1 ECAL/HCAL FEB and CROC. FEB serialisers Serialiser tests GANIL Irradiation test. CROC bit flip error modifications and tests Calorimeter Detector/Electronics.

Slides:



Advertisements
Similar presentations
JET Algorithm Attila Hidvégi. Overview FIO scan in crate environment JET Algorithm –Hardware tests (on JEM 0.2) –Results and problems –Ongoing work on.
Advertisements

6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Oliver Bitterling  Introduction to the QPS  Radiation damage in electronic systems  Construction of radiation tolerant systems  Radiation test and.
A radiation-tolerant LDO voltage regulator for HEP applications F.Faccio, P.Moreira, A.Marchioro, S.Velitchko CERN.
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
A Serializer ASIC for High Speed Data Transmission in Cryogenic and HiRel Environment Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
M. Adinolfi – University of Oxford – MAPMT Workshop – Imperial College 27 June Rad-Hard qualification for the LHCb RICH L0 electronics M. Adinolfi.
TRAD, Tests & Radiations 13/09/2011 LHC POWER CONVERTER Radiation analysis.
SEE effects in deep submicron technologies F.Faccio, S.Bonacini CERN-PH/ESE SEE TWEPP2010.
The L0 Calorimeter Trigger U. Marconi On behalf of the Bologna Group CSN1, Catania 16/9/02.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
LHC Beam Loss Monitors, B.Dehning 1/15 LHC Beam loss Monitors Loss monitor specifications Radiation tolerant Electronics Ionisation chamber development.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
1 Preshower Front-End Electronics Status LHCb group, LPC Clermont OUTLINE PRODUCTION TESTS PRESERIE I PGA ISSUES: ~SOLVED PRESERIE II (…) CALORIMETER MEETING.
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
Integration and commissioning of the Pile-Up VETO.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Olivier Callot 4 July 2002 The L0 Calorimeter Trigger Basic principles Overall organization.
IB PRR PRR – IB System.
Radiation 4-5 December 2005 AB/BDI/BL.
JET Algorithm Attila Hidvégi. Overview FIO scan in crate environment JET Algorithm –Hardware tests (on JEM 0.2) –Results and problems –Some VHDL tips.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
11 JULY 2002Jacques Lefrancois1  History: Previous Montecarlo Calculations by V. Talanov I. Korolko=> about 100rads/year and about 10**9 neutrons/cm**2.
Calorimeter CROC PRR CERN Calorimeter ReadOut Card PRR Tests of the CROC Calo CROC PRR – Tuesday 19 December 06.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
Relative crate phase measurement Olivier Deschamps Jacques Lefrançois Frédéric Machefert Stéphane T'Jampens Frédéric Machefert – Calorimeter Meeting.
Serial Communications
Hongda Xu1, Yongda Cai1, Ling Du1, Datao Gong2, and Yun Chiu1
D. Breton, S. Simion February 2012
Status of the FPGA Firmware of the HF FE
Irradiation test results for SAMPA MPW1 and plans for MPW2 irradiation tests Sohail Musa Mahmood
ETD/Online Report D. Breton, U. Marconi, S. Luitz
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
AFE II Status First board under test!!.
CMS SLHC Calorimeter Trigger Upgrade,
A microTCA Based DAQ System for the CMS GEM Upgrade
Front-end digital Status
EMC Electronics and Trigger Review and Trigger Plan
Calorimeter Upgrade Meeting - News
HADES goes SIS-100* SIS-18 DAQ upgrade possibilities
VELO readout On detector electronics Off detector electronics to DAQ
LHCb calorimeter main features
Timing Analysis 11/21/2018.
University of California Los Angeles
John Harvey CERN EP/LBC July 24, 2001
Limits on damping times
Overview of the LHCb Calorimeter Electronics … focus in the ECAL/HCAL
The CMS Tracking Readout and Front End Driver Testing
The LHCb L0 Calorimeter Trigger
The LHCb Front-end Electronics System Status and Future Development
PERFORMANCE OF THE METAL RADIATION MONITORING SYSTEMS
Serial Communications
U. Marconi, D. Breton, S. Luitz
Presentation transcript:

1 ECAL/HCAL FEB and CROC. FEB serialisers Serialiser tests GANIL Irradiation test. CROC bit flip error modifications and tests Calorimeter Detector/Electronics Meeting on behalf of the LAL Group Frédéric Machefert Wednesday June 25th, 08

2 Analog Device serializer problem The present serialiser in M24 (trigger) do not accept overshoot on its input DS90CR215 (National Semiconductors) The trigger BGA outputs present such features A “protection” starts working in the DS90 The component pulls plenty of current (~1/2A) Starts to increase its temperature The component still works We may suppose it can not bear such conditions for a long time Think for a replacement Two components may suit the board requirements Texas SN65LVDS95 Fairchild FIN1215

3 Texas and Fairchild components in tests Boards have been modified to receive the Texas and Fairchild components Still large oscillations But no harmful protection The oscillation should be painless for the Fairchild part Fairchild has the preference Sampling region Signal should be stable Sampling region Signal should be stable Threshold 2V

