County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Great Western Corridor Feasibility Study
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
Public Open House February 6, Study Overview - Study Area South North.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
County Wide Active Transportation Study (CWATS) Master Plan Active Communities Summit – October 3, 2011.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Federal Transit Administration New Starts Project Development Process
Detroit River International Crossing (DRIC) Study 2007 Ohio Conference on Freight Toledo, Ohio September 18, 2007.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Limebank Road Environmental Assessment Study February 19, 2003.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
US 101 Corridor Plan Prepared by: Oregon Department of Transportation May 2013.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
MED SR 18 Corridor Project MED PID October 13, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Transportation System Comments Santolina Level ‘A’ Master Plan.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
Council Presentation January 2014 Lauzon Parkway Improvements Class Environmental Assessment Study County of Essex.
Transportation Master Plan Update Warden’s Forum May 7, 2015.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Jefferson County SA Red Rocks Site Approval
Public Information Centre No. 2
Value Engineering Study and Risk Assessment
Willow Meadows Civic Club Meeting September 13, 2011
Project Status & Right-of-Way Acquisition
MASTER THOROUGHFARE PLAN AND STREET DEVELOPMENT STANDARDS
NGTA Halton Planning and Public Works Committee
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Draft Transportation Element September 6, 2017
Public Information Meeting NW 100th Street Reconstruction Project
Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Department.
Construction Management & Inspection
SANDY SPRINGS CITY COUNCIL MEETING
MPO School Transportation Working Group
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Technical Committee on Geometric Design
Geometric Design: General Concept CE331 Transportation Engineering.
Design Criteria CTC 440.
Central Corridor - Light Rail Transit Metropolitan Council
MPO Board Presentation
Introduction to transportation system
Parks Highway Reconstruction: Lucas Road to Big Lake Road
2019 Capital Program Title of Presentation
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
White Flint North Entrance Feasibility Study
Presentation transcript:

County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008

2 Project Study Area

3 Environmental Assessment Requirements Proposed improvements to CR 19 and 22 are classified as a Schedule “C” project by the Municipal Class EA: –Widening where the reconstructed road… will NOT be for the same purpose, use, capacity and the same location as the facility being reconstructed This type of project is subject to the full Class EA process and requires the completion of an Environmental Study Report (ESR). Also subject to: –MTO’s Class EA for Provincial Transportation Facilities for a Group “B” (major) project (Highway 401 interchange) –Canadian Environmental Assessment Act (triggered by funding and Federal approvals)

4

5 Major EA & Preliminary Design Components Transportation Needs Assessment (EWRTMP Transportation Master Plan) identified operational, geometric and capacity deficiencies in both corridors Analysis of environmental conditions potentially affected by improvements – cultural, natural and socio-economic environment Identification and evaluation of alternatives, including: –“Alternatives to” and alternative solutions: “do nothing”, reduce transportation demand, change land use planning/urban design principles, localized intersection improvements, new/improved Provincial/Municipal transportation facilities –improvements to CR 19 and 22 chosen as preferred transportation solution –solution developed to functional design level of detail and presented at May 2007 PIC 1 –Preliminary Design alternatives and recommended design presented at November 2007 PIC 2 –changes to recommended design of CR 22/Lesperance Road intersection and drainage modifications presented at July 2008 PIC 3 Extensive Public and Agency Consultation program, including three PIC’s, recorded attendance of more than 400 agencies, residents, property and business owners

6 Road and Interchange Concepts Concepts reflect site specific conditions of project area: –Alternatives included: widen from centreline (use existing ROW to minimize impacts); widen to right or left; or combination –Provincial Highway to regional roadway connections at Highway 3 and at Highway 401 –High traffic volumes on CR 19 and CR 22 –Developing urban area north of CR 42 –Need to provide access to existing/future commercial development –ROW constrained by existing development and municipal drains

7 Preliminary Design Alternatives Preliminary Design alternatives developed for CR 19 and CR 22 improvements based on: –Current MTO standards as defined in the Geometric Design Standards of Ontario Highways (GDSOH) –Transportation Association of Canada Geometric Design Guides for Canadian Roads (TAC) –Rural arterial roadway standards from Highway 3 to CR 42; urban arterial standards, north of CR 42 –Transportation needs as identified in the Transportation Needs Assessment prepared for this project –Environmental constraints –Public and agency input Factors used to evaluate the alternatives reflect the “full scope of the environment” and include: –Traffic operations and safety –Technical engineering considerations –Impacts on the cultural, natural and socio-economic environment –Existing and future land uses –Costs

8 Evaluation Criteria for Alternatives Safety/Design –Highway/road safety, including ability to deal with access/traffic conflicts, weaving/merging conflicts –Traffic impacts, including impacts during construction –Ability to accommodate alternative modes (bicycles, pedestrians) –Changes in residential/business access Traffic Operations –Meet current and future traffic needs –Movements at major intersections (CR 19/22, CR 22/Lesperance) Environmental Impacts –Significant impacts that cannot be mitigated –St. Anne’s Cemetery –Built Heritage Cultural Landscapes Drainage Impacts –Impacts on urban and rural drainage systems Existing and Future Land Uses –Existing residential uses and neighbourhoods –Traffic impacts on residential neighbourhoods –Existing commercial uses –Future land uses – lands designated “General Commercial” and “Business Park” –Existing light industrial uses –“Collector” Road Function of Lesperance Road –Long Term Land Use Planning Impacts Construction Cost Provincial, County and Local Municipal Policies –Compatible with policies, Official Plans

9 Recommended Improvements 4-lane rural cross section on CR 19 from Highway 3 to south of CR 42 4-lane urban cross section on CR 19 from south of CR 42 to VIA Rail crossing 6-lane controlled access highway on CR 22 2-lane Roundabout at CR 19 and CR 34 New underpass and ramp reconstruction at Highway 401 Pike Creek Bridge widening to 4 lanes Grade-separation of CPR crossing on CR 19 Single Point Urban Interchange at CR 19/CR 22 Partial interchange (half diamond/button hook) at CR 22 and Lesperance Road with improved road connections to Sylvestre Drive and Westlake Drive

10 Roundabout at CR 19 and CR 34

11 Highway 401 Underpass at CR 19

12 Grade Separation at CPR Crossing

13 Single Point Urban Interchange at CR 19/22

14 Half Diamond/Button Hook Interchange at CR22/Lesperance

15 Environmental Study/ Preliminary Design Report (ESR/PDR) ESR/PDR has been prepared for MTO, County, Tecumseh and Lakeshore review Following County presentation, presentations will be made to Lakeshore and Tecumseh Councils (November 12, 2008) ESR/PDR will be finalized and placed on “public record” for public and agency review (November 18, 2008 to January 5, 2009) Notice of Completion, placed in local newspapers and mailed to residents/businesses, will advertise availability of ESR/PDR for review Assuming that concerns raised during the review period can be resolved, the project will be considered to have met the requirements of the Class EA and Detailed Design can be scheduled subject to available funding Copies of the ESR/PDR will be available for review and will be posted on the County of Essex website

16 Project Cost and Next Steps Based on preliminary estimates, the capital construction cost is anticipated to range from $180 to $200 million (2008 dollars) Construction is subject to funding, approvals and property acquisitions Construction phasing will generally be completed from north to south and coordinated with other area projects

17 Construction Phasing Phase 1 ( 2 Years) Phase 2 ( 1 Year ) Phase 3 (1.5 Years) Phase 4 (2 Years) Phase 5 (1 Year)