July 11-13, 2005 Chan-Hee Cho Korea Electric Power Research Institute Data Analysis Performance Demonstration in Korea.

Slides:



Advertisements
Similar presentations
What FDA Looks for When Inspecting IRBs and Sponsors Marian J. Serge Nurse Consultant Division of Bioresearch Monitoring Office of Compliance Center for.
Advertisements

An Outline for: A User-Based Systems Approach to the Evaluation, Selection, and Institutionalization of Safer Medical Devices.
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Systems Implementation and Operation
INPO Update CMBG Meeting June 2013
MODULE B - PROCESS B1. ASME Organizational Structure B2. Standards Development: Staff and Volunteer Roles and Responsibilities B3. Conformity Assessment:
2 Agenda Goals of documentation training Iowa Administrative Code SURS Reviews Questions & answers.
The System Development Life Cycle
Failure Modes and Effects Analysis A Failure Modes and Effects Analysis (FMEA) tabulates failure modes of equipment and their effects on a system or plant.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
OFFICE OF JUVENILE AFFAIRS Oleoresin Capsicum Spray Utilization Program OVERVIEW.
Future Defence Aviation Safety Regulation Module 7 EMAR Part 147 –Aircraft Maintenance Training Organisations May 2015.
ISO 9000 Certification ISO 9001 and ISO
November 7, Status * Task group initiated in November * Steering Committee requested a summary report in July * Summary report deemed.
Chapter 10.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
NE 127 – Codes, Standards, and Regulations NDT & QA/QC Standards: ISO, ANSI, ATA, AIA, IEEE, etc. INSTRUCTOR: Chattanooga State CC.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
April 15 th is not just the deadline for your taxes!!! Is your documentation complete for Pharmacist to Registered Technician Ratios? Policies.
Monitoring Activities by Internal Audit Coordination Board Ömer DUMAN Head of Internal Audit Coordination Board.
Utilizing Advanced Eddy Current Analysis Tools 34 th Annual EPRI Steam Generator Workshop 1 © Zetec Inc. All rights reserved July 20-22, 2015 – Portland,
Development of Cyber ALARA Program 2012 ISOE Asian ALARA Symposium Choi, Hoon Radiation Health Research Institute Korea Hydro-Nuclear Power Company.
Gravel Neck Fall Outage Processing, 2009 Johnny Rogers Processing Coordinator.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
1 RIC 2009 Current Research Issues in PSA: Korean Status Joon-Eon YANG Integrated Safety Assessment Division Korea Atomic Energy Research Institute 10.
Fire Protection System Deactivation Process April 2007 Rich Kobelski Hanford Fire Marshal 1.
System Implementation
IAEA I&C Activities Presented by Björn Wahlström, Chairman TWG-NPP CI.
Nuclear Research Institute Rez plc. Division of Integrity and Technical Engineering BULATOM June LESSONS LEARNED FROM AGING MANAGEMENT ACTIVITIES.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
Report on Spent Fuel Research and Analysis in the Republic of Korea Jungmin KANG CISAC, Stanford University EASSC 2006 Meeting Beijing, China, November.
Notified Body Problem Solving Warsaw, Poland 24/26 June 2004 Presented by Peter Hanmore For the benefit of business and people TAIEX Workshop on the Pressure.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
MANAGEMENT INFORMATION SYSTEM
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module X Operational safety including operational feedback Case studies This material was prepared.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
The System Development Life Cycle
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
Status and Prospect of Korean Korea Electric Power Research Institute
April 15th is not just the deadline for your taxes
Fort Stanwix National Monument Energy Audit Contract
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
23rd International Railway Safety Conference
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
Radiation Safety Management
Delivering Risk Informed Engineering Programs (50.69) The OG Plan
. Level 3 Air Conditioning Inspections for Buildings
Radioactive waste repositories
Maximum and Minimum Nuclear Power Paths for the Republic of Korea
The Nuclear Power Sector in the Republic of Korea: Nuclear Materials Management/ Fuel Cycle Practices, Plans and Policies Jungmin KANG CISAC, Stanford.
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
Flooding Walkdown Guidance
ETPRES MISSION Conducted: in Jakarta, June 2012
The System Development Life Cycle
Engineering Processes
CLINICAL INFORMATION SYSTEM
leaks thru rupture sticks open closed
What is the UL QFCP? FCIA Webinar Presenters:
Regulatory Oversight of HOF in Finland
New EU Regulation on General Safety Implementation of Tyre Aspects
FEEDBACK Dr. Mohammed Moizuddin Khan Associate Professor.
BASIC PROFESSIONAL TRAINING COURSE Module X Operational safety including operational feedback Case studies Version 1.0, May 2015 This material.
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
EITI - Grievance mechanisms
Presentation transcript:

July 11-13, 2005 Chan-Hee Cho Korea Electric Power Research Institute Data Analysis Performance Demonstration in Korea

2 1 1 Background Outline 2 2 Overview of Steam Generators in Korea 3 3 Performance Demonstration 4 4 KEPRI NDE Center Summary 5 5

3 Background Requirements for the performance of SG tubing analysts  QDA was not mandatory.  SSPD was not implemented.  KEPRI had been preparing PD for the SG tubing analysts. Secondary : only 20% of collected data (2002) SG Tube Rupture in Ulchin Unit 4( )  SG2 R14C38(1RF03)  Long bulge indication (length: about 75mm from TSH) Increased social concerns on the safety of NPPs Before 2004

