Wiener crates; An installation and power supply analysis. Magnus Bjork Be/Co/Fe

Slides:



Advertisements
Similar presentations
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
Advertisements

QUALITY AND TECHNOLOGY
ENERGY CONVERSION ONE (Course 25741)
EMC in Electrical Power Systems Frithiof Jensen Power System Engineer November 12, 2013.
A3016 and MAO test at CAEN Pigi, A. Boaino & CAEN.
LP33 Series UPS kVA 400Vac/CE
Circuit Tester Explanation How does it work? Capt. David Rifkin, Drawing 1 shows how the little circuit tester responds to.
Power distribution box XD1 top DTTF_Crate XD2 middle DTTF_Crate XD3 bottom DTTF_Crate Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 RACK S1D01.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
EE 136 Power Electronics Class Project Power Supply Handbook Chapter 11and 12 Over voltage and Under voltage Protection By Gordon Wong.
© 2011 Ericson Manufacturing, Willoughby, Ohio
POWER SUPPILES LECTURE 20.
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
How PC Power Supplies Work If there is any one component that is absolutely vital to the operation of a computer, it is the power supply. Without it, a.
September 26, 2013 xTCA work group Evaluation results from AC/DC converters for xTCA Collaboration (CERN PH-ESE-BE) Vincent Bobillier, Matteo Di Cosmo,
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
Area of Study 2: Electricity
DKTCOMEGA EDFA Product Line Jesper Broszka, Product Manager.
Electrical Installation 2
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Domestic Wiring Two wires come from the power pole to the house. The ACTIVE wire is 240 V RMS. The NEUTRAL wire is 0 V and is connected to.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
Gas Coordination Panel 24/08/2004 Flammable Gas Installation Requirements, Interlocks, etc. F.H.
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
TE-MPE-CP, RD, 09-June Enhanced Diagnostics & Supervision for Quench Heater Circuits R. Denz TE-MPE-CP.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Electricity. TYPES OF CIRCUITS Individual electrical circuits normally combine one or more resistance or load devices. The design of the automotive electrical.
DC Machine & Transformer
S A Griffiths CM42 June 2015 Electrical & Control.
A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.
Training on Power Monitoring and Management Solution
Electrical Systems Civil Engineering and Architecture
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Dependability Requirements of the LBDS and their Design Implications
What is meant by ‘Preventive Monitoring’?
T1 Electronic status Conclusions Electronics Cards:
LV Safe Powering from UPS to Clients
Electrical Systems Electrical Systems
the CERN Electrical network protection system
Smitty’s Two Minute Drill Mixed Content -05
Programmable Logic Controllers (PLCs) An Overview.
Three Phase Transformers
Electrical Safety in the Home
Engineering Project Cable Management.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Fault Tolerance Distributed Web-based Systems
EET 323 – Electrical System Design Lecture 4: Wiring Devices
ENG421 (3c) – Pipes, Valves, Pumps
Overcurrent Protection— Fuses and Circuit Breakers
EET 323 – Electrical System Design Lecture 9: Grounding
EET 323 – Electrical System Design Lecture 11: Panel-boards and Switch-boards Instructor: Radian Belu, PhD.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Modular Edge-connected data centers
Presentation transcript:

Wiener crates; An installation and power supply analysis. Magnus Bjork Be/Co/Fe

Agenda How are most crates installed? How many failures? / What goes wrong? How should the crates be installed? Redundant crates. The “quick-and-dirty fix”. Conclusions and suggestions. Questions? References & Circuit breaker curves. Wiener’s report. 2

How are most crates installed? Incorrectly, due to various constraints. – Many crates are connected to power bars in the racks, this can bring several problems! – “Swiss” plugs are rated for 10 (13) Amperes, the crate is specified for maximum 16 Amperes. – At CERN “Swiss” outlets must be protected by 30 mA ground fault breakers. = Not a good place to connect high-powered industrial crates. – If any equipment on the power bar has a short circuit, all connected equipment loses power. 3

A maximum 16A crate (or several crates) connected to a “power bar” with a single 10A breaker… 4 cPCI +-12V 20A VME +-12V 10A

Three 16A crates in this one 10A “bar”… 5

Why is this working? The 16A maximum is the absolute maximum for the crate. The actual power supply need depends on the real power consumption. To get an estimate of the actual crate power used at this instant, add all the voltages x current values read (from either the front panel or) remotely via e.g. Diamon, Web, etc. divide the sum by 0,75 (power factor for heat losses in the power supply) and add ~30 Watts. (3x8W crate ventilators +Fan tray logic.) 6

