TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.

Slides:



Advertisements
Similar presentations
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
Advertisements

1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr
SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.
Pranahita – Chevella Project PHASE - II
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
(POLAVARAM) (Head Works)
TADIPUDI LIFT IRRIGATION SCHEME
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
Measures of ecological patency on River Lieser and Moselle.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Karnataka Urban Infrastructure Development & Finance Corporation Working towards better urban living KARNATAKA MUNICIPAL REFORMS PROJECT 1.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
GOVERNMENT OF TELANGANA Irrigation & CAD Department
FARAKKA BARRAGE PROJECT (SERVING THE NATION SINCE 1975)
Presentation on Ken – Betwa Link Project-Phase-II
Sardar Sarovar Narmada Nigam Ltd.
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
بازاریابی و بازرگانی زمستان 93.
Review of CADWM Projects Under PMKSY
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Virtual Review - #61 by Chief Minister Dt
Polavaram Irrigation Project
#80 Virtual Review by Hon’ble CM dt: 5 Nov. 2018
Polavaram Irrigation Project
#28 Site Visit of Hon’ble Chief Minister Dt. 22nd October, 2018
Polavaram Irrigation Project
#79th Virtual Review by Hon’ble Chief Minister Dt. 29th October, 2018
Polavaram Irrigation Project
Polavaram Irrigation Project
#82 Virtual Review by Hon’ble CM dt: 19th Nov. 2018
Part 4 - Sediment management options + exercise
Polavaram Irrigation Project
#85 Virtual Review by Hon’ble Chief Minister, Dt. 21st January 2019
#87 Virtual Review by Hon’ble Chief Minister Dt: 04 FEB 2019
#89 VIRTUAL REVIEW BY HONBLE CHIEF MINISTER Dt. 25th FEBRUARY 2019
Polavaram Irrigation Project
Transportation/Systems
#86 Virtual Review by Hon’ble Chief Minister, Dt. 28th January 2019
Presentation transcript:

TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels and CM & CD Works LEFT EARTH DAM RIGHT EARTH DAM 1205 Cusecs [ Length of Earth dam 8.80 Km] BARRAGE TUNNEL DIVERSION CANAL(FFC) BARRIAGE HEAD WORKS [Kotagandedu(V)] CHAMPAVATI RIVER 5.5 m dia Left Main Canal – 6.10Km 9,924 Acs Right Main Canal – Km 14,786 Acs Excavation of LMC including Distributories, Field Channels and CM & CD Works KUMILI RESERVOIR (1.883TMC) EPC Package Works under recall Present Status : Tenders approved

1 PROJECT PROFILE : Construction of Barrage across Champavathi river near Kotagandredu (V) to irrigate an ayacut of 24,710 acres. 2 Administrative Sanction : Govt. Memo. No / Med. Irrgn(1) / 2005, I & CAD, Dt fro Rs Crs. 3 No. of EPC Packages : 1 Nos 4 Agreement value of 1 package : Rs Crs. 5 Budget provision for : Rs Crs. 6 Expenditure of the project 2004 – 05 : Rs Crs – 06 : Rs Crs. Cum. Exp. : Rs.1.46 Crs 7 Utilisation : TMC 8 AyacutNew Ayacut : acres Stabilisation : 8172 acres 9 Land Acquisition : Required : 2811 acres 10 Clearances : All CWC clearances including investment clearance obtained TARAKARAMA THIRTHA SAGARAM RESERVOIR PROJECT

Pkg.No. : Construction of Barrage at Kotagandredu (V) across Champavathi River with afflux bunds, Head Sluice, Excavation of Diversion canal including CM & CD works and Tunnel, Formation of Earth Dam to form a Reservoir with two Head Sluices Weir, Surplus Course and etc. Name of the Contractor: M/s. CR 18 G-BSCPL (JV) Agreement Amount : Rs Crs. Agreement Date: - - Period of Completion: 2 Years Tender for the work were received and opened on The firm CR-18 G-BSCPL (JV) came as L1 and were submitted to the Government. The evaluation committee meeting was held on and the tenders are yet to be settled. TARAKARAMA THIRTHA SAGARAM RESERVOIR PROJECT