7 October 2005SiD tracking – Chris Damerell 1 Chris Damerell Rutherford Appleton Lab  New charge, given to us by ILCSC on 27 th September (following meeting.

Slides:



Advertisements
Similar presentations
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Advertisements

Snowmass 25 AugustMark Thomson 1 PFA Progress and Priorities Mark Thomson (for Steve Magill, Felix Sefkow, Mark Thomson and Graham Wilson)  Progress at.
Charge to the Workshop Hitoshi Yamamoto March 18, LCWS2005. Stanford.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Summary Remarks By Jonathan Dorfan. We Are Living In a Remarkable Time – We Stand at the Door to a A scientific Revolution  Discoveries of the past five.
10 November 2005DESY PRC – Chris Damerell 1 ILC Detector R&D Chris Damerell Rutherford Appleton Lab  ILC Detector R&D Panel and charge  Addendum to charge,
9 January 2006RDB Meeting – Chris Damerell 1 ILC Detector R&D Chris Damerell Rutherford Appleton Lab  ILC Detector R&D Panel and charge  Addendum to.
H.Weerts March 10, 2006LCWS06--Bangalore 1 WWS Detector R&D H.Weerts Argonne National Lab Report from the WWS R&D panel For the WWS R&D panel: J-C. Brient,
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
ILCTRP WWS  ILCSC D.J.Miller for WWS; 16/11/ Report to ILCSC from the World-Wide Study of Physics and Detectors for a Linear Collider. 1.Proposed*
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
F. Richard LAL/Orsay CLIC-ILC connections on Detectors PAC Paris meeting October 20, 2008.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Report from WWS and charge to the workshop Hitoshi Yamamoto 3/3/05 KEK.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
WWSWWS Next steps for Detectors by F. Richard LAL/Orsay TILC08 TILC08 Joint ACFA Physics and Detector Workshop and GDE meeting on ILC, 3-6 March 2008,
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
PARIS21 Steering Committee26 April 2006 PARIS21 Steering Committee, Paris, 26 April 2006 PARIS21 Work Programme for 2006.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
FALC Was “Funding agencies for linear collider” Now “funding agencies for large colliders” WHY ??
Office of Science U.S. Department of Energy 1 ILC R&D Program Dr. David Sutter, Senior Program Manager Office of High Energy Physics Office of Science.
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
14 April 2006RDB Meeting – Chris Damerell 1 ILC Detector R&D US Funding Needs Chris Damerell  Established funds in FY05 and required funds from FY06 for.
Master Plan Process FY Proposed Draft. October - February Cluster Groups and Units Identify Initiatives These are general goals or outcomes that.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
ILD SiD CALI CE LC- TPC FCAL R&D group (ILC) group (ILC) “collab” (CLIC)  host lab “collab” (LC) “collab” (LC) “collab” (LC) R&D groups involved in “world-wide.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
Costing review Extract from slide of Philippe: The Panel was impressed by the quality of the presentations and degree of detail to which the value.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
Report from the spokesperson -- CLICdp IB meeting Febr. 5 th Lucie Linssen, CLICdp IB, February 5th
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Ian Bird LCG Project Leader Summary of EGI workshop.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Bow Basin Watershed Management Plan Revised Terms of Reference
Presentation to PPAP meeting
Final CALICE OsC meeting: Status and summary of project
Updating the Regulation for the JINR Programme Advisory Committees
GDE and ASIA ACFA ALCSC.
The European Strategy for Particle Physics
CERN R&D plans and Infrastructures
Support- IRDiRC Proposed Work Plan And Communication Strategy
PDAP Junji Haba, KEK.
Preparations for the SiD Workshop at Fermilab, April 9-11
Upgrade Strategy for the Experimental Vacuum Systems
Francesco Forti University and INFN, Pisa
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
The Joint CEOS/CGMS Working Group on Climate
CEOS Work planning Steven Hosford, ESA/CNES, CEO
Yasuhiro Okada, Executive Director, KEK
Collaboration Board Meeting
BSBWOR301 Organise personal work priorities and development
Approach to Market Cutover - Draft for Discussion
Roles and Responsibilities of Council Members and Focal Points
Adult Education Survey Anonymisation Point 6
Preliminary Project Execution Plan
Presentation transcript:

7 October 2005SiD tracking – Chris Damerell 1 Chris Damerell Rutherford Appleton Lab  New charge, given to us by ILCSC on 27 th September (following meeting with Barry Barish et al on 18 th August in Snowmass):  Addendum 1 to the R&D panel charge:  At the request of the chair of the ILCSC, Produce a written report by the end of 2005 which identifies and prioritises the topics and areas of detector R&D which need immediate support. Inputs to this should be collected both from the detector concept teams and from all the detector R&D collaborations and groups interested, via their contact persons with the Detector R&D Panel. Individual proposals should not be identified. This report will initially be submitted to the WWS-OC, and then passed to the ILCSC.  Our Panel is currently discussing how to define ‘topics’, and how to establish priorities  Could lead to expanded funds for detector R&D in USA as early as FY2006. Given the timescale, we need to move fast … Detector R&D Panel – Prioritisation of Topics

