GEO Task DI Update for ADC and Workplan Presentation to ADC May 2007 Chu Ishida for Guy Séguin (CSA)

Slides:



Advertisements
Similar presentations
International Aid Transparency Initiative (IATI) First Annual Conference 20 / 21 October 2009 Session 5 The work of the Technical Advisory Group and Proposal.
Advertisements

Natural Disaster Management Project Pakorn Apaphant/Hiromichi Fukui Project and Application Subgroup Proposed to WGISS 23 Hanoi, Vietnam May 21-25, 2007.
© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
© GEO Secretariat Disasters SBA Status of Tasks DI-06-05, DI-06-06, DI New tasks proposed for the WorkPlan G. Rum - 05 September 2006.
The GEO Secretariat Progress Report to GEO-2 November 2003 Helen M. Wood Secretariat Director.
Work Plan Development Guidelines and Schedule.
© GEO Secretariat Virtual Constellations..new planning process which takes account of international users and their requirements from the outset of satellite.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
IGOS-P 15 and GEO Achievements planning meeting in May 2008 at UNESCO, Paris Report to 4 th C4, 17&
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 Report on Report on CEOS Plenary (Nov. 2005) Ivan PETITEVILLE.
Slide 1 WGISS CEOS WGISS 22, Annapolis September 2006 Report on GEO Architecture & Data Committee (ADC) Report on GEO Architecture & Data Committee.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
25th CEOS Plenary | Lucca, Italy| 8-9 November 2011 CEOS Executive Officers Report Agenda Item 17 Timothy Stryker CEOS Executive Officer Kerry Ann Sawyer.
ISSUES TO CONSIDER IN YOUR PROJECT This is a short presentation from issues discussed in a meeting of MCS3 on Tues 2 nd March 2004.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
Committee on Earth Observation Satellites John Bates Chair, Joint CEOS-CGMS Working Group on Climate 3 rd WCRP Data Advisory Committee.
ADC Meeting # 2, Seattle, July 2006 Slide # 1 Status of tasks AG-06-04, AR-06-09, CL-06-02, DA , DA Ivan Petiteville, CEOS Meeting #
Slide: 1 27th CEOS Plenary |Montréal | November Chu Ishida (JAXA) on behalf of Carbon Task Force Co-Chairs, Diane E. Wickland (NASA) and.
CEOS Disaster Risk Management Implementation Phase Status Ivan Petiteville (ESA) on behalf of CEOS DRM Team CEOS SIT-28 Meeting Hampton, Virginia, USA.
Budget Setting Process For 2015 Budget Draft 0.1 Member Forum Date of Meeting: 27th May 2014.
GEO Tsunami Working Group meeting 22 June 2006, Paris 1 Tsunami WG meeting 22June 2007 G. Rum GEO Secretariat.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007.
Semester Conversion CPP Academic Senate March 12 th by F.A.Neto Semester Conversion Director 3/12/20141FAN.
Use of Satellites for Risk Management A key task of the GEO Workplan Dr. Guy Séguin Canadian Space Agency Task co-leader Presentation to the ITU-GEO Workshop:
© GEO Secretariat 10 th UIC Outcomes User Interface Committee Sofia Antipolis, February 2009 UIC co-leads / GEO Secretariat Geneva, Switzerland.
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda Item # CEOS Action / Work Plan Reference CEOS SIT Technical Workshop.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Item 20 Francis Lindsay, NASA CEOS PLENARY Disasters SBA Report.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
Natural Disaster Management Project Pakorn Apaphant Project and Application Subgroup WGISS 24 DLR, Oberpfaffenhofen, German October 15-19, 2007.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda 11 CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th –
GEO ADC meeting, Cape Town, South Africa, Nov. 2007Slide # 1 “Recommendation for task progress management” Chu Ishida, JAXA GEO ADC Meeting, Cape Town,
Page 1 WGISS Response to GEO/CEOS-SIT WGISS-22 Updates Ken McDonald WGISS/Vice-Chair.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-6 prepared by Hans-Peter Plag (IAG/GGOS)‏ Nevada Bureau of Mines and Geology and Seismological.
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
GEO ADC meeting, Tokyo, Japan, May 2007 Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Tokyo, Japan,
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
GEO Programme Board Status and key messages Tim Haigh Programme Board co-chair.
CEOS Response to GEOSS Water Strategy
GCOS IP and Update on CEOS Response
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
GEO strategic directions in support of Disaster Risk Management
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
CEOS Status/Overview Steven Hosford WGCapD-7 Agenda Item #6
CEOS Work Plan Steven Hosford WGCV-43/WGISS-45 10th April 2018
CEOS Workplan FDA actions
CEOS Status/Overview Steven Hosford WGCV-43/WGISS-45 10th April 2018
CEOS Work planning Steven Hosford, ESA/CNES, CEO
Potential Milestones A timeline to finish in one year
Committee on Earth Observation Satellites
Shanya Salamaca September 15, 2010
CEOS Status/Overview Steven Hosford WGCV-43/WGISS-45 10th April 2018
CEOS & Work Plan Status Steven Hosford WGISS-46 22nd October 2018
CEOS & Work Plan Status Steven Hosford WGCV-44 28th August 2018
Prepared at the Joint Meeting For SDCG for GFOI / GEOGLAM / LSI-VC
CEOS Workplan Steven Hosford LSI-VC-5 Agenda Item #1.3 February 2018
WGCapD Perspectives of Work Plan –
SIT Chair Introduction
Strategic Planning Timeline Overview
Common Implementation Strategy for the
CEOS Virtual Constellations Process Paper
WG Disasters Observation for Disasters
CEOS Context LSI/SDCG/GEOGLAM Joint Meeting
Towards a sustainability process for GEOSS Essential Variables
CEOS Work Plan Steven Hosford, ESA/CNES, CEO CEOS SIT-34
Atmospheric Composition Virtual Constellation (AC-VC)
Paolo Valente UNECE Statistical Division
Virtual Constellation Leadership Rotation
Virtual Constellation Leadership Rotation
CEOS & Work Plan Status Steven Hosford, ESA/CNES WGISS-48
Presentation transcript:

GEO Task DI Update for ADC and Workplan Presentation to ADC May 2007 Chu Ishida for Guy Séguin (CSA)

Output and Deliverables By fall 2007, the group aims to deliver: Compilation of user requirements for disaster management using satellites Report on Satellite Constellation Definition Recommendations for implementation A demo of how the virtual constellation might work?

Link to ADC DI is a UIC task Sub-element of task has strong link to architecture – will implement system for GEO member access to disaster information at every phase of disaster management J-L Fellous coordinating with DA (virtual constellations – CEOS)

Long-term Objectives

Approach Creation of DI Steering Committee: CSA, UNOOSA, CEOS, ESA, UNOSAT, IGOS, Geo Secretariat Steering Committee has created two sub-groups: User Working Group (David Stevens, UNOOSA): will compile list of available documents for roll-up into user requirements report, and draft user report Constellation Definition Working Group (Guy Seguin, CSA): will examine preliminary user report, propose specific architectures to meet needs and draft a timeline for implementation DI Steering Committee will draft recommendations for implementation based on reports of each sub-group.

Timeline March: kick-off telecon (12 th ) and compilation of background materials April: second Steering Committee telecon (26 th ), circulation of background documents (week of 30 th ) May: 1 st group-wide telecon (May 9 th ); circulation of user report outline and presentation of status to ADC (mid- May);circulation of 1 st draft of user report (end May); June: Third Steering Committee telecon (4 th ) Initial definition of constellation architecture (week of 11 th ); User sub-group meeting Vienna (14 th ) Mission definition sub-group meeting at ESRIN (18 th ) & report to DA September: Reports of sub-groups; Steering Committee meeting to review and discuss recommendations; review of possible demonstration (5 minute video) for presentation at Ministerial Conference or parallel venue