1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.

Slides:



Advertisements
Similar presentations
The MATURA System, an overview. Matura Slide series The Matura System, an overview.
Advertisements

Sunny day, installing exterior casings on the windows.
1. Install the heat insulation on the floor. 2. Install the power film on the heat insulation. 4. Connect the thermostat and temperature sensor with power.
SUNY Canton Facilities Project Update Miscellaneous.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
GB Patent No Intnl Patent Pending - Peter deBoeck © Slick System of Plug-in Electrical Accessories The new concept in electrical wiring devices.
THE SUMMER OF CHANGE Things are happening ….. WEEK ONE.
GMP and HACCP in school restaurants Comenius School Development Project 2006/07 Srednja šola Zagorje.
Cable and Service Installation David Warner Colorado State University May 11, 2009.
Gas systems for GIF++ 14/02/2015 Ernesto Regaño 1.
㈜ D.S.T. 자료용 1. Power film Installation 1. Install the heat insulation on the floor. 2. Install the power film on the heat insulation. 4. Connect the thermostat.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
How to build a two storey house
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
The electricians have first to mark the walls so they know where to cut tracks for the conduit and the joiner fits the stud walls so first fix plumbing.
University of Toronto Mississauga Campus Capital Projects University of Toronto Mississauga Campus: Capital Projects Erindale College Council | March 9,
Finishing the Building
1 WAO (WORK AREA OUTLET) BASIC TELECOMMUNICATIONS.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
SARDAR PATEL INSTITUTE OF TECHNOLOGY, PILUDARA Rakholiya bhavdip : [ ] Gevariya balkrushn : [ ] Patel parth : [ ] ( Branch:
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
Interior Painting How to paint like a pro.. Step 1: Preparation Remove as many items from room as possible Cover any remaining furniture & floors Remove.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Engineering Review SAB Static Balancing.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
LBT Q Eng/SW Review MCSC – Mount Control System.
Work Progress Photos From 1 ST To 15 TH NOV 2015.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
Electrical Installation AMI- 17.0
1 LBT Q Eng/SW Review PWR: Site electrical power.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. Bad case of Installation RAC-B-A07.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
WIRING SYSTEM DEPARTMENT:ELECTRICAL
Tucson Amateur Astronomy Association
Francois and Lau EATM 17 July 2012
Assembly And Installation Of Ikea Kitchen Cabinets
NuMI - Shutdown – Week 9 Horn 2 Repair – Successfully Tested the Repaired RAW Leak Drained and Refilled Horn 1 and 2 RAW Systems Changed Horn 2 DI Bottle.
B245 Modifications & Cabling Update
Electrical Gas Plumbing Heating & Cooling
How to Build a House.
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
Project Design & Construction
G kitchen What makes you special!
Required tools for installation of a V-1020C speaker with V-9914 bridge.
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation

2 Highlights (Q4/2008) Installed PEPSI container on level 3L, connected power, done Installed PEPSI container on level 3L, connected power, done Designed boot for diamond plate to cable chain interface, done Designed boot for diamond plate to cable chain interface, done Working on other modifications to the pier, continues Working on other modifications to the pier, continues Just installed seal-tight conduit from kitchen to pier for solar fibers, reworked the route to cleanup holes and ceiling tiles Just installed seal-tight conduit from kitchen to pier for solar fibers, reworked the route to cleanup holes and ceiling tiles Non-UPS power has been installed at the bridge location Non-UPS power has been installed at the bridge location Oil contamination is the pier has been reduced by containing oil on upper levels and stopping leaks Oil contamination is the pier has been reduced by containing oil on upper levels and stopping leaks

3 Open Issues Technical – almost no changes Technical – almost no changes Oil drips in the pier have been reduced by controlling oil leaks and contamination at the telescope Oil drips in the pier have been reduced by controlling oil leaks and contamination at the telescope Schedule Schedule Completion before November of 2010 ? Completion before November of 2010 ? Financial Financial Cost of paint and materials Cost of paint and materials Parachute to catch and direct oil drips Parachute to catch and direct oil drips Resource Resource Identify paint and paint contractor for inside pier work Identify paint and paint contractor for inside pier work

4 Planning (2009,2010) Terminate fibers Terminate fibers Define UPS power Define UPS power Install E-net?, E-stop?, telephone? Install E-net?, E-stop?, telephone? Insulate all pipe carrying liquids Insulate all pipe carrying liquids Install plastic floor Install plastic floor Paint walls with epoxy paint Paint walls with epoxy paint