Z556 Systems Analysis & Design Session 13 ILS Z556 1.

Slides:



Advertisements
Similar presentations
Modern Systems Analyst and as a Project Manager
Advertisements

Introduction to Systems Development and Systems Analysis
HCI SEMESTER PROJECT PROJECTS  Project #2 (due 2/20)  Find an interface that can be improved  Interview potential clients  Identify an HCI concept.
Chapter 2 The Analyst as a Project Manager
1 Proposal Defining The Purpose Preparation Components of Proposals.
Ch 4 The Process page 1CS 368 Building Software is Difficult often delivered late often over budget always with errors must be a custom solution complexity.
The Proposal. Project Proposals Genesis of Proposals: They can result for formal requests (e.g. Request For Proposal, RFP) They can be unsolicited (e.g.
The Analyst as a Project Manager
Session 7 Page 11 ECE361 Engineering Practice Brainstorming, Trades, Evaluation, and Conceptual Capture.
Concept Analysis Document Executive Summary Template, (To view template instructions – Save this template to project files, reopen and then select View,
Basic Concepts The Unified Modeling Language (UML) SYSC System Analysis and Design.
L545 Systems Analysis & Design Week 4: September 23, 2008.
CISB594 – Business Intelligence
Higher Computing Software Development. Software Development Process There are 7 main stages involved in developing a new software program: Analysis Design.
Software Engineering Management Lecture 1 The Software Process.
Module 4: Systems Development Chapter 12: (IS) Project Management.
Computers Are Your Future © 2008 Prentice Hall, Inc.
Latifa AlAbdlkarim King Saud University October,2009.
1 CS Tutorial 5 Frid. Oct 23, 2009 Design Document Tutorial.
Senior Design II proposal A step-by-Step review. What is Senior Design?  Senior Design is a sequence of two courses during two consecutive semesters.
Z556 Systems Analysis & Design Session 13 ILS Z556 1.
Z556 Systems Analysis & Design Session 10 ILS Z556 1.
The Foundation Degree Project Geoff Leese September 2008.
S556 Systems Analysis & Design Week 14: December 2, 2008.
Requirements Analysis
Technical Report Outline Title Page Frontispiece Abstract Table of Contents List of Figures/ List of Tables.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
MT 340 Unit #7 Seminar Dr. Donald Wilson Agenda: Unit #7 Organization Culture Unit #8 HR Practices & Diversity Unit #8 Compiled Final Project Unit #9 The.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
Project Workflow.
SDLC and Related Methodologies
Systems Analysis and Design
Everything You Wanted to Know- But Were Afraid to Ask
Business System Development
Software Engineering Management
Fundamentals of Information Systems, Sixth Edition
Systems Analysis and Design in a Changing World, 4th Edition
Chapter 12 Instructional Project Management: Managing Instructional Design Projects on Site and at a Distance Brenda C Litchfield.
ECE361 Engineering Practice
Proposals and Progress Reports
HR0277 Change, Work and Diversity
Now it’s time to write the conclusion paragraph for the recommendation
Systems Analysis and Design in a Changing World, 6th Edition
Managing Organizational Change
Managing Organizational Change
COMP 350: Object Oriented Analysis and Design Lecture 2
BSA 376 Competitive Success/snaptutorial.com
BSA 411 Competitive Success/snaptutorial.com
BIS 320 NERD Perfect Education/ bis320nerd.com.
BSA 376 Education for Service/snaptutorial.com
BSA 411 Education for Service/snaptutorial.com
BSA 376 Teaching Effectively-- snaptutorial.com
Forging the Innovation Generation
Gathering Systems Requirements
2/18/2019 E-commerce Project Minpeng Zhu.
System Analysis and Design
2/25/2019 E-commerce Project Minpeng Zhu.
SDLC and Related Methodologies
CIS 4328 – Senior Project 2 And CEN Engineering of Software 2
Integrating History and Social Science
Gathering Systems Requirements
TECHNICAL COMMUNICATION SKILLS
Applied Software Project Management
Agile software development
Joint Application Development (JAD)
Software Requirements
Software Requirements
Simulation-driven Enterprise Modelling: WHY ?
Presentation transcript:

