Doc.: IEEE /0616r0 Submission May 2013 Phillip Barber (Huawei Technologies)Slide 1 HEW Project Plan Discussion Date: Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /078 Submission May 2000 Matthew Shoemake, AlantroSlide 1 Information Regarding and Status of HRbSG Matthew B. Shoemake HRbSG Chairperson.
Advertisements

Submission doc.: IEEE 11-13/1100r0 September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 HEW SG Progress Review Date: Authors:
Doc.: IEEE /0357r0 Submission March 2011 Marc Emmelmann, Fraunhofer FOKUSSlide 1 A focused path torwards TGai D1.0 Date: Authors:
Submission doc.: IEEE /0609r2 May 2015 Yan Xin, Huawei TechnologiesSlide ay Timeline Date: Authors:
Doc.: IEEE /0699r0 Submission May 2015 Jonathan Segev (Intel Corporation)Slide 1 NGP SG May 2015 Closing Report Date: Authors:
Doc.: IEEE /1514r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Closing Report Date: Authors:
Doc.: IEEE /0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: Authors:
Doc.: IEEE /1301r0 Submission September 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG September 2014 Closing Report Date: Authors:
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0616r2 Submission May 2013 Phillip Barber (Huawei Technologies)Slide 1 HEW Project Plan Discussion Date: Authors:
Doc.: IEEE /1394r0 Submission November 2008 Jose Puthenkulam (Intel)Slide 1 Summary of m Development Process Date: Authors:
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Submission doc.: IEEE 11-13/1493r0 December 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 HEW SG Straw Polls Results Date: Authors:
TGv Closing Report March 2008
IEEE TGa Project Timeline
Light Communications Topic Interest Group March 2017 Closing Report
Light Communications Topic Interest Group March 2017 Closing Report
NG60 SG March 2015 Agenda Date: Authors: March 2015
July 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted: [13.
SG4a Project Timeline January 2003 doc.: IEEE /056r0
On High Efficiency WLAN (HEW) TG PAR Scope
PAD SG Closing Report Date: Authors: November 2012
PAD SG Closing Report Date: Authors: November 2012
IEEE MEDIA INDEPENDENT HANDOVER
802.11ax Timeline Scenarios Date: Authors: May 2014
HEW Study Group Documentation
Closing Plenary Meeting Report for SG 100G Group (1/3)
<month year> doc.: IEEE < e> <January 2018>
March 2009 Closing Report for TGmb
IC DRAFT REPORT IEEE 802 Network Enhancements for the Next Decade Report Date: 13 November 2018 Chair: Roger Marks, Huawei (since March 2018) Participants:
<month year> Denver, March 2006
IC DRAFT REPORT IEEE 802 Network Enhancements for the Next Decade Report Date: 13 November 2018 Chair: Roger Marks, Huawei (since March 2018) Participants:
TGac Status and Timeline
IEEE ah Timeline Projection
January 2003 doc.: IEEE /056r0 May 2004
<month year> doc.: IEEE <030158r0> September 2003
IEEE IMT-Advanced Review Process
Mar Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG4w March 2018 Plenary Closing Report] Date.
SG4a Project Timeline January 2003 doc.: IEEE /056r0
SG4a Project Timeline January 2003 doc.: IEEE /056r0
SG4a Project Timeline Interest Group ‘a’ Activities Aug 03
ISD SG Closing Report Date: Authors: March 2012 March 2012
May Liaison Report Date: Authors: May 2009
RTA TIG Closing Report Date: Authors: March 2019
802.11bd Timeline Date: Authors: January 2019
IEEE IMT-Advanced Review Process
<month year> Denver, March 2006
January 2015 SG CUB Closing Report
<month year> doc.: IEEE < e> <January 2018>
Proposed work items and timeline for the LC SG
Proposed timeline for the Light Communications TG
IEEE SGa Project Timeline
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4n Chinese Medical Band Closing.
Light Communications Topic Interest Group January 2017 Closing Report
September 2009 Closing Report
Timeline for the Light Communications TG
TV White Space Coexistence Plan
Predicting timelines: the track record
TGba September 2017 Closing Report
802.11be Timeline proposal Date: Authors: May 2019
Task Group AY May 2016 Closing Report
EHT SG formation Motion
EHT SG formation Motion
VTS SG PAR/5C Completion Strategy
Proposal for Nendica Study Item: New Managed LAN
TGbb September 2018 Closing Report
IEEE ah Timeline Projection
TGbd Closing Report – Vietnam
Presentation transcript:

doc.: IEEE /0616r0 Submission May 2013 Phillip Barber (Huawei Technologies)Slide 1 HEW Project Plan Discussion Date: Authors:

doc.: IEEE /0616r0 Submission March 2013 Phillip Barber (Huawei Technologies)Slide 2 Abstract Slides to provoke discussion on HEW Study Group project plan and timeline

doc.: IEEE /0616r0 Submission March 2013 Phillip Barber (Huawei Technologies)Slide 3 Objective of HEW SG Per 802 P&P rules, objective is to develop PAR and 5C Plan to Achieve Objective Plan must identify steps and timeline to complete PAR and 5C Focused on deliverables Answer ‘Topicality’ and ‘Viability’ and you complete PAR and 5C

doc.: IEEE /0616r0 Submission March 2013 Phillip Barber (Huawei Technologies)Slide 4 Terms Topicality: the ability to concisely define the topic –Concisely define the topic Can we identify a focused problem to solve? Can we write concise text that accurately describes the problem? Precursor to PAR Scope and Purpose –Value of the topic to the industry Is the problem worth solving? Does solving the problem provide meaningful improvement in the marketplace? Is the problem and its solution distinct? Assessment of 5C broad market potential and distinct identity Viability: assessment of technical feasibility –Make tentative assessment of ability to solve identified problem using technology –Evaluation of sample technologies; non-exhaustive –Complexity? Cost to performance? Proven technology? Possible to test? Reliability? –Assessment of 5C technical feasibility and economic feasibility

doc.: IEEE /0616r0 Submission March 2013 Phillip Barber (Huawei Technologies)Slide 5 Sequence of Activities needed for HEW SG to complete work Organization and Planning Topicality1: Presentations/Discussions to explore the breadth of the contemplated scope-of-work Topicality2: Presentations/Discussions for refinement and to gain common understanding on contemplated scope-of-work Start PAR: Initial draft of PAR(s) and 5C; discuss and refine language on PAR(s) and 5C; initial drafts of supplemental documents, if any (simulation scenarios, requirements document, channel models, others?) Viability: High level discussions of technologies, to provide confidence of our ability to solve identified problem(s) Finish PAR: Finalize and approve PAR(s) and 5C; supplemental documents

doc.: IEEE /0616r0 Submission March 2013 Phillip Barber (Huawei Technologies)Slide 6 Focus of work May Interim  : Organization, Topicality1 July Plenary  : Topicality2, Start PAR, Viability Sept Interim (hard stop) : Viability, Finish PAR Nov Plenary (hard stop) : pending 802 EC approval Pre-SG Phase HEW SG Timeline and Plan: Nov 2013 finish Jan 2013Jan 2014MarchMayJulySeptNov Plenary Interim Study Group approved but pending start Milestone: HEW SG Start Milestone: HEW SG Finish

doc.: IEEE /0616r0 Submission March 2013 Phillip Barber (Huawei Technologies)Slide 7 Focus of work May Interim  : Organization, Topicality1 July Plenary  : Topicality1,2 Sept Interim  : Topicality2, Start PAR, Viability Nov Plenary  : Start PAR, Viability Jan Interim (hard stop) : Finish PAR Mar Plenary (hard stop) : pending 802 EC approval Pre-SG Phase HEW SG Timeline and Plan: Mar 2014 finish Jan 2013Jan 2014MarchMayJulySeptNov Plenary Interim Study Group approved but pending start Milestone: HEW SG Start Milestone: HEW SG Finish March

doc.: IEEE /0616r0 Submission March 2013 Phillip Barber (Huawei Technologies)Slide 8 Options Discussion Nov 2013 option gives only two remaining meetings, July and September, to complete all work of the SG Mar 2014 option gives four remaining meetings, Jul, Sept, Nov, Jan, to complete all work of SG What is our achievable plan? How do we focus work during and between meetings to achieve plan?