Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 General.

Slides:



Advertisements
Similar presentations
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Advertisements

Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
4/28/01APS1 Test of Forward Pixel Sensors for the CMS experiment Amitava Roy Daniela Bortoletto Gino Bolla Carsten Rott Purdue University.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
2/26/2008 To : Teknisk-Naturvetenskapliga fakulteten Uppsala universitet Dekanus, Prof. Jan-Otto Carlsson Box 256 SE UPPSALA From: FAIR/NuSTAR R.
experimental platform
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.
MUON Alignment DAQ (Overview), EDR Feb Kaori Maeshima MUON Alignment DAQ (overview) Often a question is asked: Do we have a single DAQ program.
B W Kennedy, CCLRC Rutherford Appleton Laboratory VPTs for the CMS experiment B W Kennedy CCLRC Rutherford Appleton Laboratory St Petersburg, 26 April.
High spatial resolution measurement of depth-of-interaction of a PET LSO crystal Aliz Simon a László Balkay b, István Chalupa b, Gábor Kalinka a, András.
GE alignment- status, proposal N. Béni, Z.Szillási (ATOMKI, Debrecen, HU) G. Bencze, G. Endrőczi (Wigner RCP, Budapest, HU) GMM meeting 1.
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
A.Vasiliev, IHEP-Protvino 2-nd PANDA meeting in Russia, April 26-28, 2010 IHEP activity in barrel Alexander Vasiliev (IHEP-Protvino) PANDA electromagnetic.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Institute for Nuclear Research and Nuclear Energy Dimitrov L.P., Iaydjiev P.S., Mitev G.M., Vankov I.V.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
Como, Oct 20017th Conf. on Advanced Technology and Particle Physics Radiation tolerance and magnetic field behavior of CAEN HV and LV boards for.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
JRA1 PCMAG field mapping Elements of the work: Hall sensors: improvements and production Calibration of Hall sensor cards Mechanical mapping device Installation.
Fork Calibration Barrel Muon Alignment 9 April 2003, Z. Szillási Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 Calibration.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
High Energy Neutron and Proton Irradiation Facilities at TSL Alexander Prokofiev, , 6th LHC Radiation Workshop 1.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Jim Fast Pacific Northwest National Laboratory
Heating and radiological
Experimental Method: 2 independent detectors on both sides of IP
Pressure monitoring system for the CMS muon chambers
National Research Center” Kurchatov Institute”
LIU Wire Scanner Milestones June 2017
Test beam organization, schedule, requirements and installation This is no talk rather a questionnaire! Installation to T9 Preliminary schedule What do.
WP8 – Improvement and equipment of irradiation beam lines
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
Towards a Unified Environmental Monitoring,
CMS November Upgrade Week
Target and Horn status report
NA61 news and plans News from other labs/experiments
10/month is the present production rate 2 FTE + sporadic contributions
LHCf – CSN1 Trieste O. Adriani
CMS RPC Endcap RE1 Status Report
Beam Wire Scanners (PS prototype and LIU series)
Preparations for test of
Irradiation Test of the Spartan-6 Muon Port Card Mezzanine
CERN, the LHC and the Grid
ScECAL+AHCAL+TCMT Combined Beam FNAL
CMS Goal of the experiment
TMB, RAT, and ALCT Status Report
Use of Beam Loss Monitor type detectors in CNGS muon station
BLMs - Radmon – BSCs – BCMs for steering the beams in collision during the engineering run at 450 GeV Thijs Wijnands (TS/LEA), Richard Hall Wilton (TS/LEA),
Phase 2 R&D – Brief Introduction –
Experimental Method: 2 independent detectors on both sides of IP
MEG Summary T. Mori for MEG Collaboration February 9, 2005.
PERFORMANCE OF THE METAL RADIATION MONITORING SYSTEMS
East Hall under construction
Presentation transcript:

Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 General Status of the Barrel Muon Alignment Project The work is supported by The Hungarian Scientific Research Fund OTKA T , T034910, T The Barrel muon Alignment Collaboration: Institute of Nuclear Research, ATOMKI, Debrecen, Hungary European Laboratory for Particle Physics CERN, Geneva, Switzerland Institute of Experimental Physics of Debrecen University, Debrecen, Hungary Institute for High Energy Physics, Vienna, Austria

Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 2 Introduction For those who are less familiar with the project: - Rigid structures (MABs, z-bars) - Video-camera boxes (on the MABs) - LED holders (called forks, on the chambers) - Diagonal and Z LED holders (on the MABs and z-bars) - Board computers (one for each MAB) Elements of the system:

Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 3 Rigid structures (MAB, Z-bar) The manufacturer is the IMMG consortium in collaboration with HELCO (Greece). After the test of the first MAB (prototype) 6 units are to be produced by September 2003 and the rest by March MAB: The tender procedure for the production of the MABs is finished. Z-bar: The design started (H. Gerwig). It is much-much simpler than the MABs.

Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 4 Video-camera box parts Under construction. It checks the Functionality, Sensitivity of the pixels (average, sigma), Pixels with significant deviation. Sensor + driver: Lens-part: Lenses are ordered: Chamber and z: f=30mm, diam.=10mm, 600 pieces Diagonal:f=70mm, diam.=12mm, 150 pieces. Total cost: ~22 kCHF. Mechanics (holder) for both: Design to be finalized together with Hubert. Working…. Fabrication is organized (HEPHY, Vienna). 22 mm The assembly of the full quantity (~750 pieces) is ready (Debrecen, Budapest). Sensor quality control facility (Debrecen):

Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 5 LED holders Fork production: Finished (already last year). Fork calibration (8 Apr 2003): 200 (out of 1050) are calibrated. (See separate talk about the details) Fork delivery schedule: forks are already at CERN - Next 80 by 15 May Next 300 by 15 September Last 450 by 15 March 2004 Other LED holders (diagonal, z): under design (H. Gerwig).

Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 6 Fork installation and chamber calibration The chamber calibration bench is operational and performs well. About the details of the first experience see separate talk. The main problems: - handling of the feet - cabling

Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 7 Board computer status Passed a very important milestone: irradiation test (see next slides).

Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 8 Board computer irradiation test The Svedberg Laboratory (TSL), Uppsala University, Uppsala (Sweden) February 2003

Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 9 Board computer irradiation test Experimental setup: Proton beam Scintillators for rate measurement PC-104 video- camera ethernet Particle: proton+ Beam energy: 95 MeV Beam size at the board computer: about Ø10 cm

Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 10 Board computer irradiation test Experimental hall The setup Beam pipe

Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 11 Board computer irradiation test Board computer A. Kerek Royal Inst. of Technology Stockholm D. Novak ATOMKI Debrecen

Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 12 Board computer irradiation test The test to be provided: The proton fluence comparable with the expected neutron fluence for E >100keV should be reached. Proton energy: 60 – 200 MeV. (F. Faccio, M. Huhtinen, 1999) Expected fluence during 10 LHC years: At the worst region for the muon barrel Neutrons total: ~3x10 10 n/cm 2 Neutrons > 100 keV: ~6x10 9 n/cm 2

Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 13 Board computer irradiation test Run # Beam current [nA] Total dose after the run p/cm 2 /sec Total dose after the run LHC years “Beam on” Start / stop Remark a) x :50 / 22:51a) x :01 / 0:22b) x :47 / 1:02c) x a) x :40 / 1:51d) x :14 / 2:29a) x :49 / 3:06a) x :23 / 3:42a) a) good operation up to the end of the run b) picture recording stopped after the 11-th picture (after 0:02:44) c) picture recording stopped after the 22-th picture (after 0:59:59) d) PC stopped after 1:42:00 (the corresponding file was not found) Measurement, results: The board computer worked correctly again after each reboot. There was no stop at low rate beam (runs 7, 8, 9). 10 years of LHC

Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 14 Board computer irradiation test The image taken before the irradiation The image taken after the irradiation Conclusion: the tested device can be used for the project.

Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 15 The main message The last worrying unknowns in the project are answered and all of them in a positive way: 1)The board computers work in LHC environment 2)The calibration technology designed for ISR works 3)The MABs can be built without blowing up our budget.