ITU-T WTSA-2008 COM 4 Ad Hoc - SG Restructuring John Visser.

Slides:



Advertisements
Similar presentations
ATU-ITU|TATU-ITU|T Preparing for WTSA Issues on SG Structure Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04 Victoria Falls,
Advertisements

International Telecommunication Union TSAG Newbie Session, July 2004 TSAG Newbie Session TSAG Chairman
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
Geneva, Switzerland, 4 December 2014 ITU-T Study Group 17 activities in the context of digital financial services and inclusion: Security and Identity.
DOCUMENT #:GSC15-GTSC-05 FOR:Presentation SOURCE:ITU-T AGENDA ITEM:4.1 NGN, Testing specification and Beyond Chaesub.
GSC-8024 SOURCE:TSACC TITLE:ITU-T Study Group Restructuring AGENDA ITEM:GTSC 11 07/09/2015 ITU-T Study Group Restructuring J. MacFie Tel
International Telecommunication Union Preparation for WTSA-08 Malcolm Johnson Director, TSB International Telecommunication Union ASTAP March 2007.
Durban, South Africa, 8 July 2013 Outcome of WTSA-12 on spam Xiaoya Yang, Head, WTSA Programmes Division ITU-TSB ITU Workshop on “Countering.
25/11/2015 ITU-T NGN - Progress and Plans Brian Moore Lucent Technologies Chairman of ITU-T Study Group 13 1GSC-9, Seoul SOURCE:ITU-T TITLE:ITU-T NGN -
International Telecommunication Union Accra, Ghana, June 2009 AN AFRICAN VIEW ON THE OUTCOMES OF WTSA-08 Joshua Peprah Director, Regulatory Administration,
Outputs from APT, RCC and Arab Regions WTSA preparatory events ITU Americas Region Preparatory Meeting Buenos Aires, Argentina, May 2012 Paolo Rosa.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
International Telecommunication Union Forum Fiji 16 September 2009 WTSA-08 Resolutions for Developing Countries and Asia-Pacific region Forum on: Implementation.
Recent Results of JCA-NID and TSAG Byoung Nam LEE HyoungJun KIM ETRI, Korea.
World Telecommunication Standardization Assembly (WTSA-08) DOCUMENT #:GSC13-GTSC6-10 FOR:Presentation SOURCE:ITU AGENDA ITEM:GTSC, 8.1 CONTACT(S):Malcolm.
ITU-T Activities in Bridging The Standardization Gap Vijay Mauree Programme Coordinator, TSB ITU ITU Regional Standardization Forum for Asia-Pacific (Jakarta,
International Telecommunication Union Forum Quito 7 July 2009 Committed to connecting the world RELATIONSHIP BETWEEN INPUTS BY THE AMERICAS REGION TO WTSA-08.
World Telecommunication Standardization Assembly (WTSA-08) DOCUMENT #:GSC13-XXXX-nn FOR:Presentation or Information SOURCE:ITU AGENDA ITEM:GTSC, 8.1 CONTACT(S):Malcolm.
Summary of GSC-13 IPR WG Meeting Tom Goode, ATIS IPR WG Chair DOCUMENT #:GSC13-CL-05r1 FOR:Presentation SOURCE:Tom Goode, IPR WG Chair AGENDA ITEM:3.4.
Committed to connecting the world Preparing for WTSA-12 Status at TSAG July 2012 Bruce Gracie, TSAG Chairman.
Inter-American Telecommunication Commission
Inter-American Telecommunication Commission
GSC-16 Closing Plenary Summary Report
14th CJK NGN-WG (Status of New SG 13) Chae Sub Lee
Bundesnetzagentur ITU-T Review Committee (RevCom) Report from first meeting CEPT preparation of future meetings Reiner Liebler, Germany, RevCom.
Review of new Question descriptions under ITU-T SG11
Future Network Standardization Activities in ISO/IEC JTC1/SC6
Preparation for World Telecommunication Standardization Assembly 2016
Status report on CJK NGN Working Group
8th CJK Plenary NGN Workshop for further collaboration March, 2008
ISACC Activities Since GSC-16
AIS AIM SG Ad-hoc Chapters 5-6 Group
Panel Session 3 WRC-15 Agenda item 1.1
GSC-15 Closing Plenary Summary Report
Status report on CJK NGN Working Group
CJK 10th NGN-WG (Preparation for the next SG13) Chae Sub, Lee
ETSI Standardization Activities on M2M communications
CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3 Selection Process Flow Chart] Date.
SG-13 / SSG Information Sharing Session Geneva - 05 November 2002
<month year> doc.: IEEE < e>
<month year> doc.: IEEE < e> <May 2018>
5G and IMT Identification - Views from CEPT-
ITU Regional Standardization Forum For Arab Region SESSION 1 10:30-11:05 Introduction to ITU-T Standardization Process.
Admin Working Group Report to Closing Plenary
<month year> doc.: IEEE < e> <May 2018>
IP and NGN Projects in ITU-T Jean-Yves Cochennec France Telecom SG13 Vice Chair Workshop on Satellites in IP and Multimedia - Geneva, 9-11 December 2002.
GSC-16 Closing Plenary Summary Report
ISACC Activities Since GSC-16
Towards a Common ITU/ISO/IEC Patent Policy
IEEE MEDIA INDEPENDENT HANDOVER DCN:
September 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for September.
ETSI Standardization Activities on Smart Grids
GTSC-4 Chair: Anil Kripalani Secretary: Henry Cuschieri
GSC-15 Closing Plenary Summary Report
Proposed Way Forward for LSI-VC, SDCG for GFOI, and GEOGLAM
Reinhard Scholl, GTSC-7 Chairman
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Initiatives of TSB to implement WTSA-08 Resolutions
November 1999 doc.: IEEE /119r0 November 1999
Malcolm Johnson, Director, Telecommunication Standardization Bureau
Summary of GSC-13 IPR WG Meeting
GSC-15 Closing Plenary Summary Report
DSG Governance Group Recommendations.
Wayne Zeuch, GTSC-6 Chair Nicole Butler, ATIS Staff
Hans, KIM TTA Future of NGN Standards - FG NGN and SGs - Hans, KIM TTA
May 2000 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3 Selection Process Flow Chart] Date Submitted:
GSC-15 Closing Plenary Summary Report
COMMITTEE 4 ITU-T Structure: Points of agreement and
Senior Telecommunication Adviser, Swisscom
Presentation transcript:

