SWEA Product Assurance SWEA Peer Review March 28-29, 2011 IRAP, Toulouse.

Slides:



Advertisements
Similar presentations
TYPE CERTIFICATES FOR IMPORTED AIRCRAFT Cooperative Development of Operational Safety & Continuing Airworthiness COSCAP.
Advertisements

G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
Introduction to Software Quality Assurance (SQA)
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
From Research Prototype to Production
Dan Conlon Auditor Workshop “Output Matters” 14 July 2008.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
LSST Camera CD-3 Review Brookhaven National Laboratory, Brookhaven, NY LSST Safety Council Camera Review Bremerton, WA 2015 LSST Camera Environment,
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.
1 DISTRIBUTION A. Approved for Public Release; Distribution Unlimited. 88ABW , 23 May Integrity  Service  Excellence ADT 101: Introduction.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
SWEA Contamination & Planetary Protection SWEA Pre-Shipment Review December 01-02, 2011 IRAP, Toulouse.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
SWEA Planetary Protection SWEA Peer Review March 28-29, 2010 IRAP, Toulouse.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Shipment Review.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
March 28, 2011 MAVEN SWEA instrument Pre-CDR Peer IRAP March 28-29, IRAP Management MAVEN SWEA Instrument Pre-CDR Peer Review IRAP, March.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
01.Oct.01 SPIRE BSM Product Assurance Team Briefing 1 BSM Product Assurance Plan Team Briefing & PA plan roll-out Ian Pain.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
MAVEN Planetary Protection Lead Bob Bartlett Mars Atmosphere and Volatile EvolutioN (MAVEN) Overall Approach to Planetary Protection Wednesday, October.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Camera PDR/CD1 Planning 19 September 2008
Accelerator Readiness Review October 31, 2006
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
EFW DFB Systems Assurance
EFW DFB Systems Assurance
FIELDS Mission Assurance Manager University of California, Berkeley
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
THEMIS Mission Assurance
ISUAL Product Assurance
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
University of California - Berkeley
Module 8 Introduction to Validation
2K CB FDR Overview:  Agenda, Charge, Review Process
Peer Review Agenda (Suggested).
Planetary Protection at ESA
Solar Orbiter EUI Extreme UV Imager
GLAST Large Area Telescope:
BRIAN KLATT MISSION ASSURANCE MANAGER
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
DOE Review of the LCLS Project October 2006
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

SWEA Product Assurance SWEA Peer Review March 28-29, 2011 IRAP, Toulouse

March 28-29, 2011 SWEA Peer Review PA/QA Presentation Outline Introduction Applicable & Reference documents Questions from last PR PA/QA implementation Reliability and Safety/Hazards EEE and M&P Material Review Status EIDP 2

March 28-29, 2011 SWEA Peer Review PA / QA - Introduction ECSS standards are used as a guideline in IRAP projects. GSFC and SSL documents have been accounted for. PA plan has been updated according to comment made by D. Curtis: corrected quality grade from level 3 to level 2. 3

March 28-29, 2011 SWEA Peer Review Applicable & Reference documents MAVEN-PM-RQMT-0006Mission Assurance Requirements (MAR) MAVEN_PF_QA_001PFP MAR Checklist MAVEN_PF_QA_002EUCB Mission Assurance Implementation Plan (MAIP) MAVEN_PF_QA_003UMAVEN PFP Common Buy Parts MAVEN_PF_QA_006APFP Failure Modes and Effects Analysis MAVEN_PF_QA_007A PFP Failure Modes and Effects Analysis, Critical Items List, Critical Items Control Plan MAVEN_PF_QA_008APFP Limited Life Items List MAVEN_PF_QA_009APFP Preliminary Hazard Analysis MAVEN_PF_QA_011APFP Safety Assessment Report MAVEN_PF_QA_012BMAVEN PFP Contamination Control Plan MAVEN_PF_QA_013AMAVEN PFP Bake-out Plan MAVEN_PF_QA_014FMAVEN PFP Connectors & Harness 4

March 28-29, 2011 SWEA Peer Review Questions from last peer review Prohibited materials (section ): Pure tin (Sn), cadmium (Cd), and zinc (Zn) are not used. Solder flux used: ROL0 according to ECSS-Q-ST-70-08C 5

March 28-29, 2011 SWEA Peer Review PA/QA implementation (1/2) PA and QA activities are implemented following the SWEA Performance Assurance Plan. SWEA-AP-0044-CESR_PAP_1.2 Internal PA reporting is done on a monthly basis. External PA reporting is done with project reporting. Local PA manager is registered to ESA alert system and receives additional CNES EEE alerts. Participation to GIDEP is not possible but received alerts will be accounted for. 6

March 28-29, 2011 SWEA Peer Review PA/QA implementation (2/2) Risks and critical items are managed w.r.t. ECSS-M-ST-80C and ECSS-Q-ST-10-04C. Any non-conformance will be managed according to ECSS-Q-ST Documentation is managed with Baghera, a dedicated documentation management system. Configuration control is also managed with Baghera. 7

March 28-29, 2011 SWEA Peer Review Reliability Safety/Hazards Reliability is based on studies performed for SWEA-STEREO. No possible failure propagation will be allowed in SWEA design. Hazards identification process has been carried out. High voltages exist but there is no exposure. NEA (non-explosive actuators) are used but are not exposed (unintended actuation might cause contamination, enable/ disable plugs will be used)  no hazard is identified 8

March 28-29, 2011 SWEA Peer Review EEE M&P Both Parts Control Program and Materials and Processes Control Program are incorporated in the Performance Assurance Plan. All requirements in chapters 11 and 12 of MAR are taken into account. 9

March 28-29, 2011 SWEA Peer Review Materials review status 2618 AApproved: T A Table III: to be approved when statement of no tensile loading provided. Black CopperApproved: Cu2S deposition by electroplating 316LApproved: unsensitized. Scotchweld EC2216 (Gray) Approved: spelling corrected. ArathaneApproved: was Uralane KaptonApproved: replaced with Kapton having acrylic adhesive. Microflon M2 No information found on volatile components; still searching. MUA needed. KerimidApproved: better known as Arlon 35N. Torlon 4203Approved: requires baking process to be performed EP851Replaced be Viton. Nuflon HACNot used Nuflon AGCTNot used 10

March 28-29, 2011 SWEA Peer Review Particular & Molecular Contamination These are dealt with as part of normal work. IRAP having contamination and ESD sensitive parts, the general way of work which is implemented at IRAP covers the given requirements. –MCPs to be 500A –Overall cleaning at level VC-HS. –Additional inspection with UV lamp. 11

March 28-29, 2011 SWEA Peer Review End Item Data Package (1/2) Acceptance testing (as run) procedures and reports including total number of failure free testing Environmental Testing (as run) reports Final Assembly Work Order Material Certification or Analysis Forms Waivers, Deviations or MUAs As-built EEE parts list As-built materials list (ABML) End Item Inspection Report 12

March 28-29, 2011 SWEA Peer Review End Item Data Package (2/2) Nonconformance or problem/failure reports and corrective action summaries List of Open items or one-time occurrences As-built final assembly drawing Photographic documentation of all flight hardware per section 2.3 Any pertinent analyses (mechanical, electrical, reliability, stress, thermal, worst case) As-built configuration list (Item, Manufacturer, Model, etc) Certificate of Compliance signed by management PWB Coupon Results 13