WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.

Slides:



Advertisements
Similar presentations
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
Advertisements

LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
LArTF and MicroBooNE Installation
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
LARP LQX and MQX Cold Mass Testing at Fermilab Overview and Required Test Stand Upgrades Cosmore D. Sylvester.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Tracker Summary Alan Bross MICE CM October 10, 2007.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Linda Bagby - SBN Program Electrical Coordinator ICARUS Electronics Meeting 27 January 2016 SBN Program Operational Readiness Clearance.
Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.
Installation of the T600 at Fermilab CSN2, September 22,
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
1 Our goals for today’s meeting  Confirm FNAL role –a complete review of all cryogenics and gas handling –  We would like an above ground review only.
HTS-2 – FY17 Budget Request Joe Ozelis, Sr. Eng. Physicist PIP-II Budget Retreat 26 April, 2016.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Installation of the T600 at Fermilab Fermilab, February 15,
Neutrino Platform Proximity Cryogenics Functional Design M.Chalifour 14/04/2016 M. Chalifour - TE/CRG-CI 2.
WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1.
S A Griffiths CM42 June 2015 Electrical & Control.
Cryoplant Controls Installation
Installation of the T600 at Fermilab
Cryogenic Plant Electrical and Controls
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Cryomodule test stand at ESS site
Installation Global System
IT-4189 Supply and installation of a cryogenic distribution system
protoDUNE – single-phase Instrumentation - Gas Analyzers
Proximity Cryogenics P&IDs meeting
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
M. Chalifour - TE/CRG-CI
Spectrometer Solenoid Update
SPS cryogenic proximity equipment and SM18 validation
SBN Far Detector integration model overview
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
News and brief overview of Beamline plans for the next few months
Warm structure requirements :
Far Detector Activities Late 2017 – Early 2018
Status of the cryogenic system for B180
Subsea 100 Global Services Products Presentation
SNS Cryoplant Commissioning Past Experiences
Hall C SHMS & Configuration Status
Electron Beam Systems ETC and Methodology
Prototype cryomodule development
CryoPlant Commissioning
Hall C SHMS & Configuration Status
Overview of the TARGET Monolith Rough Vacuum
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011

Introduction: WBS 1-7  WBS 1-7 covers assembly of the active detectors and their installation into the cryostat vessel, transportation and installation of the detector in the experiment hall, and installation of all supporting systems (electronics, cryogenics, etc.) in the experiment hall.  WBS 1-7 Level 2 Tasks  Installation Project Management  Installation Planning and Integration  Readout Racks and Cabling Plan  Installation Execution The installation team (WBS 1-7 & WBS 1-10) serves as the primary interface agent between the subsystems during the installation process. 2August 10-11, 2011CD-2 Review of the MicroBooNE Project

Detector Scale 3August 10-11, 2011CD-2 Review of the MicroBooNE Project TPC Cryostat

WBS 1-7 System Installation  WBS (Project Management)  Voirin & Raaf  WBS (Installation Planning & Integration)  Voirin & Raaf  Coordinate with WBS 1-10 for integration with other subgroups  WBS (Readout Racks & Cabling Plan)  Coordinated by Linda Bagby/Dave Huffman  WBS naturally divides into two major sections:  : Assembly Site Installation (Raaf)  : Experiment Site Installation (Voirin) 4August 10-11, 2011CD-2 Review of the MicroBooNE Project

WBS Readout Racks & Cabling **Dave Huffman and Linda Bagby**  Equipment placement based on several factors:  System technical requirements  Proximity to cryostat port  Ease of maintenance and troubleshooting  Operational Readiness Clearance requirements  Labeling will follow experiment naming convention  Rack equipment tested before move to enclosure  Installation training program 5August 10-11, 2011CD-2 Review of the MicroBooNE Project

WBS Readout Racks & Cabling Major tasks:  Rack Protection  Smoke Detection/AC Distribution  TPC readout  PMT readout  Trigger  High Voltage  Drift High Voltage  TPC Wire Bias  PMT High Voltage  Low Voltage  Cold Electronics Power  Purity Monitor  Cryogenics Control and Monitoring  DAQ and Monitoring computers  PORC of Electronics 6August 10-11, 2011CD-2 Review of the MicroBooNE Project

WBS Assembly & Installation  Major Assembly tasks:  Preparation of clean area for active detectors assembly  Final preparation and cleaning of cryostat vessel  Installation of cryo system devices (temperature & purity monitors, heaters)  Assembly of TPC and installation into vessel  Assembly and installation of PMT system  Preparation for transport to experiment hall  Major Installation tasks:  Rigging crew transport of assembled detector to experiment hall (LADTF)  Installation of detector in LADTF  Contractor execution of vessel insulation  Installation of cryogenics system pumps, piping, controls, etc.  Installation of electronics racks, cabling, etc. (L. Bagby/D. Huffman)  Relocation and installation of LN 2 dewar 7August 10-11, 2011CD-2 Review of the MicroBooNE Project

Rigging 60 ton load 8August 10-11, 2011CD-2 Review of the MicroBooNE Project Yay! We loves big machines!