4 Background (cont.) Increase of Inspection Scope  Bobbin: 100%  MRPC (H/L TTS): 100%  MRPC (C/L TTS): 20% Reinforcement of Plugging Criteria for OPR1000 Model  Wear ≥ 30% for tubes around stay cylinder  Wear ≥ 36% for all other tubes Revision of Notice on the ISI by MOST

5 Background (cont.) Secondary shall analyze 100% of collected data. QDA Requirement Requirement for the Implementation of SSPD Program Revision of Notice on the ISI by MOST

6 Overview of Steam Generators Kori: 4 Units  W-delta 60: 1, W-F: 3 Yonggwang: 6 Units  W-F: 2, OPR1000: 4 Ulchin: 6 Units  FRAM-51B: 2, OPR1000: 4 Wolsong: 4 Units  F/W(CANDU): 1, B&W(CANDU): 3 B&W(CANDU): 3 Operating Steam Generators in Korea Ulchin #1,#2,#3,#4, #5,#6 Wolsong #1,#2,#3,#4 Kori #1,#2,#3,#4 Yonggwang #1,#2,#3,#4, #5, #6 KEPRI

7 Performance Demonstration KEPRI has prepared Performance Demonstration programs since programs since Introduced QDA package and SSPD software from EPRI. Has collected eddy current data from all sites for the SSPD database. database. Performance demonstration program in Korea has been implemented since July 1, implemented since July 1, Performance Demonstration Program in Korea

8 Performance Demonstration KEPRI NDE Center is Operating QDA Program in accordance with Appendix G of EPRI Guidelines: Rev.6 QDA Program in Korea Applicants for QDA Test (by June 2005) Qualification29 Re-qualification5

9 Performance Demonstration 5 Categories for the SSPD Test Yearly-Based & Category-Based Rule for SSPD Test  For the same category and the same calendar year, the examination can be exempted. the examination can be exempted. SSPD Program in Korea

10 Performance Demonstration (cont.) The following rules are applied:  A score of 80% is required to pass.  A time limit of 2 hours is allowed for the test.  In the event that an 80% score is not achieved, additional training and re-examination will be required. training and re-examination will be required.  In the event that an 80% score is not achieved on the re-examination, the individual will not be allowed to analyze re-examination, the individual will not be allowed to analyze data at that plant during that outage. data at that plant during that outage. SSPD Program – Written Examination

11 Performance Demonstration (cont.) The following rules are applied:  A score of 80% minimum is required to pass.  Only two attempts are permitted.  All missed indications shall be reviewed with the examinee.  If the examinee fails the first demonstration, additional one on one training by the Level Ⅲ shall be performed on missed indications training by the Level Ⅲ shall be performed on missed indications and any general area deemed necessary by the Level Ⅲ. and any general area deemed necessary by the Level Ⅲ. SSPD Program – Practical Examination

12 Performance Demonstration (cont.) SSPD Program – Practical Examination (Scoring Scheme) INDICATION CATEGORY ACTUAL %TW NOT CALLED SIZING ERROR MISMATCHED CODE LOCATION ERROR TW INDICATION %-10NA 20-39%-5NA <20%-2NA SAI,MAI,SCI,MCIALL-10NA-5 OTHER 3-L CODES ALL-2NA ORIENTATIONALLNA -2NA FALSE CALL-1 per 10 false calls

13 Performance Demonstration (cont.) SSPD Program - Examinees Examinees for SSPD in Korea (by June 2005) Steam Generator TypeExaminees W-delta 6030 W-F48 Framatome29 OPR CANDU32 TOTAL224

14 Performance Demonstration (cont.) To develop SSPD procedures and database for the sizing analysts Plan to obtain more data from destructive examination SSPD – Further Work Plan

15 KEPRI NDE Center Development & Implementation of NDE Solutions to Promote Safety and Reliability of NPPs

16 KEPRI NDE Center (cont.) Research Projects  Development of NDE System for BOP Heat Exchanger Tubes  Development of Diagnostic Techniques for RCCA by NDE  Development of UT Technique for LP Turbine Technical Supports for Utilities’ Requests  NDE for Main Components of Nuclear Power Plants  ECT for Various Heat Exchangers  Safety Assessment for the Foreign Objects outside SG tubing NDE Personnel Training & Qualification Work Areas

17 KEPRI NDE Center (cont.) SG Mock-up for ECT & Hands-on Training for UT

18 KEPRI NDE Center (cont.) K-PD Program  Co-work with EPRI  Established Performance Demonstration Programs for UT and ECT for UT and ECT Steam Generator Management Program(SGMP)  KEPRI is a member of EPRI SGMP.  SGMP in Korea was implemented in Retired Steam Generator Project  Kori Unit 1 steam generators were replaced in  Old steam generators have many types of degradation.  Study on these degradations. On-going Projects

19 Summary Reinforcement of requirements for SG tubing inspection  Increase of Inspection Scope  Strengthening of Plugging Criteria  Implementation of Performance Demonstration Programs Established performance demonstration programs Plan to develop SSPD procedures and database for sizing analysts analysts Plan to obtain more data from destructive examination of pulled tubes pulled tubes Summary and Further Work