4 At LHCb SEL are triggered indirectly by neutrons The probability to produce a sufficiently ionising fragment is low The neutron flux is large in the experiment Only some ions from the neutron-Si collisions have a deposited energy (LET) sufficient to produce a SEL The energy of the ion should be greater than 1 or 2 MeV. Maximum LET reachable is 15MeV.mg -1.cm 2 GANIL irradiation : motivations and conditions (I) Ionising fragment : SEL small probability! neutron Si LET>6MeV.mg -1.cm 2  1.5MeV.  m -1 LET max =13/15MeV.mg -1.cm 2

5 Probability to produce a fragment of energy greater than E MeV from neutron collision (1GeV) But we also know that E>2MeV Ion is N, O,..., Si GANIL irradiation : motivations and vonditions (II) (1GeV incident neutron) Supposing that all these fragments produce a SEL, the probability to trigger a SEL from a 1GeV neutron is of the order of 2x10 -6 To determine the probability to produce a sufficiently ionising fragment it is necessary to evaluate the probability per μm times the range of the ion considered and to sum up over the various ion species

6 LHCb : flux of particles in the electronics vicinity Origin : Calorimeter Origin : Interaction Pt MeV -1.cm -2 Energy (MeV) L=5x10 32 cm -2.s -1 In the region of the electronics We expect 4x10 9 incoming neutrons of more than 30MeV in a year (10 7 s) per cm 2 Less than 8000 ionising fragments (cm -2 ) capable of producing a SEL But most of them have a LET around 6 MeV.mg -1.cm 2 Just a few can reach a LET of 16 MeV.mg -1.cm 2

7 GANIL irradiation We used Krypton (70MeV/A) Deposited energy is small (a few MeV.mg -1.cm 2 ) Use an absorber (various thickness) to reach LET up to 16 MeV.mg -1.cm 2 Dose is of the order of 5krad/2x10 7 particles 16 MeV.mg -1.cm 2 Absorber : 500  m - Al

8 GANIL results Texas No SEL was observed Supposing that the LET of the fragments from neutron collision is always max. Texas was tested for more than 7500 years without SEL (a single part) ! Illustration of the power of a Krypton test at GANIL Safe radiation tolerance Fairchild Several SEL have been detected SEL rate clearly depends on the LET (threshold effect) Taking same “a priori” as for Texas A SEL every 180 years (single part) This is VERY pessimistic We may try to evaluate rate more carefully (more “realistic assumptions”)

9 Fairchild : specific study Taking into account The SEL rate dependence with respect to the LET The probability to produce ions of Various types Leading to specific LET along their path Rate goes down to 4x10 -7 SEL per year ! We may assume that Fairchild is also radiation safe ! Modelisation of the SEL cross-section SEL contributions from the various ion species

10 Calorimeter Detector/Electronics Meeting CROC Bit flip : problem The BGA cannot cope a two frequent bit flip on two many outputs BGA levels fluctuate (GND and VCC) This is not observed on the PCB (Monitored - Tried to mount huge capacitors) Application notes indicate : Inductance inside the BGA Large output buffer bit activity Vcc/GND derive ~ L. di/dt For us : Large input flip means large output flip The effect is larger if internal register activity Input is a comparator with respect V cc /2 if V CC fluctuates, may imagine duty cycle change (signal fronts are not vertical)

11 Calorimeter Detector/Electronics Meeting CROC Bit flip : solutions tried Internal activity (Spying) does not help Do we have a problem when normal LHCb functioning ? A test was planned at 1MHz in the pit : cannot be done in the present situation We tried to correct the problem by changing the firmware of the FE PGA 1) Problem is linked to the current flow in the BGA Set output in slow slew rate : slower current variations standard is fast slew rate but slow slew rate is good enough for us 2) Imposing constraints on the routing Keep internal registers away from the output buffers 3) Do NOT flip all the bits EXACTLY at the same moment Out of the 23 bits (out of the FePGA), ~8 LSB often flip Time shift for the 4 first ADC bits bits Clock 19 MSB 4 LSB  t~ 4/5ns

12 Calorimeter Detector/Electronics Meeting CROC Bit flip : tests performed At LAL Procedure 1MHz L0 triggers 8 boards in the crate Random capture of the events with CROC Spy Could not observe any single error of of several 100k L0s passed At CERN Re programming of the CROC in crate 19 (full crate) Test procedure is the same as the one at LAL Could not observe any error on ~100k L0s Still, we wish to be able to perform a 1MHz test with the “real” DAQ Crate 19 and 10 already use a “modified firmware” Have been operated for one week No ECS modification (exactly identical CROC configuration as previous firmware) Latest version will be loaded in the CROC this week

13 Calorimeter Detector/Electronics Meeting CROC GOL tuning Modifications of the CROC firmware have consequences on the timing of the bits sent to the GOL Before : After : Margin is still OK Reference or point of functioning in standard condition