Risk Management Program (RMP) Rule OFFICE OF LAND AND EMERGENCY MANAGEMENT OFFICE OF EMERGENCY MANAGEMENT.

Slides:



Advertisements
Similar presentations
Course Material Overview of Process Safety Compliance with Standards
Advertisements

BLR’s Safety Training Presentations
Occupational Safety and Health Course for Healthcare Professionals.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
IMPROVING CHEMICAL FACILITY SAFETY AND SECURITY OSHA’S DIRECTIVE TO MODERNIZE PSM Spring PDC May 1, 2014 Presented by LT Environmental, Inc.
HAZ COM An employer must assemble information on the hazards of the chemicals they use. (Most will get this data from their chemical suppliers who are.
IMPROVING CHEMICAL FACILITY SAFETY AND SECURITY OSHA’S DIRECTIVE TO MODERNIZE PSM January 30, 2014 Presented by LT Environmental, Inc.
Suzanne Reister, Program Manager Paula Vanderpool, Program Assistant North Central Washington Workers’ Comp Trust Chemical Hygiene – Hazardous Chemicals.
Accident Prevention Programs What Will We Talk About? What is an accident? What is an accident prevention program? Basic elements of a program Where.
Determining the True Root Cause(s) of Accidents and Safety Incidents Incident Investigation and Analysis.
Jack Harrah Governor’s Office of Emergency Services
How to Implement the CalARP Program
Risk Management Program Quality Assurance Program Plan David R. Taylor US EPA Region 9 Quality Assurance Office.
California Accidental Release Prevention Program California Accidental Release Prevention (CalARP) Program.
Modeling with CAMEO Les Benedict St. Regis Mohawk Tribe.
Laws and Regulations Laws and regulations are major tools for protecting people and the environment. Congress is responsible for passing laws that govern.
Developing a Chemical Risk Management Program
Quality Assurance/Quality Control Policy
OSHA Long Term Care Worker Protection Program.  Recognize the purpose of the hazard communication standard.  Describe the components of a hazard communication.
Controlling Risk by Managing Change Jessica Blaydes & Gary Fobare Honeywell Aerospace 2013 Region IX Workshop.
Process Safety Management of Highly Hazardous & Explosive Chemicals Contractor Pre-Qualification, Emergency Preparedness, Incident Investigation, Audits.
PSM Covered Chemical Facilities National Emphasis Program.
Hazardous Waste and Emergency Response
EPCRA1 The Emergency Planning and Community Right-to-Know Act (EPCRA) The Emergency Planning and Community Right-to-Know Act (EPCRA)
SAFETY PRACTICES & OISD NORMS.
Presented to: RETA National Conference – Atlanta November 5, 2014 If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us.
Hazards Analysis. The Next 55 Minutes... l Overview of Hazards Analysis l Scenarios for EPCRA and RMP l Resources.
Elements of Process Safety Management
Process Safety Management
Tim Date, Manager Risk Management Planning Unit
Hot Topics in CAA – 112(r) Federal Program Update GA AWMA REGULATORY UPDATE CONFERENCE Adam G. Sowatzka April 16, 2013.
GW Lupton, Management Analyst Risk Management Planning Unit State Emergency Response Commission Risk Management Plan: Protecting the Community Florida.
U.S. Department of Homeland Security Chemicals of Interest Anti-terrorism Standard.
Ert 312 LECTURE 4 OSHA & DOSH.
Clean Air Act Section 112(r) Federal Program Update U.S. EPA Pacific Southwest Region Emergency Prevention and Preparedness February 15, 2007 CUPA Training.
© 2012 Delmar, Cengage Learning Chapter 13 Regulatory Overview OSHA, PSM, and EPA.
Introduction to Workplace Safety
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Emergency Planning in your business St. Louis City LEPC General Meeting September 4, 2013.
Process Safety Management (PSM)
Risk Management Modernization Rule SMALL BUSINESS ADVOCACY REVIEW PRE-PANEL OUTREACH MEETING WITH OMB/SBA OFFICE OF SOLID WASTE & EMERGENCY RESPONSE OFFICE.
Lecture 2 ENGR. MARVIN JAY T. SERRANO Lecturer
ASSURANCE PINNACOL ASSURANCE Wants you to know about : EMERGENCY/DISASTER PREPAREDNESS.
Hazards Identification and Risk Assessment
Florida Accidental Release Prevention and Risk Management Planning (ARP/RMP) Act State Emergency Response Commission Preparing for Facility Risk Management.
HazCom 30 CFR Part 47 (Interim Final Rule) Telling Miners about Chemical Hazards.
Emergency Planning and Community Right-to-Know Act Tier II Inventory Form Preparing to Submit Part 1 of 2 October
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Safety and Health Program Don Ebert- Risk Manager (509)
OHSAS Occupational health and safety management system.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Accident analysis One-hour training.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Lowell Randel Global Cold Chain Alliance/ International Institute of Ammonia Refrigeration.
Status Report to the President under EO EPA ACTIONS 1 Executive Order: Improving Chemical Facility Safety & Security.
REGIONAL RESPONSE TEAM NOVEMBER 5, Executive Order: Improving Chemical Facility Safety & Security.
Presented at May 2, 2016 CAP Meeting Proposed Changes to EPA’s Risk Management Program May 2, 2016 Bayer Group 4:3 Template January 2016Page 1.
EO Update OFFICE OF LAND AND EMERGENCY MANAGEMENT OFFICE OF EMERGENCY MANAGEMENT.

Pipeline Safety Management Systems
Incident Reporting And Investigation Program
CO Chemical Safety Workshops for Regulated Facilities
RMP Amendments Reconsideration Proposed Rule
HAZARD COMMUNICATION (HAZCOM)
Management of Change Report Errors to Management.
Incident Reporting And Investigation Program
Emergency Planning and Community Right-to-Know Act (EPCRA)
Process Safety Management
Elements of an Effective Safety and Health Program
Elements of an Effective Safety and Health Program
Presentation transcript:

Risk Management Program (RMP) Rule OFFICE OF LAND AND EMERGENCY MANAGEMENT OFFICE OF EMERGENCY MANAGEMENT

Existing regulatory framework The Risk Management Program is one of several programs that address chemical facility safety and security: ◦OSHA Process Safety Management (PSM) standard-Management program for highly hazardous chemicals aimed at preventing and minimizing occupational/onsite exposure ◦Emergency Planning and Community Right-to-know (EPCRA) requirements Local emergency planning and preparedness, emergency release notification, community right-to-know: provision of hazardous chemical storage inventory and toxic chemical release inventory to the community and first responders ◦CAA Section 112(r)(1) general duty clause-Facility owner/operators have a general duty to prevent and minimize releases ◦Chemical Facility Anti-terrorism Standards (CFATS)-DHS security requirements ◦ATF requirements for explosives ◦State/local requirements (e.g., NJ, Contra Costa County, CA regulations) 22

Risk Management Program rule ◦Promulgated in 1996 under Section 112(r) of the Clean Air Act Amendments ◦Applies to all stationary sources with processes that contain more than a threshold quantity of a regulated substance (approx. 12,500 sources) ◦Includes a wide variety of industry sectors, including: refining, chemical manufacturing, energy production, ammonia refrigeration, water treatment, bulk storage, chemical distribution, agricultural retail, and chemical warehouses 3

Applicability 4

Final List of Regulated Substances 140 substances (63 flammable, 77 toxic) 5

6

7

EPA RMP Exemptions Mixtures < 1% concentration (flammable and toxic) Gasoline used as fuel for internal combustion engines Naturally occurring hydrocarbon mixtures prior to processing “Articles” Activities in laboratories Flammable substances used as fuel or held for retail sale Specified uses ◦As structural component of stationary source ◦For routine janitorial maintenance ◦As foods, drugs, cosmetics, or other personal items ◦In process water, non-contact cooling water, compressed air, or air used for combustion Outer continental shelf sources Anhydrous ammonia held by farmers for use as nutrient Transportation 8

9

10

11

12

Colorado by Program Level P1: 34 P2: 69 P3: 77 13

RMP Requirements ◦Requires the source to develop a Risk Management Plan (RMP) ◦Addresses elements aimed at preventing accidental releases and reducing the severity of releases that occur ◦Prepare and submit an RMP to EPA at least every 5 years ◦Covered processes fall within one of three prevention program levels based on: ◦The potential for offsite consequences from a worst-case accidental release; ◦Accident history; and ◦Regulation under OSHA PSM 14

Program levels PROGRAM Facilities PROGRAM 2 1,272 Facilities* Processes not eligible for Program 1, not subject to Program 3 ◦Mainly water & wastewater treatment in Federal OSHA states ◦Additional hazard assessment, accident prevention, management, and emergency response requirements *Analysis reflects OSHA change to PSM retail exemption issued July Processes subject to OSHA’s PSM or in one of 10 specified NAICS codes ◦Larger facilities or those with complex processes ◦Examples include: refining, chemical manufacturing, energy production, water treatment ◦Must use OSHA’s PSM as accident prevention program and include additional hazard assessment, management, and emergency response requirements PROGRAM 3 10,628 Facilities* Processes that would not affect the public in the event of a worst- case release & no accidents with offsite consequences in the last five years ◦Small quantities of flammables, less volatile toxics ◦Limited accident prevention including hazard assessment and emergency response requirements

Program level comparison PROGRAM 1PROGRAM 2PROGRAM 3  Worst case analysis  5-year accident history  Document management system  Worst case analysis  5-year accident history  Document management system  Worst case analysis  5-year accident history  Document management system Prevention Program Certify no additional prevention steps needed  Safety information  Hazard review  Operating procedures  Training  Maintenance  Incident investigation  Compliance audit  Process safety information  Process hazard analysis (PHA)  Operating procedures  Training  Maintenance  Incident investigation  Compliance audit  Management of change  Pre-startup review  Contractors  Employee participation  Hot work permits Emergency Response Program Coordinate with local responders Develop plan/program and coordinate with local responders 16

PSM v. RMP Not the same! Different listed chemicals, concentrations, thresholds Some RMP elements not included in PSM – Management System, 5 year accident history Use different terminology 17

PSM Exemptions – NOT RMP Non-fuel substances sold at retail facilities Flammable liquids stored in atmospheric storage tanks Normally unoccupied remote facilities 18

Program Levels Wrong program level determination Management system: fail to document names of people or positions and define the lines of authority Program Level 1: ◦Proper documentation not maintained for worst-case release scenarios ◦Claim to be P1 but do not meet criteria 19

5 Year Accident History Requirements (all Program Levels) The release must be from a covered process and involve a regulated substance held above its threshold quantity in the process. The release must have caused at least one of the following: ◦On-site deaths, injuries, or significant property damage OR ◦Known offsite deaths, injuries, property damage, environmental damage, evacuations, or sheltering in place 20

5 Year Accident History Failure to report ◦Incidents requiring more than first aid ◦Offsite Data ◦Do not know accurate number of people sheltered in place or evacuated ◦Do not have numbers for property or environmental damage ◦Triggers that require RMP reporting ◦Consequences onsite and offsite ◦Accidents with amounts below CERCLA/EPCRA RQs 21

Offsite Consequence Analysis Estimate “distance to endpoint” for hypothetical worst case and alternative chemical release Identify public and environmental receptors P1: one worst case for each P1 process P2 &3: ◦1 worst case for ALL toxics ◦1 worst case for ALL flammables ◦Additional worst case for another process if different receptors ◦At least 1 alternative release for each toxic ◦At least 2 alternative release for ALL flammables 22

OCA Wrong release quantity or inconsistency between release quantity & endpoint distance Wrong chemical chosen for worst-case scenario Gross mismatch between process & release quantity 23

Safety Information (P2) 24

Prevention Program P2: Safety Information No or outdated SDS No documentation on max inventory, upper/low limits Obsolete equipment or design with no plans to change or documentation to show still safe Safety information not updated when change occurred 25

