Royal Plaza Hotel Collapse Thailand Group 24. Summary on Collapse Collapsed on Fri 13th August 1993 in less than 10 seconds 379 people in the Hotel were.

Slides:



Advertisements
Similar presentations
Performance of buildings in the February 2011 Christchurch Earthquake Associate Prof Rajesh Dhakal University of Canterbury Christchurch, NZ Sixth International.
Advertisements

An-Najah National University
MNM Fatal Falling Material Accident Falling Material Accident August 17, 2012 (Florida) August 17, 2012 (Florida) Victim Recovered September 4,
The Hyatt Regency walkway collapse
“It’s All Fun and Games Until the Parking Garage Collapses” CASE STUDY: 2003 Tropicana Casino Parking Garage Collapse.
Mechanics of materials ** progressive collapse **  The term progressive collapse is defined as the collapse of all or a.
Liquefaction, Kobe Earthquake Matt Greaves, Tom Baker.
CEA UNIT 3 TERMS & DEFINITIONS. BEAM A structural member, usually horizontal, that carries a load that is applied transverse to its length.
Structural Reliability Theory
Structural Reliability Analysis – Basics
Chapter 33 Foundation Systems.
THIS IS WITH Carlin Bright Purpose Types of Foundations WallsMiscellaneousPast Units
 Key Learning ◦ Various shaped objects offer different strengths.  Unit Essential Question ◦ Why is it important to know the strengths of various shaped.
UTAH COAL MINE COLLAPSE By Iona Evans & Jonathan Price.
Reinforced Concrete Design II
Temporary Works.
Office of Research and Engineering Finite Element Analysis Carl R. Schultheisz.
Teacher: Mark Casto Lab Assignment: Progressive Collapse of RC Structures Principal Investigator: Mehrdad Sasani.
By George C. Lee University at Buffalo
Reliability Analysis Procedures for Infrastructure Facilities Andrzej S. Nowak University of Nebraska - Lincoln Outline  Causes of Uncertainty  Load.
Lecture 2 - Fundamentals. Lecture Goals Design Process Limit states Design Philosophy Loading.
Chapter 4 Lesson Goal After completing this lesson, the student shall be able to understand the effects of fire on common building materials and be able.
BEHAVIOUR OF MATERIALS
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
Building Fun You will have 30 minutes to build the strongest structures you can with only the materials you are provided with. Explain to the class the.
Greg Blatt Penn State Architectural Engineering Construction Management April 12, 2004.
The Schoharie Creek Thruway bridge collapse
Steps in Foundation Engineering Understand project and site Develop design criteria Identify possible foundation alternatives Conduct soil investigation.
Reliability-Based Design Methods of Structures
L’Ambiance Collapse Group 15 David Lawlor Emma Quinn Daniel O’Sullivan Cian O’Sullivan.
The Point Pleasant Bridge Disaster The Collapse of “Silver Bridge”
Learning Objective 1 Explain the hazards related to building construction.
Name of the course :Building construction Course code :HED 228 Credit hours :3hours Prepared by Eng. Nadir Abd alrazig siddig.
Safe Working Procedure - Excavations Learning Objectives:
The Royal Plaza Hotel Collapse. Background on Collapse  Collapsed Friday 13 th August 1993 at 10:10 a.m.  The collapse took less than 10 seconds! 
Forging new generations of engineers. Factors of Design and Safety.
Kansas DOT Research Project Implementation Presented By Rick Kreider (Chief of Research) Created By Susan Barker (T 2 Engineer)
Claudia Pérez Laura Rendeiro
Kansas City Hyatt Regency Walkway Collapse By: Ian Thompson Stephen Conlon David Martin Laura Devane.
Structural Loads.
GLE/CEE 330: Soil Mechanics Introduction to Foundation Engineering
Royal Plaza Hotel, Thailand
4A6 CASE STUDY PRESENTAION World Trade Centre Collapse.
Point Pleasant Bridge Disaster Group 19. Events and consequences 5PM December people killed, 9 injured Only major connection between West Virginia.
Royal Plaza Hotel Korat, Thailand
Ronan Point Disaster 1968 Group 1 Presentation.
1 ROAD & BRIDGE RESEARCH INSTITUTE WARSAW Juliusz Cieśla ASSESSSMENT OF PRESTRESSING FORCE IN PRESTRESSED CONCRETE BRIDGE SPANS.
STRUCTURAL FAILURES AND COLLAPSES Toni Kekki / NKUAS.
Özgür BOZDAĞ Mutlu SEÇER Dokuz Eylül University Katip Çelebi University Izmir, Turkey SEISMIC RETROFITTING OF AN EXISTING INDUSTRIAL STRUCTURE FOR CONVERTING.
AXIAL LOAD CAPACITY OF CELLULAR LIGHTWEIGHT CONCRETE-FILLED STEEL SQUARE TUBE COLUMNS Jaksada THUMRONGVUT Department of Civil Engineering, Rajamangala.
Review of Indian Seismic Codes
John Dalsgaard Sørensen Aalborg University, Aalborg, Denmark
Modeling based on the theory of plasticity
An-Najah National University Faculty of Engineering
SEMINAR ON FOOTING.
Essentials of Fire Fighting Chapter 4 — Building Construction
JACKETING Er. SHAIKH ARSHAD VJTI MTECH CM. INTRODUCTION It is a part of retrofitting i.e. repair, renovation, strengthening. Retrofitting is the modification.
GUIDED BY, MS. D. DARLING HELEN LYDIA M.TECH., PRESENTED BY,
College of Civil Engineering, Tongji University
Wood Structures Topic 8 Quality Workmanship
Foundations in Low-Rise Construction (up to 3 floors)
Bridge Engineering: Lessons from Rome to Tacoma
Factor Of Safety When is it safe enough?.
Modified Mercalli Intensity Scale (MMI): describes intensity of earthquake using observed effects at 12 different levels.
Supervisor: Dr. Mahmoud Dweikat.
Faculty of Engineering Civil Engineering Department
Dr S.Sreenath PhD, MSc Engg, MSc (ICM), MBA
Chapter 1-3 Experiment Parts.
Presentation transcript:

Royal Plaza Hotel Collapse Thailand Group 24

Summary on Collapse Collapsed on Fri 13th August 1993 in less than 10 seconds 379 people in the Hotel were buried, 137 killed and 227 badly injured Collapse was compare to that of a demolition with the use of explosives

Structural History Original building, constructed in 1983, was 3 stories high with 1 underground level Original use was as a massage parlour, changed to a hotel in 1985 Building was modified in 1990, adding 3 extra stories Soil bearing strength was measured, but no foundation or column strengthening carried out

Unusual Collapse Most buildings collapse during or just after construction Royal Plaza collapse 3 years after modifications There were no extreme environmental factors, e.g., earthquakes or floods No misuse of the building

Investigation Tests Concrete Stress Test - Concrete compressive strength was between MPa, within reliability limits Rebar Tests - Rebar samples found to conform to standards Soil Bearing Capacity - Soil able to carry loads even after modification Process of elimination - creep deformation in columns cause of collapse

Investigation Findings Original structure adequately overdesigned with a large Factor Of Safety, explaining delay in collapse Additional floors added to dead and live loads, reducing original margins for safety to zero Columns carrying dead loads at 70-80% capacity, causing micro-cracks When one column close to failure, its loads would be redistributed to the others Called “Progressive Failure” as a collapse of one column leads to the rest failing

Lessons learned Outlooks changed: Buildings that withstood construction without collapse were not only in danger in events of misuse or environmental disaster Change in practices: Buildings could not be constructed with saving money over people’s safety as a priority any more

Procedures Implemented All buildings that were under suspicion of lacking safety in the country were reviewed. 218 were renovated as a result. All engineers were required to register with a newly established Council of Engineers and their work was more closely monitored

Thank you! Questions…