ITU-T WTSA-2008 COM 4 Ad Hoc - SG Restructuring John Visser

International Telecommunication Union 2 COM 4 Ad Hoc - SG Restructuring Contents Where we have agreement – Per COM 4 meeting of 24 Oct COM 4 assigned Mandate re: SGs 6, 9, 11 Considerations Proposal and rationale Resulting Study Groups Allocation of Questions – Rationale for addressing COM 4 agenda item 8 – Proposals for 12 sub-items in agenda item 8

International Telecommunication Union 3 COM 4 Ad Hoc - SG Restructuring Where we have agreement Per T05-WTSA08-C-0137!!MSW-E.docT05-WTSA08-C-0137!!MSW-E.doc 2.4It was agreed that the following study groups remain as separate study groups (noting that not all details on the structure were discussed for the above study groups as they will be addressed in agenda items 7, 8 and 9): Note: The following charts include some edits and abbreviations to shorten the text, e.g., SG = Study Group

International Telecommunication Union 4 COM 4 Ad Hoc - SG Restructuring Agreed (1/3) a)SG 2, add Block 4X, transfer QE/2 (and the Quality of Service Development Group, QSDG) to SG 12 b)SG 3 with Block 3A c)SG 5 with Block 5A Note: discussions concerning SG 6 may lead to addition of further work into SG 5 d)SG 12 with Block 12A, add QE/2 (and QSDG)

International Telecommunication Union 5 COM 4 Ad Hoc - SG Restructuring Agreed (2/3) e)SG 13, add Block 19A, transfer Block 13H to SG 15 Note: discussions concerning SG 11 may lead to addition of further work into SG 13 f)SG 15 (Blocks 15A, 15B1, 15B2, 15C), add Blocks 4Y and 13H Note: discussions concerning SG 6 may lead to addition of further work into SG 15

International Telecommunication Union 6 COM 4 Ad Hoc - SG Restructuring Agreed (3/3) g)SG 16 (Blocks 16A, 16B, 16C, 16D) Note: discussions concerning SG 9 may lead to change of work items allocated to SG 16 h)SG 17 with Block 17A, transfer Block 17D (Multicast) to the home of SG 11 Note: allocation of Block 17C is pending further discussions concerning SG 11

International Telecommunication Union 7 COM 4 Ad Hoc - SG Restructuring Mandate of Ad Hoc Group Per T05-WTSA08-C-0137!!MSW-E.docT05-WTSA08-C-0137!!MSW-E.doc 2.5It was agreed to create an ad hoc group on restructuring charged with discussing the way forward for the remaining three study groups, namely SGs 6, 9 and 11, as follows:

International Telecommunication Union 8 COM 4 Ad Hoc - SG Restructuring SG 6 – Stand-alone SG (possibly in collocation with SG 15); or – Disbanded, and merge Blocks 6A, 6B, 6C with SG 15 merge Block 6D into either SG 5 or SG 15

International Telecommunication Union 9 COM 4 Ad Hoc - SG Restructuring SG 9 – Keep as a separate SG (possibly in collocation with SG 16); or – Merge with SG 16 Note: consider the proposals in Contributions 86, 88, 89 (Japan) inasmuch they assist in the identification of an acceptable solution for SG 9.