Some mathematics to see clearer. 7 VME Maximum Power 1’070W / 0,75 = 1’426W + ~30W = 1’456W ~1’500W / 230V = 6,5A cPCI Maximum Power 1’310W / 0,75 = 1’746W + ~30W = 1’776W ~1’800W / 230V = 7,8A VoltageCurrentPower , VoltageCurrentPower ,

How many failures? Out of ~530 operational units the total number of PFC failures per year were; – 2009; 20 (~3,77%) (Protection diode modification done Jul-Oct 2009.) {Ref. 2} -2010; 7 (~1,32%) -2011; 11 (~2,07%) -2012, Jan -> June; 10 (~1,88%) (Total for ALL Wiener equipment; 0,96% failures in As a comparison, with CAEN the number is 3,38%) 8

What goes wrong? Quite simply; The PFC. – The PFC seems to have some weak points… – Wieslaw Iwanski, PH/ESE-BE, did some very extensive tests. {Ref. 1} – The power supplies now have years of use, normal end-of-life for certain components may be a natural consequence of aging, but for the moment no “usual increase in failures” can confirm e-o-l approaching. – MTBF for the ventilators is specified to be 6 years, the power supplies are said to “last longer”. – It should be noted that CERN specifically requested the Active PFC and the Softstart functionality. – To protect the PFC the diode upgrade was introduced. 9

10 This diode

D20 11

D14 12

How should the crates be installed? According to the OEM specifications. – Individual 16 Ampere type “B” or “C” curve circuit breakers. – Server grade power connections, preferably approved up to 16 Amperes and not needing any 30 mA ground fault circuit breakers. – Standard Burndy 10 Amperes max connector pins are acceptable, since the real maximum input current of our power supplies is either; 6,5 Amperes (VME) or 7,8 Amperes (cPCI). – In case of a short-circuit the 10 Ampere Burndy connector pins can handle the short-term current of over 16 Amperes, then the circuit breaker reacts. 13

A good power distribution 1 {Ref.3} 14

A good power distribution 2 {Ref.3} 15

16

Redundant crates Redundant crates should ideally be fed from two separate “Canalis”power distribution rails, both “Canalis” rails should be fed from UPS power supplies. The two power supplies of a redundant crate should be fed by two different phases from the two different “Canalis”. (R, S or T) The redundant crates should have automatic monitoring of the power supplies output, to be able to alarm and / or trigger automatic events in case of failure of one power supply. 17

The “quick-and-dirty fix”… Installing a small fuse in-line with the power feed to the crate power supply may mask a part of the problem but may cause other problems later. …But it has two “advantages”; it’s fast & cheap. For now. The crates have been working in the current setup for ~5 years and they still work fine. Revising the power feed can be costly and inconvenient, but for critical racks with Wiener crates installed it is a good idea, especially when considering the cost of unscheduled LHC downtime… 18

Conclusions and suggestions 1 For critical rack(s) with Wiener crate(s) a new power distribution should be done with an individual breaker box directly to the “Canalis”. Possibly without additional connectors or with server-grade hardware. The intensity and selectivity of the individual circuit breaker; 16 Ampere, “C” curve. A switch-on delay unit is not needed unless there has been previous problems powering up the whole group of high-powered racks. The main circuit breakers should be reviewed to guarantee the selectivity. 19

Conclusions and suggestions 2 The protection diode should be installed in the power supplies, if not already done. Future power supply failures can not be excluded but secondary consequences can be greatly reduced by simply following the specifications by Wiener and ensuring a proper electrical distribution. The (Active) PFC was requested by CERN since without a power factor correction the 3:rd and 9:th order harmonics might cause problems, especially if the neutral cable is not dimensioned 1-1 with the phase conductors. 20

Conclusions and suggestions 3 The softstart was also requested by CERN and is a good (and bad) reason why the installations have survived so far. The new ELMA crates can be seen as a solution to upgrade to new hardware. …But first we must install some crates in 24/7 operational use in some easy to access area, in order to validate them “in the real world”. The ELMA CPA500 power supplies also have a PFC, “Low inrush current” and softstart. 21

Questions? 22

References {Ref. 1} Wieslaw Iwanski, PH/ESE-BE – WienerTests_v40 {Ref. 2} Paul Harwood – Wiener Diode modification.pdf {Ref. 3} LHCb 23

24

25