Changwan Yoon Hyoungdo Kim Geunyong Park Seungho Youn Doojin Jeong Team Zeta-Go ; Beat Alpha-Go
1. Design Title 2. Design Objective 3. Benchmarking 4. Functional Requirement 6. Gantt Chart 5. Roles 7. History Log
Team Zeta-Go ; Beat Alpha-Go ▶ Then, what is reconnaissance(recon) ? In a variety of situation such as forest fire accident or military confrontation, reconnaissance means the exploration to gain information about natural features and enemy presence. * reconnaissance 정찰 * all-round 만능의 1. Design Title Development of a all-round recon
Make it possible to reconnoiter at all regions. Team Zeta-Go ; Beat Alpha-Go + ▶ Recon on the ground ▶ Recon on the water surface ▶ Recon in the air 2. Design Objective
Make it possible to reconnoiter at all regions. Team Zeta-Go ; Beat Alpha-Go+ ▶ Recon in the air ▶ Recon on the ground ▶ Recon on the water surface 2. Design Objective
Team Zeta-Go ; Beat Alpha-Go Table 1. Results of the test in this wheeled vehicle 3. Benchmarking (1) Amphibious Armored Wheeled Vehicle * propulsion 추진력
Team Zeta-Go ; Beat Alpha-Go Name : 7.7m Cabin Craft Dimension : 8.3x2.8x3m Dry weight : 1730kg Max Payload : 500kg Dead rise at transom : 27 degrees Hydraulic transmission power : 22HP Top Speed on water : 48knots Speed on land : 7kph 3. Benchmarking (2) Sealeg’s Amphibious Boat
Team Zeta-Go ; Beat Alpha-Go Name : Syma x9 RC quadcopter Cost : $49.30 Dimension : 31x31x6cm Gyro sensor : 6 degrees Material : Plastic, Alloy Flight time : 6 minutes Control distance : 50m 3. Benchmarking (3) RC Plane
Team Zeta-Go ; Beat Alpha-Go Group memberName Changan Yoon Hyoungdo Kim Geunyong Park Seungho Youn Doojin Jeong 3. Benchmarking The process of deciding benchmarking product To decide our team’s benchmarking product, we took a vote and the following is the result of our vote.
Team Zeta-Go ; Beat Alpha-Go Appraisal standardImportance Creativity5 point Suitability10 point Safety5 point CreativitySuitabilitySafetyTotal Armored Wheeled Vehicle Sealeg’s boat RC Plane Benchmarking The process of deciding benchmarking product
Team Zeta-Go ; Beat Alpha-Go property which can be changed in 3D printing process, such as material, density property which is determined in the process of purchasing parts 4. Functional Requirement * TDB : To Be Determined
Team Zeta-Go ; Beat Alpha-Go 4. Functional Requirement
Team Zeta-Go ; Beat Alpha-Go 4. Functional Requirement
Team Zeta-Go ; Beat Alpha-Go 4. Functional Requirement We chose “Quadcopter” among the several copters. (1) Quadcopte’s advantage over helicopter Quadcopter is easy to fly and control. It has a very easy to learn and has a better crash recovery. It is simple and easy to manufacture.
Team Zeta-Go ; Beat Alpha-Go 4. Functional Requirement We chose “Quadcopter” among the several copters. (2) Quadcopte’s advantage over tricopter Quadcopter has more thrust and power. It is more heavier making them able to resist wind. It has the ability to reach more height. * thrust 추진력
Team Zeta-Go ; Beat Alpha-Go 4. Functional Requirement We chose “Quadcopter” among the several copters. (3) Quadcopte’s advantage over hexacopter Quadcopter is cheap to manufacture and maintain. It is powerful enough to add accessories. It has a great thrust and power more than hexacopter.
Team Zeta-Go ; Beat Alpha-Go We chose “Quadcopter” among the several copters. (4) Quadcopte’s advantage over octocopter Quadcopter is much cheaper compared to octocopter. It has longer battery life than octocopter has. 4. Functional Requirement
Team Zeta-Go ; Beat Alpha-Go 5. Roles
Team Zeta-Go ; Beat Alpha-Go 2016 MarchAprilMay Finalpresentation Mar 8 – Mar 15 Project Subject Decision & Role Assignment Mar 15 – April 5 Concept Development / Analysis Mar 22 – May 10 Manufacturing Process May 3 – June 7 June Final report &Individual design notebook submission May 24 June 7 April 26 May 10 Mar 22 Mar 29 April 5 June 21 2 nd presentation 4 th presentation 6 th presentation 8 th presentation 10 th presentation 12 th presentation 5 th presentation April 12 May 3 May 17 May 31 Mar 15 7 th presentation 9 th presentation 11 th presentation 1 st presentation Search for Benchmarking / Functional Requirements Mar 8 Decide Research Topi c Search for Background / Patents / Literatures Mar 15 – Mar 22 April 5 – April 12 Search for Design of Budget, Safety, and Environment 6. Gantt Chart
Team Zeta-Go ; Beat Alpha-Go Team Formed Discussion of subject Meeting with Professor & Decision of subject Making PPT Making PPT Making PPT Presentation Discussion of new subject Meeting with Professor & Decision new subject Research patent and literatures Making PPT Presentation Research benchmarking model Discussion of design & Making PPT Discussion of design & Making PPT Discussion of FRS & Making PPT 7. History Log
Thank you! Team Zeta-Go ; Beat Alpha-Go