International Telecommunication Union 10 COM 4 Ad Hoc - SG Restructuring SG 11 – Keep as a separate SG (possibly in collocation with SG 11 (sic); or – Merge SG 11 with SG Note: consider the proposals in Contribution 82 (Canada) on moving Block 17C (Languages) to SG 11, inasmuch they assist in the identification of an acceptable solution for SG 11.

International Telecommunication Union 11 COM 4 Ad Hoc - SG Restructuring Agreed between TSAG Chair candidates When, Chair, Task The group is expected to meet on Sunday 26 October 2008 at 1300 hours. The task of chairing the ad hoc group will be organized by the two candidates to the TSAG Chair, Messrs N. Kisrawi (Syria) and J. Visser (Canada). The group will report back to the COM 4 session Monday 27 October 2008 with an agreed solution for the three study groups. [emphasis added]

International Telecommunication Union 12 COM 4 Ad Hoc - SG Restructuring Some considerations Relationships among work of SGs: – SG 6 to SGs 5 and 15 – SG 9 to SG 16 – SG 11 merged SGs – Block 17C to work of SG 11 in its future home Number of Study Groups – Currently 13; what is the right number? – Need to consider the “whole”, not just the “parts”

International Telecommunication Union 13 COM 4 Ad Hoc - SG Restructuring Some more considerations External perception – Good consolidation of work? – Major reduction in work? SG Leadership – Impacts on candidacies for SG Chairmen and Vice-Chairmen: for HoDs’ consideration Others –

International Telecommunication Union 14 COM 4 Ad Hoc - SG Restructuring Proposal Note: essential rationale on next chart SG 6 closed, work moved to other SGs – Move 6A, 6B, 6C to SG 15 – Move 6D to SG 5 SG 11 continues – To meet co-located with merged SGs – Add Block 17C (Languages) SG 9 continues – To meet co-located with merged SG 16

International Telecommunication Union 15 COM 4 Ad Hoc - SG Restructuring Rationale for Proposal SG 6 closed, work moved to other SGs – Consolidate related work SG 11 continues, co-locates with NGN SG – Maintain visibility of work, relationship to NGN – Adding Block 17C reinforces enhanced mandate wrt testing SG 9 continues, co-locates with SG 16 – Evolving work becoming more closely related – Simplifies cooperation, joint activities, and forms basis for natural evolution of structure

International Telecommunication Union 16 COM 4 Ad Hoc - SG Restructuring Result: 10 SGs SG 2 SG 4 4X Q.E/2 (and QSDG) SG 3 SG 15 4Y SG 12 6A, B, C SG 5 SG 6 6D SG 11 SG 13 SG 19 19A 13H SG 9 17C (Languages) 17D (Multicast) IDNs Co-locate SG 16 SG 17 Co-locate

International Telecommunication Union 17 COM 4 Ad Hoc - SG Restructuring Allocation of Questions Per §8 of General Agenda for COM 4General Agenda for COM 4 Related to SG restructuring Opportunity to save some COM 4 meeting time Proposal: assess situation in this ad hoc meeting and include in report to COM 4 on 27 Oct – For each item, a course of action is proposed – Seek views of participants in this ad hoc meeting on acceptance of proposed disposition

International Telecommunication Union 18 COM 4 Ad Hoc - SG Restructuring Allocation of Questions 1.Proposals by Study Groups – As proposed in C2, 4, 6, except: Questions in Blocks moved to other SGs Decisions on points below 2.Proposal by TSAG – C31 Annex D repeats SG proposed Qs Use as reference for completing allocation of Qs Suggest no further decision is needed on these two points

International Telecommunication Union 19 COM 4 Ad Hoc - SG Restructuring Allocation of Questions 3.New Questions proposed by Japan – C88, 89 (Japan) propose new SGs on “Video Applications” and “Ubiquitous Multimedia Applications (UMA)” – Some new coordination and promotion Qs – “Video Applications” includes most SG 9 Qs, parts of some SG 16 Qs – “Ubiquitous Multimedia Applications” includes most SG 16 Qs, parts of some SG 9 Qs Covered by agreement on co-location of SGs 9 and 16 and anticipated evolution?

