrigation Project
Virtual Review - #61 by Chief Minister Dt
Polavaram Irrigation Project
#80 Virtual Review by Hon’ble CM dt: 5 Nov. 2018
Polavaram Irrigation Project
#28 Site Visit of Hon’ble Chief Minister Dt. 22nd October, 2018
Polavaram Irrigation Project
#79th Virtual Review by Hon’ble Chief Minister Dt. 29th October, 2018
Polavaram Irrigation Project
#82 Virtual Review by Hon’ble CM dt: 19th Nov. 2018
Polavaram Irrigation Project
#85 Virtual Review by Hon’ble Chief Minister, Dt. 21st January 2019
#89 VIRTUAL REVIEW BY HONBLE CHIEF MINISTER Dt. 25th FEBRUARY 2019
Polavaram Irrigation Project
Presentation transcript:

FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00 KM LINGALA CANAL Head Regulator Discharge: 1350 C/s CHITRAVATHI RIVER LINGALA TANK BONALA TANK IPPATLIA TANK YERRABALLI TANK 300 Ac. KM Ac. KM Ac. KM Ac. KM ,400 Ac. 4,800 Ac. CANAL WIDTH : 12 M Discharge: 37 C/s Bed width: 2.44 M LENGTH OF CANAL: 53 KM DISCHARGE – 1350 C/S AYACUT – 25,000 ACRES Link Canal Goddumarri Anicut PBC Km14.978

C.B.R RIGHT CANAL (LINGALA CANAL) 1 PROJECT PROFILE Excavation of CBR Right Canal from Km.0.00 to Km and its distributaries and including construction of CM & CD works and Link Canal to Pulivendula Branch Canal. 2 Revised Admn. Sanction: G.O.Ms.No. 52, Dt: , for Rs Crores (Revised admn Apprl. for Rs Crs under sanction) 3No. of Packages:1 4Agreement value of packages:Rs Crs 5Expenditure :Rs Crores :Rs Crores Cum. Exp.:Rs Crores. 6Utilisation:3.60 TMC 7AyacutNew Ayacut:25000 Acres 8Storage capacity to Chitravati Reservoir:10 TMC 9Land Acquisition Required (canals): Acres Requisitione d : Acres

11Power required:1.40 MW 1Lift-I Lift Height:24 m No. of Pumps:1 No. Total pumps capacity:750 HP / 0.56 MW 2Lift-II: Lift Height:20 m No. of Pumps:1 No. Total pumps capacity:350 HP/ 0.26 MW 3Lift-III Lift Height:33 m No. of Pumps:1 Nos. Total pumps capacity:125 HP / 0.09 MW C.B.R RIGHT CANAL (LINGALA CANAL) 10Forest Land: Acres Present Status: CCF inspected the lands and sent report to IG of Forests

4Lift-IV Lift Height:15 m No. of Pumps:1 No. Total pumps capacity:75 HP / 0.06 MW 5Lift-V: Lift Height:42 m No. of Pumps:1 No. Total pumps capacity:450 HP / 0.34 MW 6Lift- VI Lift Height:20 m No. of Pumps:1 No. Total pumps capacity:125 HP / 0.09 MW 12Mobilization Advance Paid Recovered :Rs. 7.4 Crs : -- Rs Crs Total: Rs. 7.4 Crs Rs Crs. 13Target Date:3/2007 C.B.R RIGHT CANAL (LINGALA CANAL)

PK G No. Description Name of Contractor Bid /Agreemen t Amount Rs in Crs. Agreeme nt conclude d date Mobilisation Advanace Rs. in Crs. 1 Excavation of right main canal (Lingala canal) from KM 0.00 to KM 53.00, CM & CD works, distributaries, field channels etc. to irrigate 25,000 acres and Construction of Link canal to Pulivendula Branch Canal, Cross regulator, Head regulator, Supply of vertical gates etc M/s Mythas – NCC, Hyderaba d / CATERGORY-I FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM )

Package / Cat – II Excavation of CBR Right Canal (53 Km length), Distributaries CM & CD works, Link canal to Pulivendula branch canal CHITRAVATHI BALANCING RESERVIOIR RIGHT CANAL (LINGALA CANAL) Name of the Contractor: M/s MAYTAS-NCC (JV) Agreement Amount : Rs Crs. Agreement Date: Period of Completion: 24 Months Target date of Completion:3/ Investigation : Completed 2a) Designs (canals) : Approved 3a) Execution: (Canal) : KM in progress against total length of 55 KM 4a) Qty. of earth work done Lakh cum against 65 Lakh cum. 5 No. of Machinery (Machinery wise) deployed Poclains 8 Nos., Dozers – 4, Tippers -6 6Expenditure:Rs Crs. (Inc. Mob. Adv. Rs. 7.4 Crs. ) against Crs.  :Rs Crs. (Inc. Mob. Adv. Rs. 7.4 Crs)  : Rs Crs. 7Mob. Advance recovered : Rs Crores. 8Land Acquisition : Required : 1135 Acres; Requisitioned : Acres