East Area Renovation Project Planning activities Quentin Bouirek / EN-EA, East Hall under construction

Slides:



Advertisements
Similar presentations
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Advertisements

CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Winter 05 Project Schedule A Gantt Chart is a means of presenting the master schedule of activities for your project –Named for Henry L. Gantt ( ),
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Construction and Installation of the CLIC Experimental Area
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini TE-EPC TEEPC.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
LHC machine status ~ Daily Summary ~ Daily beam commissioning meeting Week 42 - October 14 th, 2015 CERN, Geneva, CH M. Lamont and S. Redaelli for the.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
HIE-ISOLDE Project Status Report: Planning of Phase II 74th ISOLDE Collaboration Committee meeting November 10th 2015 Y. Kadi.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
The AWAKE Safety Documentation C. ALANZEAU (editor) & Stakeholders –
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
East Hall under construction
SPS Personnel Protection System Renovation Project
East Area Renovation Project Team meeting # 2 – EDMS News
TE-EPC internal review of the ELENA project
EHN1 Extension planning
AD consolidation activities in LS2
The ELENA Safety Documentation «time to prepare the safety clearance»
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
East Hall under construction
East Hall under construction
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
رؤية مستقبلية لتطوير كلية الزراعة جامعة الفيوم
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
Experimental Areas – LS2 planning
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
East Hall under construction
Safety in the East Area Renovation Project
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

East Area Renovation Project Planning activities Quentin Bouirek / EN-EA, East Hall under construction

Master schedule Q. Bouirek, East Area Renovation Meeting 2 SHUTDOWN/ TS PROTON PHYSICS COMMISSI ONINGIONS JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND GroupActivity TE-EPC Procure Power Converter TE-MSC Prepare new yokes TE-MSC Remove magnets TE-MSC Modify magnets TE-MSC Re-install magnets EN-EL Renovate AC&DC distribution EN-CV Renovate cooling systems SMB-SEBuilding TE-EPC Install new power converters EN-EA Change beam line layout + vacuum beam pipe EN-ACESurvey All Commission new facility SMB-CE intervention during operation under investigation Commissioning after injectors &LHC, driven by Power Converters

Project management schedule Q. Bouirek, East Area Renovation Meeting3 Global vision on the project Completed after each WP meetings

Synthetic linear schedule Q. Bouirek, East Area Renovation Meeting4 Easy overview of the ongoing activities Highlighting the coactivity Evolving areas and timescale, depending the currents activities

EA Renovation linear schedule Q. Bouirek, East Area Renovation Meeting5

Gantt project Online Gantt Possibility to display Safety information, File numbers, IMPACT numbers Online Project Accelerator Complex Schedule Q. Bouirek, East Area Renovation Meeting6

Summary Q. Bouirek, East Area Renovation Meeting7 Waiting for your inputs, constraints and waiting period Thanks for you attention !