TAC RELIABILITY AND OPERATIONS SUBCOMMITTEE CMWG/PLWG Planning Criteria Review/Update Report to ROS Austin, TX August 11, 2011 Kenneth A. Donohoo, P.E.

Slides:



Advertisements
Similar presentations
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Advertisements

Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
TAC RELIABILITY AND OPERATIONS SUBCOMMITTEE CMWG/PLWG Planning Criteria Review/Update Report to WMS Austin, TX August 10, 2011 Kenneth A. Donohoo, P.E.
Transmission Planning Process Discussion Joint PLWG / CMWG Meeting Presented by: Luminant Energy June 14, 2011.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Standards Update Project Geomagnetic Disturbance Mitigation Kenneth A. Donohoo, Oncor Electric Delivery Co LLC Chairperson, GMD Task Force Presentation.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
ERCOT Generation Adequacy Study TAC Meeting February 7, 2002.
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
CRR Model Building Process Bradley Bell CRR Engineer.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
Joint PLWG/CMWG Assignment Update to ROS September 15, 2011.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
Response to TAC Questions on PGRR031 TAC– January 28, 2014 Jeff Billo, ERCOT 1.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
Nodal Planning Go Live Austin, TX February 3, 2011
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Market Trials Update NATF March 2,
NMT – Network Operations Modeling & Telemetry - Project
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Freeport Area Master Plan Project -
Modeled Load Levels in the Valley
Transmission Planning in ERCOT- Overview
Barrilla Junction Area Transmission Improvements Project
Director, Transmission Services
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
2011 Prioritization Update to Market Subcommittees
Modifications to Planning Charter
Oncor Electric Delivery Company LLC
Compliance Report to ERCOT TAC February 2007
ISO New England System R&D Needs
ECEN 460 Power System Operation and Control
Reliability and Operations Subcommittee Report
Average Monthly Temperature and Rainfall
Intermittent Resources and Demand Response Integration 2007–2016 Long-Term Reliability Assessment Workshop Bill Bojorquez VP, System Planning August.
31st USAEE/IAEE North American Conference
Basin Electric SPP Market Update
New England Resource Adequacy
Study Results Drought Scenario Study
Joint Areas of Concern Northern Olympic Peninsula Olympia-Shelton Area
Planning Reserve Margin
Objective - To make a line graph.
Wholesale Electricity Costs
Presentation transcript:

TAC RELIABILITY AND OPERATIONS SUBCOMMITTEE CMWG/PLWG Planning Criteria Review/Update Report to ROS Austin, TX August 11, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company LLC

ERCOT ROS Meeting 08/11/2011 Ken Donohoo 2 TAC ROS CMWG/PLWG Effort Part of Holistic Solution (ERCOT Board Directive) Transmission Planning Process is Superior to Other Regions and Continues to Improve Goal is Consistent Operations and Planning Environments Transmission Planning Criteria –Defines Minimum Reliability Planning Requirements –Incorporates NERC Planning Standard –ROS Review, Clarify and Update Planning Data is Consistent with Operations Data –Significant Nodal Planning Go-Live Effort

ERCOT ROS Meeting 08/11/2011 Ken Donohoo 3 ESTIMATED CONGESTION COSTS Top Ten Binding Each Month DEC 2010 JAN 2011 FEB 2011 MAR 2011 APR 2011 MAY 2011 JUL ,805,81131,295,778122,383,94419,252,80739,629,29573,222,69850,733,613 Source: Monthly ERCOT System Planning Report to ROS Estimated Congestion Cost (Shadow Price X Limit) Does not include some Congestion Costs during EEA Events Subtotal $358,323,946

ERCOT ROS Meeting 08/11/2011 Ken Donohoo 4 TRANSMISSION PLANNING SENSITIVITIES Highest – Generation Commitment/Dispatch –Existing Generation –Forced Outages/Derates –Renewable Variability –Future Interconnections & Mothball/Retirements –Environmental Limitations Higher – Transmission Topology –Out of Service/Clearances –Ratings –Impedance High – Load MW & Mvar –Location and Coincidence –Distance From Generation

ERCOT ROS Meeting 08/11/2011 Ken Donohoo 5 TAC ROS CMWG/PLWG Effort Autotransformer Outages –Eight to Twelve Weeks to Replace DOT Transportation Permit Process May require additional station improvements –Units require 18 to 24 months to Build Load Variability –50% Percentile Normal Weather High Temp 104 Degrees F –90% Percentile High Temp 107 Degrees F Low Temp 8 Degrees F

ERCOT ROS Meeting 08/11/2011 Ken Donohoo 6 TAC ROS CMWG/PLWG Effort Transmission Planning Criteria Clarification/Improvement –Thermal Generation Unavailability Forced Outages/Derates Ancillary Service Environmental Limits –Wind Low/High Off Peak Unavailability –Operational Constraints/Limits –Transmission Maintenance Outages –Autotransformer Outages –Dynamic Line Ratings –Load Variability

ERCOT ROS Meeting 08/11/2011 Ken Donohoo 7 TAC ROS CMWG/PLWG Effort Transmission Cost Impact Very Rough Estimates –Additional Autotransformers DFW area 6 to 10 Additional 345/138 kV Autotransformers $50 to $100 Million –Three to Five year acceleration of Transmission Projects –New Projects –More Dynamic Reactive Devices $40 Million Each (+300/-265 Mvar)