Universal Current Meter Training Model OSS-B1 Hydrological Services Pty Ltd Available for rent from Tech-Rentals.

Slides:



Advertisements
Similar presentations
RP4A 2½ – 6. Modification Overview Production of the RP4A series began in Production of the RP4A series began in A Lead free version (4ALF)
Advertisements

RP4AN 21/2 – 6. Modification Overview Production of the RP4AN series began in Production of the RP4AN series began in The 4AN indicates an.
Current Meter Maintenance Model OSS-B1 Hydrographic Basics Training Course No
Current Meter Maintenance Model OSSPC1 Hydrographic Training Bandar Seri Begawan Brunei August 2010.
NORTH POWERED AIR-PURIFYING RESPITATOR (PAPR) INSTRUCTIONS FOR USE Preventive Medicine Industrial Hygiene Service.
Salk Institute Mobile Lab Gel Electrophoresis Teacher Instructions Edvotek Set Up 12 groups.
Current Meter Maintenance HS Model OSS-B1 Hydrological Services Pty Ltd Presented to HiQ Engineering Brunei JULY 2009.
Permanent Head Gasket & Block Repair w/Nanotechnology, 32 Fl Oz
Prestige ex 2000 TECHNICAL MANUAL 2ND STAGE
Troubleshooting Guide. Table of Contents 2 Shower Filter 3 Leak Between Top Housing & Filter4 Leak Between Swivel Collar & Housing5 Leak at Top of Swivel.
TSI Nephelometer Zero Filter Assembly Zero filter valve Zero filter Zero filter motor Metal flange.
A Manual for Repair and Maintenance Technicians 1ST STAGE.
Split steering gaiter (nearside) this is an MoT failure.
¾”-2”. Modification Overview  Production of the series began in 1989 and is current.  Early models of ¾”-2” series did not always.
Salk Institute Mobile Lab Gel Electrophoresis Teacher Instructions VWR Set Up 12 groups Mira Costa kit.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
Salk Institute Mobile Lab Gel Electrophoresis Teacher Instructions BioRad Set Up 8 groups Grossmont Kit.
Wheel Bearing Service. - Remove the cap using a flat head screw driver or pipe pliers. Careful not to damage the cap.
Small Engine Reassembly Briggs & Stratton OHV
Tru Count Air Clutch Maintenance
This task covers: a. Removal b. Cleaning and Inspection c. Installation INITIAL SETUP: Equipment Condition  Front axle spindle removed. Materials/Parts.
New Mexico FFA Agricultural Mechanics Career Development Event Engine Power.
MECH1200 SEALS, GASKETS & SEALANTS. MECH1200 WHAT CAUSES LEAKS Causes of leakage –Worn or damaged seals –Worn or damaged gaskets –Worn or bent parts or.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
Tempest Blower SECTION: Tools and Equipment ISSUED: REVISED: ##-####
PRE s ENT TO TRANSFER CASE WORK…….. ALL TO THE GEAR BOX……. -MAINTAINANCE….. -CHANGING OIL GEAR BOX…. -CHECKING OIL GEAR BOX……
General user guidelines New users –Notify the lab ( –Go over lab protocol slides –If in doubt, ask Sign up for.
Clearing Procedures. DISASSEMBLY Major Groups Barrel Group Turn the cover latch and raise the cover group Grasp the retracting slide handle with the.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
Hub and Wheel Bearings Wheel bearings allow the wheel to turn freely. The bearings may be either tapered roller bearings or ball bearings. If the spindle.
NorthstarRecycling.com Place materials like the following in this container for cardboard recycling: Corrugated Sugar Bags White Cardboard Brown Cardboard.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
 A car Jack  A wrench  A flat surface Put the car into park and apply the parking brake.
Basics of Medical Equipment Lecture 5
Manual Instructions Installation Cleaning Instructions
Copyright © 2016 by The S.E.A. Group
Manual Drivetrains and Axles
Model : ASC Airswitch Installation Instructions
Oral Glucose Tolerance Test
Giving your Trombone a Bath
OBJECTIVES Discuss the various methods of loosening the brake bleeder valve. Discuss the need for brake bleeding. Describe the manual bleeding procedure.
Engine Lubrication Systems
826YD 21/2”-10”.
009 2½”-3”.
007 2½”-3”.
RPDA 4AN 21/2” – 6”.
Gel Electrophoresis Teacher Instructions BioRad Set Up 12 groups
830, 831 4”- 6”.
¾”-2”.
Wednesday, 9/7 Day 2 2- Fill out your Agenda. Science Starter:
007DCDA 2½”-3”.
TROUBLESHOOTING ELECTRIC MOTORS
007DCDA 2”.
4000B (M3) ½”-2”.
BOP FLUID FLUSHING SIMON McMANUS WM CANNING LTD.
4D-100, 4D-600 2½”- 10”.
LF856 2½”-10”.
850 (LF) ½”- 2”.
MOUNTING OF MACHINE ELEMENTS ON TRANSMISSION SHAFT (PULLEY & BEARING)
709DCDA 2½ ”-10”.
3000B 2”.
Giving your Brass Instrument a Bath
007 2½”-3”.
007DCDA 2½”-3”.
007DCDA 2”.
3000B 2”.
DC4AN 2½” – 6”.
757, 757N, 757Z (2½ ” – 10”) 757A (2½ ”- 6”).
709 3/4”-2”.
709 2½ ”-10”.
Presentation transcript:

Universal Current Meter Training Model OSS-B1 Hydrological Services Pty Ltd Available for rent from Tech-Rentals

Section 1 Prior To Discharge Measurements

Prior To Discharge Measurements ● Open the case and pick up the Fan assembly ● Turn Fan Carrier Anti-Clockwise Anti- Clockwise

Prior To Discharge Measurements ● Remove fan carrier and shaft assembly (do not put it down anywhere it may attract dirt particles) ● Hold the fan upright and ¾ filling as shown in figure Use Lint Free Tissue

Prior To Discharge Measurements ● Replace axle and fan carrier, excess oil will be forced up through the capillary gap around the axle, ensure fan carrier is tightened ● Wipe the excess oil of the meter using lint free paper towel Clockwise

Prior To Discharge Measurements ● Do not forget to close the oil bottle straight after usage to avoid contamination of the oil ● Slide the fan assembly into the body and use the stubby screwdriver to tighten the retaining screw to lock the fan assembly in place

Prior To Discharge Measurements ● Prior to spin test hold the current meter in the horizontal position and spin by hand for approx. one minute to get rid of the hydraulic pressure ● Spin test the meter against time. This is required to test the performance of the shaft and bearings

Prior To Discharge Measurements ● Spin test results are dependent on the fan type Time (sec)Fan No. Minimum 90 sec4 2 Minimum 110 secA Minimum 90 sec1 OSS-B1 Spin Test

Prior To Discharge Measurements ● After the spin test is performed connect your current meter to the counter using the lead, this important to test the lead, reed switch and counter.

Section 2 During and after Discharge Measurements

During and after Discharge Measurements ● After every discharge measurement, or one hour of use the current meter should be cleaned and refilled with oil, if continuing a discharge measurement.

During and after Discharge Measurements ● Undo the cleaning jar cap and ¾ filling with white spirit ● Remove fan assembly from meter body by undoing the retraining screw and separating the body from the fan Cleaning Jar

During and after Discharge Measurements ● Remove fan carrier and shaft assembly (do not put it down anywhere it may attract dirt particles) ● Empty the old oil in a recycling container (do not tip oil on the ground this will pollute the environment)

During and after Discharge Measurements ● Put the shaft and bearing assembly into the cleaning jar. ● Agitate them ● Fill up the fan with white spirit put your thumb in place of carrier and shake it really hard for a few seconds.

During and after Discharge Measurements ● Blow dry the shaft assembly, fan carrier and fan. ● Re-assemble the fan, if discharge measurement is finished

During and after Discharge Measurements ● Wipe box clean and return the fan assembly to the case ● If continuing a discharge measurement, Refill the fan with oil

During and after Discharge Measurements ● Spin test the current meter against time as shown in section 1 ● After the spin test is performed connect your current meter to the counter using the lead, this important to test the lead, reed switch and counter.

Section 3 Office Cleaning

Office Cleaning Office cleaning should be performed on a monthly basis or whenever the meter is dirty and require a good cleaning to put it back in operation

● Dismantle Fan Carrier and shaft assembly from from Anti- Clockwise Office Cleaning

● Separate Fan Carrier (1) From Shaft assembly (2) 12 Office Cleaning

● Dismantle Shaft as shown in the figure ● Follow the images in sequence Office Cleaning

Remove Nut Remove Bearing Office Cleaning

Remove Outer SpacerRemove Inner Spacer Office Cleaning

Remove Bearing Fan assembly fully dismantled ready to clean Office Cleaning

Place in Sink Ready to Clean, Soak for at least 5 minutes Start Cleaning Office Cleaning

Cleaning FanCleaning Fan Carrier Office Cleaning

Cleaning Outer Spacer Rinse full assembly with Tap Water Office Cleaning

● Place Full Assembly on a Lint Free Tissue ● Ready to dry and Re- assemble. Office Cleaning

Dry Fan Carrier Office Cleaning Dry Fan

Office Cleaning Dry Outer Spacer Dry Inner Spacer Office Cleaning

Blow Dry Bearing & Nut Office Cleaning

Start Shaft Assembly, Bearing First Assemble Inner Spacer Office Cleaning

Assemble Outer SpacerAssemble Bearing

Assemble Axle Nut Dip Shaft Assembly in White Spirit To lubricate bearings Office Cleaning

Blow Excess White Spirit Assemble Axle With Fan Carrier Office Cleaning

● Assemble Fan and Place In Carry Case. For The Next Field Trip Clockwise Office Cleaning

Section 4 Calibration

Calibration ● Recalibrate the current meter every 300 hours of use or once a year which ever comes first (see Hydrological Services calibration certificate for details) ● For recalibration only, send the body and the fans that require calibration (to save weight). However, if other items needs repair they can be sent with the body and fans. Note: Hydrological Services provides a recalibration and repair service for all types of current meters.

O-ring replacement The following image shows the locations of the various O rings require to provide an adequate water seal in the system.