7 October 2005SiD tracking – Chris Damerell 2  Currently favoured action plan (still to be agreed by all concerned):  A topic is typically a body of work within a subdetector, eg the minimisation of endplate thickness within the TPC subdetector  Priority 1: Results required in order to prepare LOI at end of 2008 (or as late as 2010 for selected low-cost detector systems, such as vertexing)  Priority 2: Not a potential showstopper, so results post-LOI will be OK. Or, R&D with goals on a longer timescale than ILC startup, eg for upgrade to 1 TeV  Priority 2 items could eventually evaporate if the LOI for the corresponding detector concept is rejected.  To first order, our Panel will simply collect assessments from our contact people. If we are doubtful about priority suggested or sums estimated, we will discuss with them.

7 October 2005SiD tracking – Chris Damerell 3 Subdetector Project N Project N+1 Min endplate thickness Optimise gas mix New money Secure funding Tbd, 1 or 2 TOPICS Publish needs for each topic, with priority ratings eg TPC, Si tracker, ECAL No question of fiddling around with secure funding Priorities Contact people

7 October 2005SiD tracking – Chris Damerell 4  Example 1: PFA for forward jets Is 30%/sqrt(E_jet) achievable? Is thickness of barrel supports (SiD) and/or of endplate (TPC) of critical importance? (ie Priority 1 or 2?) Does any detector concept have the tools to answer this? [evaluation of ‘recovery’ from converted  s and interacting hadrons] LDC people hope to have something for Vienna, but how deeply can they study this?  Example 2: DIRC-based PID From SLD experience, could significantly enhance vertex charge measurement Penalty of 2 cm quartz before ECAL may be modest Overheads from Si-PMTs? Jerry Va’Vra could lead this study

7 October 2005SiD tracking – Chris Damerell 5 GDE (Design) (Construction) Technology Choice Acc CDR TDRStart Global Lab. Det. Detector Outline Documents CDRsLOIs R&D Phase Collaboration Forming Construction Detector R&D Panel Tevatron SLAC B LHC HERA T2K Done! Detector “Window for Detector R&D Andy White, SiD R&D plans, Snowmass, 20 Aug 2005 In practice, cutoff for detector R&D will extend much later, but within the approved collaboration(s)

7 October 2005SiD tracking – Chris Damerell 6 Longer term plans – preliminary discussion with GDE  Initial discussion between R&D Panel members, WWS-OC directors and Barry Barish for GDE took place on Aug 18th  Suggestion is being considered of evolving to a second phase, where our panel would be replaced by a committee under the GDE  This committee would review individual proposals, hold open session presentations, appoint referees, set milestones, require progress reports, etc.  Current composition of Detector R&D Panel would not be appropriate – we are all ILC ‘insiders’ with potential conflicts of interest

7 October 2005SiD tracking – Chris Damerell 7  Wise advice from Enzo Iarocci, who chaired the DRDC for 3 years, starting 1990, in the phase that led to the formation of LHC detector collaborations (4 proposals that condensed into ATLAS and CMS) Panel should have a modest budget (DRDC had approx 6M euros p.a.) in order to provide initial backing for approved projects. Could FALC help with such a central pool of funding? Endorsement by this Panel would be a powerful stimulus for support from national funding agencies Panel should organise Open Sessions, for presentation of proposals and status reports. For 3 years, the Open DRDC meetings at CERN were the main public platform for many LHC-related matters To minimise costs and guarantee large audiences, it may be good to schedule these meetings as part of regional and international ILC meetings (ECFA/DESY workshop in Vienna next month, LCWS2006 in Bangalore in March 2006, …) DRDC did reject a number of proposals and helped to focus R&D in the critical period before the formation of the LHCC or of the detector collaborations

7 October 2005SiD tracking – Chris Damerell 8 Conclusions  Several important developments reported at Snowmass illustrated the provisional nature of many of our studies, despite much hard work since LCWS 1991 (desired granularity for ECAL, potential for physics of vertex charge from an optimised vertex detector)  Current studies are generally well focused – though there are surely some areas which could become more cost effective by pooling resources.  The urgent task of the Detector R&D Panel is to establish the current levels of support in different countries, and quantify the needed expansion  Creation of a global peer review panel with a modest budget to support projects would stimulate the expanded programme that everyone in the detector community knows to be urgently needed (my personal opinion)  >90% of support will continue to be supplied by national funding sources