Cryogenics: Required Components  Systems  LN 2 Supply  LAr Supply  Gaseous Ar Vent  Analyzers  Vacuum System  H 2 Ar Supply  Ar Gas  Miscellaneous valves and instrumentation  N 2 Vent  LAr Recirculation  N 2 Supply  LN 2 Dewar system  Water lines for cooler/turbos  Argon Cool-down system  Heater System on Vessel 9August 10-11, 2011CD-2 Review of the MicroBooNE Project

Process flow Diagram 1 10August 10-11, 2011CD-2 Review of the MicroBooNE Project

Cryogenics Installation  Major tasks:  Installation of Cryo controls system  Checkout of Cryo system with controls 11August 10-11, 2011CD-2 Review of the MicroBooNE Project

Cryogenic System 12August 10-11, 2011CD-2 Review of the MicroBooNE Project

Cryogenic System 13August 10-11, 2011CD-2 Review of the MicroBooNE Project

Overall Work Plan  Vessel design is an integration of all WBS sections  Fabrication by vendor  Installation by contract rigging and FNAL technicians  TPC & PMT systems assembly and installation in vessel  Fabricated parts delivered to FNAL  Assembly by FNAL technicians and MicroBooNE collaborators  Oversight by WBS 1-4 (TPC), WBS 1-8 (PMT), and WBS 1-7  Electronics installation at LADTF  Electronics technicians with oversight from FNAL electrical engineer  Cryogenics design is primarily from FNAL PPD  Installation will be by FNAL mechanical technicians  System check out will be by electrical and cryogenic engineer, assisted as needed by technicians. 14August 10-11, 2011CD-2 Review of the MicroBooNE Project

Work Plan : Integration  Design Integration  Installation plan, Vessel handling, Assembly area options, work out the details.  Develop requirements for each deliverable.  Develop Installation procedures and Hazard analysis.  Construction Integration  Layout Assembly area.  Post Beneficial Occupancy electrical work.  Finalize plans.  Receive and inspect components.  Update Interface Agreements as needed 15August 10-11, 2011CD-2 Review of the MicroBooNE Project

Cost Summary 16August 10-11, 2011CD-2 Review of the MicroBooNE Project 1-7.4

Cost Drivers: Racks & Cabling  Electronics Racks & Cabling  Labor (XX% of total cost for 1-7.3) o Technicians  M&S (XX% of total cost for 1-7.3) o Racks & cabling o Fighting off unwieldy cables 17August 10-11, 2011CD-2 Review of the MicroBooNE Project

Cost Drivers: Assembly  Assembly  Labor (89% of total cost for ) o Technicians o Alignment/Survey crew  M&S (11% of total cost for ) o Clean area tents and supplies o Vessel cleaning contract 18August 10-11, 2011CD-2 Review of the MicroBooNE Project

Cost Drivers: Installation  Installation  Labor (XX% of total cost for ) o Technicians o Alignment/Survey crew  M&S (XX% of total cost for ) o Welders & Tigers & Bears, Oh My! o Pickin’ up stuff with big cranes 19August 10-11, 2011CD-2 Review of the MicroBooNE Project

Schedule Overview (Assembly)  Occupy D0 assembly and prepare working areas (assemble tents, etc.) – Jan 2012  TPC parts begin arriving, assembly starts – early 2012-May 2013  Receive and prepare vessel – Mar/Apr 2013  Install PMT system after TPC placed in vessel – Apr/May 2013  Vessel vendor seals endcap – May 2013  Before sealing, require sign-off from L2 managers that their subsystems are complete and ready to be sealed in vessel  Prepare for transport to LADTF – May/June August 10-11, 2011CD-2 Review of the MicroBooNE Project

Schedule Overview (Installation)  When enclosure (LADTF) is ready, occupy and install vessel promptly – June 2013  Vessel insulation contract – Some time in 2013  Installation of cryo system – Around the World in 80 Days. No, wait… it’s 40 days.  Installation of electronics – Back to the Future  Final check out. – Once Upon a Time in America. 21August 10-11, 2011CD-2 Review of the MicroBooNE Project

Schedule Drivers  Delivery of detector components  TPC parts  Cold electronics  Vessel fabrication and delivery to FNAL  Experiment hall (LADTF) ready for occupancy  Detectors installed and vessel sealed Other concerns  D0 assembly building available (not currently driving the schedule, but could definitely affect things…) 22August 10-11, 2011CD-2 Review of the MicroBooNE Project

Extra Slides 23August 10-11, 2011CD-2 Review of the MicroBooNE Project

Contingency  The MicroBooNE contingency plan has guidelines.  A contingency was developed for each task based on these rules. 24August 10-11, 2011CD-2 Review of the MicroBooNE Project

Where Are We Now?  D0 assembly building not yet ready for occupancy 25August 10-11, 2011CD-2 Review of the MicroBooNE Project

Assembly Floorplan 26August 10-11, 2011CD-2 Review of the MicroBooNE Project