Monitoring Tools Timo Pröscholdt WMO; DRA. Today  Report  Timeline  Outlook.

Slides:



Advertisements
Similar presentations
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
Advertisements

WIGOS monitoring a pilot project WMO; Name of Department (ND)
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) Cg-17, Agenda Dr S. Barrell, Chair, ICG-WIGOS WMO; OBS.
A vision for the WIGOS Information Resource (WIR) WMO; Name of Department (ND)
Observing System Capability Analysis and Review Tool (OSCAR) Detailed functions WIGOS Project Office WMO; Name of Department (ND)
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) TT-PWPP-2 Chair's Opening Remarks WMO; OBS.
Development and Implementation of the WIGOS Data Quality Monitoring System (WDQMS) Doc. 4.4 ICG-WIGOS Task Team on the Plan for the WIGOS Pre- operational.
WMO Planning for the WIGOS Pre-operational Phase: Introduction Dr S. Barrell, Chair, ICG-WIGOS Cg-17 (Side event)
WMO Moving from the WIGOS Framework towards the Pre-operational Phase A. Makarau President of RA I.
WMO WIGOS Data Quality Monitoring System (WDQMS) I.Zahumensky.
WIGOS Data Quality Monitoring System Pilot project for the Quality Monitoring Component WebEx meeting, 1 July 2015, 2 PM (GE) WIGOS Project Office & Observing.
WMO ICG-WIGOS-5 GENEVA, SWITZERLAND, JANUARY 2016 Bertrand Calpini, Co-Chair ICG-WIGOS, CIMO President ICG-WIGOS >>> Our next challenges.
WMO CHy Progress Toward WIGOS Implementation Harry F. Lins President, WMO Commission for Hydrology ICG-WIGOS-5, Geneva, January, 2016 WMO; Climate and.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) ICG-WIGOS-5 Opening Remarks Sue Barrell, Co-Chair ICG-WIGOS WMO; OBS.
REVIEW OF OUTCOMES FROM THE 2 nd WIGOS Workshop on Quality Monitoring and Incident Management ICG-WIGOS-5 WMO; OBS/WIGOS.
WMO WIGOS Pre-operational Phase Regional & National Perspectives Tyrone W. SUTHERLAND (BCT, EC FP for WIGOS)
REVIEW OF OUTCOMES FROM ICG-WIGOS TASK TEAMS Outcomes from the 4 th Session of TT-WMD ICG-WIGOS-5 WMO; OBS/WIGOS.
WIGOS Data Quality Monitoring System (WDQMS) And the Demonstration Project in RA I The Plan, Status and First Results Luís Nunes WIGOS Project Office.
ICG-WIGOS-6 Report from the Commission for Basic Systems
The WIGOS Pre-operational Phase ( )
WIGOS Pre-operational Phase
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
WIGOS IMPLEMENTATION LEAD BY WORKING GROUP ON INFRASTRUCTURE
WIGOS Data Quality Monitoring System;
The Plan, Status and First Results
Yoshiro TANAKA Japan Meteorological Agency
Concept Proposal for RA-III Regional WIGOS Centre
WIGOS Data Quality Monitoring System (WDQMS)
Stuart Goldstraw, Met Office, UK
1st Session of the Task Team on WIGOS Data Quality Monitoring System
Statements from CHy Submitted by: Commission for Hydrology (CHy) (Doc 3d) Inter-Commission Task Team on the WMO information system (ICTT-WIS) WMO, Geneva.
OPAG on Integrated Observing Systems
WIGOS Data Quality Monitoring System (WDQMS)
5th Session of the Task Team on WIGOS Metadata
(Dakar, Senegal, 28 – 30 September 2016)
The Plan, Status and First Results
Sue Barrell, Bertrand Calpini
WIGOS Pre-operational Phase
WIGOS Pre-operational Phase
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
4.2(2) WIGOS Editorial Board (WEdB)
WIGOS implementation in RA II
WIGOS Project Office, WMO Secretariat
OSCAR/Surface (User Perspective)
WIGOS Data Quality Monitoring System (WDQMS)
Overview of the WMO Integrated Global Observing System (WIGOS)
FEEDBACK FROM VARIOUS COMMUNITIES
Dr Sue Barrell, Australia
Inter-Commission Coordination Group On WIGOS
OSCAR/Surface, Vol. A, and the WMO Members
Decisions on CBS activities to support WMO priority activities
REPORT on RWCs in RA VI Ivan Čačić President RA VI ICG-WIGOS-7
OSCAR/Surface – and all you ever wanted to know about it
Co-chair Introduction
WDQMS NWP Pilot Project
EC-69 Side Event Salle C1, 11 May 2017, 13:30-14:30 h
Decisions and Recommendations for the
Monitoring System (WDQMS)
Workshop (… 2016) WIGOS Project Office
WMO RA-II WIGOS Workshop Workshop summary and recommendations
WIGOS Pre-Operational Phase;
Regional WIGOS Centre Tokyo
WIGOS regulatory and guidance material
The WIGOS Pre-Operational Phase
Document 5.4.1(4) Regional Basic Observing Network (RBON) Concept
The status and Plan in 2019 for the WIGOS centers in RA II
COLLABORATION AND ENGAGEMENT WITH CROSS-CUTTING WMO PRIORITIES; WIGOS MAIN OBSERVING COMPONENTS GLOBAL CRYOSPHERE WATCH 25 Jan 2019 Árni Snorrason Chair,
ICG-WIGOS, eigth session, Jan 2019
Inter-Commission Coordination Group On WIGOS
4. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP)   4.4 Development and implementation of the WIGOS.
Presentation transcript:

Monitoring Tools Timo Pröscholdt WMO; DRA

Today  Report  Timeline  Outlook

Report  ECMWF, NCEP and WMO  Defined file exchange format  Every 6h  Per variable and station  Status flags (now harmonized)  Regular file exchange  DWD to join the team soon 3

Issues  Definition of 6h interval  Semantics of flags, especially «rejected»  ECMWF wiki is the specs 4

Specs for monitoring application  Count nr. of received observations in 6h interval  Produce maps, global, regional, & per station  User can select NWP center they are interested in  Conceptual problem: What is the baseline?  Volume A (OSCAR)  Rolling average/max?  (check mockups..)  Defined mockups of reports 5

Mockup I  Station report  Historic graph  Tabular info 6

Mockup II  Global report  Color indicates status  Map info  Controls allow selecting  Center  Variable  Baseline  Period 7

WIR development timeline (TT-PWPP-2) 8 SORTPORTALOSCAR/surfaceOSCAR/spacemonitoring Q4/ % : initial content about WIGOS and its systems provided 50%: basic system developed, tested and deployed. Enhancements being developed 80% : operational since Phase II development completed. 10%: v0.2 of pilot project developed Q2/ %: initial content reviewed and migrated to new CMS system. New website operational. Content mapped to website or extranet 60%: version 1 operational. VolA/OSCAR transition period starts. Planning for version 2. 85%: phase II operational. New SAT team takes over 25%: v0.4 of pilot project. Q4/2016 5%: SORT requirements input into WMO EDMS project 100%: WIGOS page on new website, other WIGOS portal integrated into WMO extranet 75%: M2M interface & geospatial interface implemented, AMDAR integrated. First version of Analysis. Migration of requirements ?35%: Planning for level of integration with OSCAR/surface or elsewhere V0.8 of pilot project %: Decision how to implement SORT 100%End of transition phase.?50%: prototype fully implemented v1.0

WDQMS development Timeline 9 Significant events Quality (and Availability) Monitoring component Incident management system componentRelations with: OSCAR, RWC, Other task teams, Training needs Late nd Workshop on WIGOS quality monitoring and incident management Discuss the current status of the pilot projects and propose detailed draft plan to submit to ICG-WIGOS-5 Discussion and recommendations Early 2016 Prototype for land surface stations ready to demonstrate; 3 NWP Centers participate Specifications for the IMS and start pilot project #1 in RA-I English speaking countries Early 2016 ICG-WIGOS-5; Task Teams on DQM and RWC established Prototype for GOS land surface stations and draft plan endorsed Specifications for GOS land surface stations and draft plan endorsed Recommendations endorsed Mid-2016 Joint session of TT-DQM and TT-RWC Prototype and draft plan discussed Specifications and draft plan discussed Mid-2016 EC-68 Draft plan included in WIGOS document Recommendations approved Late 2016 CBS-16, RA-II-16 Prototype demonstrated Pilot #1 demonstrated Early 2017 ICG-WIGOS-6 Expanded prototype (all GOS surface stations included in the monitoring) Start pilot project #2 in RA-I French speaking countries Mid-2017 EC-69 Expanded prototype demonstrated and guidance material approved Pilots #1 and #2 demonstrated and guidance material approved Late 2017 Expanded prototype operational IMS expanded to all GOS surface stations Early 2018 ICG-WIGOS-7 Full monitoring prototype (include other WIGOS observing systems) discussed Full IMS prototype (include other WIGOS observing systems) discussed Mid 2018 EC-70 Full monitoring prototype approved Full IMS prototype approved Late 2018/early 2019 CBS (Ext) 18 Full monitoring system in pre- operational mode (for more than one WIGOS observing systems) Full IMS in pre-operational mode (for more than one WIGOS observing systems) Mid 2019 Cg-18 Full monitoring system in pre- operational mode (for more than one WIGOS observing systems) submitted for approval Full IMS in pre-operational mode (for more than one WIGOS observing systems) submitted for approval

Outlook  Role of OSCAR  Will use NWP data to compute «status» field  NWP data may also be used to RRR  Use WMO visibility  Role of WIGOS monitoring in WMO performance management  WMO performance indicator? 10

11