Z556 Systems Analysis & Design Session 13 ILS Z556 1

Final Project Presentation minutes each Every member of the team should be involved Follow the outline of the final document, but include a report on feedback from the client/users You are welcome to invite your clients ILS Z556 2

Final Specification Document The deadline is 5pm on Wednesday, April 29. Your team needs to submit both a hard copy and an electronic copy to CanvasCanvas ILS Z556 3

Tips for Writing the Final Specification Document Executive summary should be a separate document can use the drafts you’ve previously submitted for this semester Should include work models in the documents & explain these models in the text. If models are peripheral or too much details to be included in the text (in other words, that would distract the readers from seeing the problems/current situation, include them in Appendices (but make sure to point them in the text). ILS Z556 4

Tips for Writing the Final Specification Document Include data you’ve collected to demonstrate current problems (e.g., quotes and examples) in order to either demonstrate the problems or justify the salutation (or both) Data collection methods can be included in the appendix if the client request it Conclusion in the final specification document should encourage the client to pursue the solutions you suggested ILS Z556 5

Design Ideas (Verganti, 2006) Functionality vs. form Design change the experience though $ a piece ILS Z556 6 Verganti, R. (2006). Innovating through design. Harvard Business Review. 84(12),

Exeprience Design vs. Interface Design (Buxton, 2007) Even $520 a piece The “difference did not come by accident” ILS Z556 7

Organizational Change Designing information systems for end users is as much about changing the behavior of users as it is about the technology itself (Regan & O’Connor, 1994) ILS Z556 8

Planned Organizational Change Information analysts needs to be technical experts as well as effective change agents Planned change has both: a technical and a social aspect ILS Z556 9

ERP Implementation Gone Terribly Wrong (Krotov, et al., 2011) What did Natural Springs right? What did Natural Springs wrong? ILS Z556 10

Business Analyst Manifesto (Brandenburg, 2010) Out of chaos, we create order Out of disagreement, we create alignment Out of ambiguity, we create clarity But most of all, we create positive change for the organizations we serve ILS Z Brandenburg, L. (2010). How to start a business analyst career: A roadmap to start An IT career in business analysis or find entry-level business analyst jobs. CreateSpace.

The 10 Golden Rules of Systems Analysis (Gibson, et al., 2007) Rule 1: there always a client Rule 2: your client does not understand his/her own problem Rule 3: the original problem statement is too specific: you must generalize the problem to give it contextual integrity Rule 4: the client does not understand the concept of the index of performance ILS Z556 12

The 10 Golden Rules of Systems Analysis (Gibson, et al., 2007) Rule 5: you are the analyst, not the decision-maker Rule 6: meet the time deadline and the cost budget Rule 7: take a goal-centered approach to the problem, not a technology-centered or chronological approach Rule 8: nonusers must be considered in the analysis and in the final recommendations Rule 9: the universal computer model is a fantasy Rule 10: the role of decision-maker in public systems is often a confused one ILS Z556 13

Agile Agile – based on the 12 original principle: Agile ManifestoAgile Manifesto ILS Z556 14

Understanding Resistance to Change Social uncertainty Limited perspectives Lack of understanding Resistance to technical personnel Perception that costs outweigh benefits Fear of failure or inadequacy Loss of control Feelings of insecurity Threat of economic loss ILS Z556 15

Overcoming Resistance to Change (HWW, Ch 16) Water drop method Make your project visible ROI Defining requirements Time to code Customer response Develop success stories ILS Z556 16

Adoption Adopter (Rogers, 1995; 2003) ILS Z Innovators Early adopters Early majority Late majority Laggards

Adoption Adopter stage (Dormant, 1986) Awareness Self concern Mental tryout Hands on trial Adoption ILS Z Air-car by Tata Motors

Being A System Analyst Solve business problems Work models Final specification document Manage projects/teams Communicate solutions to programmers UML Flow model ~= use case diagram Sequence model ~= activity diagram ER diagram ~= class diagram ILS Z556 19

Question: What would be your reaction if you revisited the organization 3 years from now and found out that the organization followed exactly what you had suggested in this class? ILS Z556 20

Lessons learned? Are there any lessons learned in this class that you’d like to share? ILS Z556 21

Evaluation Team member evaluation Course evaluation ILS Z556 22