19-May-2015-cesg-1 CESG Spring 2015: Project Schedule & Resources.

Slides:



Advertisements
Similar presentations
1 24 April 2009 SMWG SMWG Closing Report Colorado Springs, Colorado, USA 24 April 2009.
Advertisements

30-March-2015-cesg-1 Martin Suess (AD) Rick Barton (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Athens, GreeceApril 08-13, Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
31 st October – 4 th November 2011 Fall 2011 Meeting Agenda Boulder, Colorado, USA SOIS Application Support Services WG Conclusions & Actions.
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
Cesg-1 CSS Area Report -- Super BOF Background From A. Hooke to CESG: (CSS AD emphasis ) Date: Fri 02 Oct 2009 To: CESG cc: CMC Subject: Proposed.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
IPR WG REPORT November Information Packaging and Registries WG REPORT November 2004.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
ESA UNCLASSIFIED – For Official Use CCSDS SOIS Overview - Fall 2015 Martin Suess 07/10/2015.
SEA-1 20 Nov 2014 CCSDS System Engineering Area (SEA): System Architecture WG (SAWG) Restart Peter Shames, SEA AD 20 Nov 2014.
CCSDS Reference Architecture Notes from SAWG discussion & from SEA Report to CESG/CMC 12 & 17 Nov 2014.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Data Archive Ingest WG Report to MOIMS Plenary May 14, 2004.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan April, 2009 Colorado Springs, CO, USA Takahiro Yamada, JAXA/ISAS.
CSA WG Meeting 17 May 2011 Page 1 Berlin, Germany CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
CMC meeting, 23 October, 2008 Page 1 JAXA CCSDS Status October, 2008 CMC Meeting DIN, Berlin, Germany Kaneaki Narita JAXA CCSDS Secretary Office.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
ESA UNCLASSIFIED – For Official Use Cleveland, OH, USA 04-08Apr16 Mario Merri, ESA/ESOC Brigitte Behal, CNES MOIMS Opening Plenary.
10-Dec-2012-cesg-1 IOAG-17d telecon 19th Nov 2013 CCSDS Engineering Steering Group (CESG) Report to the IOAG.
25-October-2016-cesg-1 CESG Fall 2016 MEETING STATISTICS.
CNES: CCSDS - MOIMS Area Data Archive ingestion WG Information Packaging and Registry WG CNES Report on activity May-October 2004 Toulouse meeting.
Wireless WG Monthly Teleconference
The CCSDS Security WG is chartered to:
SOIS Area Report Wireless WG Primary Objectives for the fall meeting
Security WG: Status Briefing
Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
JAXA CCSDS Secretary Office
AND INFORMATION MANAGEMENT SERVICES
[Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)
DAI Working Group Report David Giaretta (WG Chair)
CCSDS Systems Engineering Area: Security Working Group
Joint CMC-CESG Meeting
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACE INTERNETWORKING SERVICES (SIS) AREA
Transition Implementation Status Reporting
Systems Architecture WG: Charter and Work Plan
CCSDS Reference Architecture
Cross Support Architecture WG: Charter and Work Plan
SOIS-APP Working Group Report Jonathan Wilmot (WG Chair)
AND INFORMATION MANAGEMENT SERVICES
Recommended CCSDS actions in response to IOAG-11
Wireless WG Monthly Teleconference
Wireless WG Monthly Teleconference
Security WG: Report of the Fall 2013 Meeting
CCSDS System Engineering
SLS AREA REPORT November 2004 November 2004.
CWE File Structure.
Delta-DOR WG: Report of the Fall 2010 Meeting
Joint IPR/DAI Workshop
ROAD MAP OF THE CCSDS ARCHITECTURE WORKING GROUP (AWG)
Atlanta, Georgia, USA, 16 September 2005
SPACECRAFT ONBOARD INTERFACES SERVICES
Wireless WG Monthly Teleconference
The Hague, Netherlands 06Nov17 Brigitte Behal, CNES Mario Merri, ESA
SPACECRAFT ONBOARD INTERFACES SERVICES
JAXA CCSDS Secretary Office
CCSDS Liaison Consultative Committee on Space Data Systems
NIMAC “Spring Training” for State Coordinators
Presentation transcript:

19-May-2015-cesg-1 CESG Spring 2015: Project Schedule & Resources

19-May-2015-cesg-2 Project Schedule Schedule was reviewed in all WGs CWE is still not ready WG Chairs can not update the schedules until the “go-ahead” is received from Brian Oliver There exists 3 Project types Approved (by the CMC with resources granted. It may be that Prototype 2 resources are still missing for some approved Projects) Pending (a poll for CMC Project approval is on-going) Draft (Project not approved. Draft Projects will encompass medium and long term planned Projects covering the currently approved CCSDS on-line Strategy Plan) The current CWE Management Framework contains 3 views under the "Projects" section View Existing Projects (Approved & Pending) 90 Projects (88 Approved, 2 Pending) 54 BBs, 20 GBs, 13 MBs, 1 OB View Draft Projects 19 Draft Projects View Closed WG Projects (it shall be "all" and not closed)

19-May-2015-cesg-3 Proposed Way Forward Secretariat is finding issues to define the new agreed Project status “Draft” Action due date = 31 st Dec 2014 In order to alleviate the situation the following proposal is suggested: - Step 1 - WGs issued resolutions to approve needed Projects in "pending" status - Remaining "pending" Projects will change status, from "pending" to "drafts". Completion dates and resources might be deleted. - Step 2 - WGs Chairs will include the future Projects addressed in the Strategy Plan. A WG chair will be able to create a draft project by inserting the title, description. He can leave all the completion dates empty. He only saves the Project as Draft. - Update Charter if needed - Step 3 - Once WG Chair wants to activate the Project for approval, she/he has to complete all the dates before submitting the Project for CMC approval. There will be a checkbox on the page that says “Click here to set submit for CMC Poll Approval, and make sure you have provided dates and resources or your project will be set back to “Draft” status". Assumptions A Project in Draft status is not considered an open Project. CCSDS only works based on the list of "approved" Projects RESOURCE UNIT : wm (work month) DONE

19-May-2015-cesg-4 LACK OF RESOURCES IN THE SHORT TERM CESG needs to solve urgently the challenges of the present CESG proposes to place an action upon the CMC to deploy necessary resources during CCSDS Ref Architecture1.5 FTEs CCSDS Ontology2+ FTEs RASDS 5 year review1-2 FTEs MOIMS SM&C Zero MQ binding: 1 Prototype missing6 mm MOIMS DAI WG – NASA resources?? CCS CSTS MD:Prototype User Role (NASA resources ? 1-2 mm) IOAG Dec 15 CSS CSTS TD: Prototypes Provider and User Role Total 6 mm IOAG Dec 20 CSS SM Planning Data: Prototype 1 and 2 : Total 6 mm CSS Generic File Transfer: Prototype 1 and 2: Total 4 mm IOAG Dec15 Trajectory Prediction Data Format: Proto 1 and 2 Total 2 mm Service Request / Package Data Formats: Proto 2 Total 6 mm Service Agreement / Config Profile Data Formats Total 24 mm SIS Bundle Sec / CGR / NW management: Extra 6 mm IOAG End 17/18/19 SOIS EDS GB / BB SOIS Subnet WG Books 5 year review ca. 2 FTEs Old request No a lot of resources from CMC

19-May-2015-cesg-5 Approved Project Resources: Current Status

19-May-2015-cesg-6 Missing Resources in Approved Project (14) SEA Security WG Completion Date Symmetric Key ManagementPrototype 1 and 2 March 17 MOIMS DAI WG DEDSL XML Schema Prototype 2 March 16 MOIMS NAV WG ADM 5 year reviewPrototype 2 March 17 Hardware MessagePrototype 2 April 17 Pointing Request MessagePrototype 2 August 17 Spacecraft Maneuver MessagePrototype 2 January17 MOIMS SM&C WG http transport and XML encodingPrototype 2 Dec 16 Data Product Distribution ServicesPrototype 2 Dec 17 TCP/IP Transport and Binary encodingPrototype 2 Dec 16 Zero MQ transport and binary encodingPrototype 2 Dec 16 MOIMS Telerobotics WG Telerobotics BBPrototype 2 Apr 16 SLS Space Data Link Security Protocol WG Extended ProceduresPrototype 2 Feb 17 SIS DTN WG Bundle Security ProtocolPrototype 2 Dec 18

19-May-2015-cesg-7 Project Resources: Current Status

19-May-2015-cesg-8 Project Resources: SEA Status

19-May-2015-cesg-9 Project Resources: MOIMS Status

19-May-2015-cesg-10 Project Resources: CSS Status

19-May-2015-cesg-11 Project Resources: SOIS Status

19-May-2015-cesg-12 Project Resources: SLS Status

19-May-2015-cesg-13 Project Resources: SIS Status

19-May-2015-cesg-14 Missing Resources in “to be Approved” Projects SEA RASDS cartoon + 5 year review SEA XML guideline SEA CCSDS Ontology CSS File Transfer MOIMS MP&S WG books SOIS Subnetwork 5 year reviews