Thank You Contact Information: Rodrigo Castilho AECOM 1333 Broadway St., Suite 800 Oakland CA, Phone:

Slides:



Advertisements
Similar presentations
FHWA Guidance & Policies on Traffic Analysis James P. McCarthy, PE, PTOE Federal Highway Administration
Advertisements

A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
NCFRP 04: Identifying and Using Low-Cost and Quickly Implementable Ways to Address Freight System Mobility Constraints Presenter: Joan Yim (CH2MHill) Project.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
How Do Traffic Control Measures Affect Vehicle Gas Emissions Presented by: Ryan O’Connell Co-Authors: Kevin Lu Dr. Wen Cheng Dr. Xudong Jia.
PLANT SIMULATION WAREHOUSING & LOGISTICS LIBRARY CASE STUDIES Auke Nieuwenhuis MSc October 2012.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Capacity Planning and Queuing Models.
Chapter 15 Application of Computer Simulation and Modeling.
Chapter 221 Chapter 22: Fundamentals of Signal Timing: Actuated Signals Explain terms related to actuated signals Explain why and where actuated signals.
Chapter 5 Aggregate Planning Operations Analysis Using MS Excel.
14-1. Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 14 Capacity Planning and Queuing Models.
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Chapter 10 – Facility Layout
Automatic loading of inputs for Real Time Evacuation Scenario Simulations: evaluation using mesoscopic models Josep M. Aymamí 15th TRB National Transportation.
HOW DO YOU DESCRIBE A CONTAINERPORT? Henry S. Marcus Massachusetts Institute of Technology.
Optimizing the Placement of Chemical and Biological Agent Sensors Daniel L. Schafer Thomas Jefferson High School for Science and Technology Defense Threat.
Truck set-up scheduling for the Elgin, IL facility Vijay Viswanathan, Graduate Student Dr. Jaejin Jang, Associate Professor Department of Industrial Engineering.
DEPLOYMENT IN SINGAPORE The problem of location that comes with this type of terminal, since: the port in question will be able to receive large vessels,
From Use Cases to Test Cases 1. A Tester’s Perspective  Without use cases testers will approach the system to be tested as a “black box”. “What, exactly,
Chapter 20: Actuated Signal Control and Detection
© Wiley 2007 Chapter 10 Facility Layout. © Wiley 2007 OUTLINE What Is Layout Planning? Types of Layouts Designing Process Layouts Special Cases of Process.
Generated Trips and their Implications for Transport Modelling using EMME/2 Marwan AL-Azzawi Senior Transport Planner PDC Consultants, UK Also at Napier.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
ANASOFT VIATUS. Challenges Supply chain optimization is necessary for achieving competitive price of final products Synchronization and utilization of.
Port of Everett MASTER PLAN UPDATE April 8, 2008.
Case Study 4 New York State Alternate Route 7 Problem 2.
Modeling the Optimization of a Toll Booth Plaza By Liam Connell, Erin Hoover and Zach Schutzman Figure 1. Plot of k values and outputs from Erlang’s Formula.
Dr. Gerry Firmansyah CID Business Continuity and Disaster Recovery Planning for IT (W-XIV)
INTRODUCTION TO TRAFFIC ENGINEERING. of roads, streets and highways, their networks and terminals, abutting lands, and relationships with other modes.
Prof.V.M.Mohamed Ali.  Is a facility where cargo containers are transhipped.  The transshipment may be between container ships and land vehicles. 
Manufacturing Simulation Case Studies
CE 3372 Water Systems design
Red Line Customer Capacity Update
Intermodal Supply Chain Optimization at a Large Retailer Part 1: Model Development Scott J. Mason, Ph.D. Fluor Endowed Chair in Supply Chain Optimization.
Downtown Valdosta Truck Traffic Mitigation Study
RPS Modeling Results Second Round
Case Study 4 New York State Alternate Route 7 Problem 4
MOVA Traffic Signal Control Trial
Fundamentals of Cellular Networks (Part IV)
Evaluation and Re-Design Haifa and Yafa Streets.
NGTA Halton Planning and Public Works Committee
School travel planning an engineer will love
1st November, 2016 Transport Modelling – Developing a better understanding of Short Lived Events Marcel Pooke – Operational Modelling & Visualisation Manager.
Estimating the Traffic Flow Impact of Pedestrians With Limited Data
12th TRB National Planning Application Conference Xiaobo Liu, Ph.D.
Alameda Corridor CEE 587 March 30, 2011
Analyzing Security and Energy Tradeoffs in Autonomic Capacity Management Wei Wu.
System Control based Renewable Energy Resources in Smart Grid Consumer
Switching Techniques In large networks there might be multiple paths linking sender and receiver. Information may be switched as it travels through various.
Manufacturing system design (MSD)
Applied Technology and Traffic Analysis Program(ATTAP) MIDCAP & MUID
GIS Day Site Layout Optimization Using GIS Sulyn Gomez Mohd Samrah
Tasnim Rabee’ Nagham Dmaidi
School travel planning an engineer will love
FACILITY LAYOUT Facility layout means:
PORT OF EVERETT MARINE TERMINALS MASTER PLAN UPDATE
MATS Quantitative Methods Dr Huw Owens
Switching Techniques.
   Storage Space Allocation at Marine Container Terminals Using Ant-based Control by Omor Sharif and Nathan Huynh Session 677: Innovations in intermodal.
Problem 5: Network Simulation
Queuing Models and Capacity Planning
A Computerized Planning Genius Reports & Functionality
Acton Extension Update
Recommended Methods for Assessing VMT
DESIGN OF EXPERIMENTS by R. C. Baker
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
Chapter 5 Process Analysis.
Module 6 A 21st Century Transportation Network
Presentation transcript:

Thank You Contact Information: Rodrigo Castilho AECOM 1333 Broadway St., Suite 800 Oakland CA, Phone: Web:

Overview Project site: DP World Vancouver’s Centerm Facility Key Challenge: Project how the facility will perform at more than twice today’s volume Highlights of berth and gate simulation analysis Simulation analysis of future operation at capacity: “stress analysis” of peak loadings: –Berth –Gate –Container Yard –Intermodal Yard Conclusions 2

3 Project site: DP World Vancouver Centerm facility

4 Preliminary Future Terminal Plan N

Goals: –Determine if the relatively modest (by modern standards) future berth length will be able to accommodate the target future terminal volumes –Sensitivity analysis to main parameters Conclusions: –Overall, Centerm will not be limited by berth capacity –Worst-case scenarios, some but not excessive vessel queuing –If necessary, Centerm can mitigate queuing by increasing the crane assignment per call, or purchasing an additional crane 5 Berth Analysis Highlights

Goals: –Validate proposed gate design and modifications if necessary –Determine whether off-site roadway improvements are necessary (e.g. overpass to separate road and rail) Conclusions: –Initial proposed design was found to be imbalanced. Lanes were added at key stages based on model results –Recommended increasing automatic data transfer with appointments to minimize remote clerk interaction time –Separation of road and rail traffic with an overpass will help to reduce truck queuing on busy downtown Vancouver roadways, especially at future volumes. 6 Gate Analysis Highlights

7 Gentry snapshot Pre- Entry Main Entry Pin Unlock Stations Pre- Exit Main Exit

8 Example Gate Simulation Street Queue Length Charts Above: Peak day queuing with no rail interference Below: Worst-Case scenario with rail blockages during the busiest hours on peak days

Analyze how the terminal performs under peak loadings Determine if a fixed level of container yard equipment (RTGs and Top-Picks) will be able to serve quay cranes and IYRMGS sufficiently well to achieve target productivities Determine if street trucks can be served sufficiently quickly by CY equipment during busy rail and vessel days 9 Terminal Simulation Goals

CY Capacity (RTGs especially) is the Primary Limiting Factor on Productivity 10 Container Yard (RTGs and top-picks) Intermodal Yard (RMGs) Gate Wharf (Quay Cranes) Tractors Street Trucks

General Marine Terminal Simulation (GMTS) Inputs Terminal layout –Storage blocks –Tractor travel direction Peak shift load –Vessel –Gate –Rail Equipment performance specs (hoist speed, pick/set times etc.) Amount of equipment in use Outputs Net equipment productivity –Dock cranes –Yard cranes –IY cranes Work cycle detail (lifting, moving, idle etc.) Street truck service time (not including gate process) Street truck population Moves completed 11

GMTS run of a future Centerm operation 12

First, consider the worst-case scenario peak shift loading: –Two vessels at berth with all dock cranes in operation –All IY RMGs in operation –A busy weekday gate day within the busy season What happens? Unsurprisingly, quay crane and IYRMG target productivities were not met, and street truck turn times were above DPWV’s acceptable standard However, results were not “catastrophically” bad; the terminal was able to operate under these conditions, but not at desired levels 13 Initial Terminal Performance Analysis Procedure

The busiest potential shift (MaxMax below) is a rare occurrence far above a mean day shift Different aspects of the terminal may peak in various combinations, either naturally or through strategically shifting gate or rail activity, as delineated below: 14 Alternative Cases: Peak Loading Combinations Combination Max Vessel Max Rail Max Gate No Gate No Vessel No Rail Mean PeakMax Quay cranes IY RMGs Gate (% of Max Peak) 75% 100%- 90%100% % of Mean Shift CY Moves 220%210%200%180%150%200%180%260%

15 Comparative Results

Extended gate hours More uniform gate appointments Advanced re-handling for gate imports Optimized container yard load balance (i.e. all RTGs are top-picks are equally stressed, rather than concentrating work) If necessary, add container yard equipment 16 Other Strategies to Address Peak Conditions

17 Impact of Alternative Tactics vs. Mean Peak Case

18 Productivity corresponds strongly to total CY moves

Overall, the terminal will be able to perform well during most peak situations Rare, unavoidable extremely busy days may pose a challenge, but operator can work around them, and actively prevent them from occurring Off-terminal infrastructure needs also have to be considered in advance Robust IT systems are critical to enable congestion mitigation techniques to be enacted (e.g. appointment systems, TOS optimized for advanced re-handling) 19 Conclusions

Thank You Contact Information: Rodrigo Castilho AECOM 300 Lakeside Dr. Suite 400 Oakland CA, Web: