Progress Update 1 Mars Planetary Space Suit Team Pablo de León, Jennie Untener, & Mark Williamson NDSTaR 2005 North Dakota Space Grant Consortium Department.

Slides:



Advertisements
Similar presentations
RTI International is a trade name of Research Triangle Institute Technical Assistance to North Carolinas Health & Wellness Trust Funds TUPC.
Advertisements

Tips and Resources IASC Cluster/Sector Leadership Training
NDSTaR 2005 Prototype Mars Planetary Suit North Dakota Space Grant Consortium Pablo de León Jennie Untener Mark Williamson NASA WORKFORCE DEVELOPMENT PROGRAM.
Lively Dynamic Discussions Meaningful Friendships Exciting “Hands On” Learning Activities Fun “Strange but True” Trivia Games Teamwork for Grand Prizes.
VOLUNTEER MANAGEMENT INTERNAL KICKOFF DATE The Leadership Development and Strategic HR Practice Area is presented by American Express. This Service Grant.
C H A P T E R 10 Developing Business/IT Solutions.
System Office Performance Management
22000 Food Safety Management Systems
IT Strategic Planning Project – Hamilton Campus FY2005.
ENVIRONMENTAL MANAGEMENT PLAN
Systems Engineering Management
Systems Development (SD) Presentation Michael Webb IT Director for Medicaid Utah Department of Health UDOH Informatics Brownbag August.
System Office Performance Management
NORMA GOMEZ, MBA, MSN, RN, CNN Unique Challenges for the Nephrology Professional in Managing Change.
Strategy for Excellence Leadership Development & Succession Planning Carl L. Harshman & Associates.
Software Project Management Introduction to Project Management.
Basic Workshop For Reviewers NQAAC Recognize the developmental engagements Ensure that they operate smoothly and effectively” Ensure that all team members.
Academic Research Enhancement Award (AREA) Program Erica Brown, PhD Director, NIH AREA Program National Institutes of Health 1.
Ch. 5: Project Planning Good Quote: Plans are only good intentions unless they immediately degenerate into hard work Lame excuses for not planning: Takes.
Space unit Life in Space.
Cc Developed through a partnership of the Maryland State Department of Education Division of Special Education and Early Intervention Services and the.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
U.S. Department of the Interior U.S. Geological Survey Continuous Records Processing.
Baldrige National Quality Program Baldrige Background l Results l Baldrige Program Impacts Legal Aid Group March 11, 2002.
Network design Topic 1 Business goals. Agenda Network life cycle Network design process Business goals Scope Constraints.
Developing a Project Proposal - SPROUT - ACTRAV-Turin.
The Case for Participation Enter Date Enter Presentation Audience.
Robert L. Jacobs Over 20 years of solid IT experience Results-oriented, innovative solutions Diverse industry background.
The Design Process.
Certificate IV in Project Management Assessment Outline Course Number Qualification Code BSB41507.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
"Learning and achievements of SWA Global platform and its relevance to achieving Hygiene and Sanitation Development in India" India WASH Summit 17 th February.
S TANDARDS, CERTIFICATION AND ASSESSMENT C HAPTER 23 Dr. Ahmad F. Shubita.
NIH R03 Program Review Ning Jackie Zhang, MD, PhD, MPH College of Health and Public Affairs 04/17/2013.
+ CIW Lesson 10 Part A. + IT Project and Program Management Successfully managed IT projects increase productivity and increase profits IT projects differ.
Technical Operations Report Board of Governors Meeting May 7-9, 2015
Table 1: Aggregate trial results: Accuracy while suited. SKILL
The Philippine Quality Award Program
Technical Business Consultancy Project
Transforming the future of public health in Missouri
BUSINESS DRIVEN TECHNOLOGY
Project Management The Roles and Responsibilities of a Project Manager
System Office Performance Management
Fundamentals of Information Systems, Sixth Edition
Systems Analysis and Design in a Changing World, 4th Edition
Fundamentals of Information Systems, Sixth Edition
Accreditation Canada Medicine Accreditation 2016.
TechStambha PMP Certification Training
National Health Corps: A Case Study for Training as a Driver for Member Engagement Sara Wein, MSS, MLSP, LSW Caitlin Hoge, MPS Jennifer Larramore, MPH.
Business System Development
1. Define a Vision & Identify Business Scenarios
HR Business Partner Individual Development Plans
HR Business Partner Individual Development Plans
Department of Special Education
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
Competency Based Learning and Development
Knowledge Translation Across RERC Activities
By Jeff Burklo, Director
The Case for Participation
What is a Design Process?
Systems Engineering for Mission-Driven Modeling
Tour VII: Change Management
United Nations Voluntary Fund on Disability (UNVFD)
The Hub Innovation Program Evaluation Plan
Agenda Purpose for Project Goals & Objectives Project Process & Status Common Themes Outcomes & Deliverables Next steps.
Welcome to Your New Position As An Instructor
Rapid software development
NDSTaR 2005 Prototype Mars Planetary Suit
How to Conduct Effectively
Unit 14 Emergency Planning IS 235
Presentation transcript:

Progress Update 1 Mars Planetary Space Suit Team Pablo de León, Jennie Untener, & Mark Williamson NDSTaR 2005 North Dakota Space Grant Consortium Department of Space Studies University of North Dakota February 16, 2005

Accomplishments to Date  Crafting of Project Mission Statement.  Development of Design Requirements.  Review relevant background information.  Continuing review of major manufacturing challenges.  Initiation of Concurrent Engineering.  Development of initial project process flow – Design-to-Delivery.  Identification of strategies to mitigate management challenges.  Identification of key preparatory work need for project growth.  Drafting a recruitment flyer for skilled CAD designers.  Initiation of team website.

Immediate Challenges  Complete first iteration of CE within 4 weeks.  Develop overall program schedule for the design Proposal, Preliminary Design Review, and Critical Design Review.  Identification of potential design, schedule, and manufacturing critical blockages including outsourcing requirements and tooling.  Develop target schedules and process instructions for each component team.  Become familiar with specific manufacturing techniques.

Project Mission Statement Mars-analogue research activities on Earth can benefit from a prototype Mars planetary suit that simulates many of the challenges future explorers will face during extra-vehicular activities on the Martian surface. Recognizing the iterative nature of planetary suit development, knowledge gained by designing, constructing, testing, and evaluating such a suit on Earth can be applied to future planetary suit development projects. To this end, the North Dakota Space Training and Research 2005 (NDSTaR2005) program will develop a Mars-analogue planetary suit that serves the needs of on-going Mars simulation activities. By developing the suit with the participation of other educational institutions in North Dakota, this project also aims to cultivate a knowledge and experience base needed for future space suit development projects. Ultimately, the fundamental guiding principle of this coordinated effort is to produce the highest quality product delivered on time and within budget.

Ultimate goal is to create the highest quality product delivered on time and within budget. Team Developed Requirements  Pressurized to simulate the challenges of operating within a planetary suit.  Able to don/off the suit in no greater than [10] minutes.  Able to safely ascend and descend a ladder  Conduct standard geological field study and construction activities with modified tools  Conduct standard geological field study and construction activities.  Traverse [45 deg] inclined terrain consisting of loose surface material.  Able to operate a motorized rover while seated.  Material selection and mechanism design suitable for a Martian dust.  Able to quickly remove the helmet in an emergency.  Function safely in the suit unaided for [1.5] hours

More Team Developed Requirements  Re-supply of suit consumables in less than [5] minutes.  Able to operate in the suit for [4 hours] without compromising user health.  Able to accommodate a drinking bag for the user.  Able to communicate to a remote station with voice and video data.  Contain a telemetry system to transmit suit temperature, gas composition, humidity, and toxins measurements.  Telemetry system must transmit heart rate and body temperature information.  Must be able to accommodate a liquid cooling garment.  Excellent helmet field of view.  Suit, life support system, other components must be designed to be repairable.  Suit must be delivered by [March 2006] to the "customer."  Development costs of the suit must not exceed the program’s budget.

Concurrent Engineering

Management Structure

Preliminary Development Process

Summary The team recognizes that the thoroughness of the initial planning and concurrent engineering processes has a direct and irreversible effect on the quality of the final product. We are totally committed to the development of a prototype Mars planetary suit that reflects the technical and organizational capabilities of the institution of higher-education in the State of North Dakota.