International Telecommunication Union 20 COM 4 Ad Hoc - SG Restructuring Allocation of Questions 4.New Question on Secure solutions for mobile payments – C111 (Russian Fed.) proposes new Q for SG 19: “General Architecture of Secure Solution for Mobile Commerce and Mobile Banking” – Received by TSB – Res. 1 §7.3 indicates new Qs need to be submitted at least one month before a WTSA Should be re-submitted to first meeting of SG 13 after WTSA-08?

International Telecommunication Union 21 COM 4 Ad Hoc - SG Restructuring Allocation of Questions 5.New Questions proposed by Iran – C113 proposes 2 new Qs: “Identification of IMT services and service requirements” “NGN-Based products Compatibility” For SG 19 and 13 respectively, or for merged SGs 13 and 19 – Received – Res. 1 §7.3 indicates new Qs need to be submitted at least one month before a WTSA Should be re-submitted to first meeting of SG 13 after WTSA-08?

International Telecommunication Union 22 COM 4 Ad Hoc - SG Restructuring Allocation of Questions 6.Q14/13 to SG 11 – C91 (RCC) proposes Q.14/13 "Protocols and service mechanisms for multi-service data networks (MSDN)" to SG 11 – Q.14/13 is part of Block 13E Interworking – C31 Annex B notes Blocks are “indivisible” Proposal should be referred to first co-located SGs 11 and 13 meeting after WTSA-08?

International Telecommunication Union 23 COM 4 Ad Hoc - SG Restructuring Allocation of Questions 7.QB6/16 to SG 11 / 13; or keep QB6/16 in SG 16 – Q.B/16 “Multimedia gateway control architectures and protocols” is part of Block 16B Applications & systems – Multiple views expressed on both options – C31 Annex B notes Blocks are “indivisible” In absence of consensus, proposal should be referred to first co-located SGs 9 and 16 meeting after WTSA-08?

International Telecommunication Union 24 COM 4 Ad Hoc - SG Restructuring Allocation of Questions 8.Q8/4 to SG 13 – Q.8/4 is part of Q.C/4 per C31 Annex D.3 – Q.C/4 is part of Block 4X Telecom management, including the management of NGN – C31 Annex B notes Blocks are “indivisible” – Block 4X is agreed to be moved to SG 2 Propose this transfer not be accepted?

International Telecommunication Union 25 COM 4 Ad Hoc - SG Restructuring Allocation of Questions 9.QE/2 to SG 12 – C53 (Korea) and 55A2 (CEPT) propose this – Forms part of Block 2Bx (“no name”) which also has Q.F/2 “Network and service operations” (including Service and Network Operations group (SNO) – Agreed in COM 4 No further action needed

International Telecommunication Union 26 COM 4 Ad Hoc - SG Restructuring Allocation of Questions 10.Q.F/17 to SG 11/13/17 – Q.F/17 “End-to-end Multicast” makes up the whole of Block 17D “Multicast” – Agreed in COM 4 No further action needed

International Telecommunication Union 27 COM 4 Ad Hoc - SG Restructuring Allocation of Questions 10.Q.F/17 to SG 11/13/17 – Q.F/17 “End-to-end Multicast” makes up the whole of Block 17D “Multicast” – Agreed in COM 4 No further action needed

International Telecommunication Union 28 COM 4 Ad Hoc - SG Restructuring Allocation of Questions 11.QA/11 (Q1/11), QL/12 (Q13/12), QB/13 (Q2/13), QC/13 (Q3/13), [Q9/17] to merged SG 9 & SG 16 – C40 (Italy) proposes a new SG based on merged SGs 9 and 16 plus indicated Qs – Q.9/17 now several new Qs O and P/17 – Parts of “indivisible” Blocks 11A, 12A, 13A, 13C, 17A Given anticipated agreement on SGs 9 and 16, is there support for transferring these Qs?

International Telecommunication Union 29 COM 4 Ad Hoc - SG Restructuring Allocation of Questions 12.Merge QK/17 and QQ/17 (Q6/17 and Q17/17) – C112 (Iran) proposes merging these Qs – Q.K/17 “Cybersecurity” – Q.Q/17 “Countering Spam by Technical Means” – Both in Block 17A Proposal should be referred to first SG 17 meeting after WTSA-08?