Process Safety Information (P3) 26

Prevention Program P3:Process Safety Information No documentation showing equipment designed to old costs/standards is still safe (68.65(c)(3)) Did not evaluate consequences of deviation PSI incomplete, not current, or inaccurate ◦Safe Operating Control Limits not specified ◦P&IDs ◦Title block missing date ◦No “checked” or “approved by” signature ◦Inaccuracies noted during walk through 27

Hazard Review (P2) 28

Process Hazard Analysis (P3) 29

Hazard Review/PHA P2 ◦Do not look beyond industry check list Have not looked at industry standard since facility was designed/built P3 ◦PHA findings not resolved, documented, or tracked ◦Safety information not up to date so PHA not started on time ◦Stationary source siting not addressed ◦Miss 5 year update or not retained for the life of the process 30

Operating Procedures (P2) 31

Operating Procedures (P3) 32

Operating Procedures Not maintaining temporary operating procedures Did not assign responsibility for emergency shutdown Did not include operating limits & consequences of deviations Relying solely on existing industry or manufacturer’s operating procedures No start up after emergency shut down procedure 33

Operating Procedures 2 Do not have all required written procedures Operators not able to access procedures Did not certify operating procedures annually (P3) Operating procedures not current 34

Training Must train new operators on the operating procedures and cover health and safety hazards, emergency operations, and safe work practices Refresher every three years (consult with employees re: frequency) Required to determine that each operator has received and understood the training Keep a record for each employee with the date of the training and the method used to verify that the employee understood the training. 35

Maintenance (P2) 36

Mechanical Integrity (P3) 37

Management of Change (P3) 38

Management of Change (P3) Not performed on changed process or equipment (was not “in kind”) PSI not updated SOP not updated Mechanical integrity procedures not updated MOC done after change completed MOC signed off but actual changes not done 39

Pre-Startup Review (P3) 40

Pre-Startup Safety Review (P3) Not done, even though PSI information changed Not done prior to introduction of regulated substance Construction documents not used as basis of pre-startup review PSSR has sign offs but not reflected in actual operations (training, SOPs) 41

Employee Participation 42

Hot Work Permits 43

Contractors 44

Employee Participation/Hot Work Permit/Contractors (P3) Employee Participation ◦No written employee participation program ◦Written program not followed Hot Work Permit ◦Permit not fully completed ◦Fire protection requirements not implemented prior to hot work Contractors ◦Contractor safety performance & programs not evaluated ◦Safe work practices not followed 45

Incident Investigations (P2/3) 46

Incident Investigations “Near misses” not investigated Unresolved or undocumented findings/recommendations Unreported incidents in 5-year accident history Reports never finished due to liability Not getting to “root cause” Attorney does incident investigation, then claims attorney/client privilege 47

Compliance Audit Conduct an audit of the process to evaluate compliance with the prevention program requirements at least once every three years. At least one person involved in the audit must be knowledgeable about the process. Develop a report of the findings and document appropriate responses to each finding and document that deficiencies have been addressed. The two most recent audit reports must be kept on-site. 48

Compliance Audit Issues Not completed at least every 3 years, if at all Does not review all RMP prevention program requirements No certifier or left blank Does not identify person responsible for addressing findings/recommendation, time/schedule, or what actions to be taken Resolutions/corrective actions not documented Perpetually in process 49

More Compliance Audit Did not “promptly” address recommendations Did not address previous PHA and/or compliance audit recommendations; same finding from previous audit Missing documentation (MOC, PSSR, incident investigations) Did not identify overdue inspections, testing, or equipment replacement per applicable code, standard, or RAGAGEP Using PSM audit (not same!!) 50

Emergency Response Program Non-responding: coordinate with LEPC or FD as appropriate. Responding: Need Emergency Response Program ◦Maintain an emergency response plan (maintained at the facility) that includes: ◦Procedures for informing the public and emergency response agencies about releases, ◦Documentation of proper first aid and emergency medical treatment necessary to treat human exposures, and ◦Procedures and measures for emergency response. ◦Procedures for using, inspecting, testing, and maintaining your emergency response equipment; ◦Training for all employees in relevant procedures; and ◦Procedures to review and update, as appropriate, the emergency response plan to reflect changes at the facility and ensure that employees are informed of changes. 51

Emergency Response Wrong phone numbers Long chain of phone calls to be made – not “immediately” Don’t know where plan or SDSs are, what to do to report a major release Say respond when don’t have the capability No first aid information for RMP chemicals Outdated Use Fire Department; did not coordinate 52

Risk Management Modernization Rule OFFICE OF LAND AND EMERGENCY MANAGEMENT OFFICE OF EMERGENCY MANAGEMENT

Background On August 1, 2013, President Obama issued Executive Order (EO) 13650: Improving Chemical Facility Safety and Security following several catastrophic chemical facility incidents in the United States.(EO) 13650: Improving Chemical Facility Safety and Security ◦Focus is to reduce risks associated with hazardous chemicals to owners and operators, workers, and communities by enhancing the safety and security of chemical facilities. 54

More Background The keys areas of emphasis under the EO are: ◦Strengthening community planning and preparedness, ◦Enhancing federal operational coordination, ◦Improving data management, and ◦Modernizing policies and regulations. ◦EPA issued a request for information (RFI) on July 31, 2014, and ◦Convened a Small Business Advocacy Review panel on November 4, Comments closed May 13,

Overview of Proposed Revisions P1P2P3 Third-party audits (applies to the next scheduled audit after an accident) [Estimated 150/year] √√ Incident Root Cause Analysis (only for facilities with accidents/near misses) [Estimated 150/year] √√ Safer Alternatives Analysis (applies to a subset of P3 in certain NAICS codes) [Estimated 1,692 Facilities/4,308 Processes] √ Coordinating Emergency Response Program Requirements with Local Responders √√ Emergency Response Exercises√√ Information Sharing√√√ 56

Additional resources RMP rule webpage: management-program-rmp-rulehttp:// management-program-rmp-rule EO activities under EO 13650: order-improving-chemical-facility-safety-and-securityhttp:// order-improving-chemical-facility-safety-and-security A copy of EO is available at: A copy of the Report to the President: Actions to Improve Chemical Facility Safety and Security–A Shared Commitment is available at A copy of the EPA RFI is available at

Anhydrous Ammonia OSHA Retail Exemption Change – On Hold! OFFICE OF LAND AND EMERGENCY MANAGEMENT OFFICE OF EMERGENCY MANAGEMENT

EPA RMP Exemptions Mixtures < 1% concentration (flammable and toxic) Gasoline used as fuel for internal combustion engines Naturally occurring hydrocarbon mixtures prior to processing “Articles” Activities in laboratories Flammable substances used as fuel or held for retail sale Specified uses ◦As structural component of stationary source ◦For routine janitorial maintenance ◦As foods, drugs, cosmetics, or other personal items ◦In process water, non-contact cooling water, compressed air, or air used for combustion Outer continental shelf sources Anhydrous ammonia held by farmers for use as nutrient Transportation 59 NO RETAIL EXEMPTION FOR TOXIC CHEMICALS

60

Program Level 2 v. Program Level 3: Offsite Consequence Analysis & Management System 61 Same!

Program Level 2 v. Program Level 3: Prevention Program 62

Program Level 2 v. Program Level 3: Emergency Response Program 63 Same!

Tools WISER, CAMEO 64

WISER: wiser.nlm.nih.gov Wireless Information System for Emergency Responders ◦Substance Identification Support ◦Physical characteristics ◦Human health info ◦Contaminant and suppressant guidance Standalone app or with internet 65

66

67

68

CAMEO CAMEO Chemicals CAMEOfm Database Mapping Applications for Response, Planning, and Local Operational Tasks – (MARPLOT) Areal Locations Of Hazardous Atmospheres (ALOHA) 69

CAMEO for Responders/Planning Quickly identify chemical properties, response procedures, and PPE with CAMEO Chemicals Don’t need internet Import GIS Shapefiles into MARPLOT Develop mock scenarios of potential releases and predict worse case releases Develop emergency response plans using models of threat zones associated with a release(s) of hazardous chemicals Plot sensitive populations, county-specific attributes, potential contamination sources 70

Download:

OFFICE OF SOLID WASTE & EMERGENCY RESPONSE OFFICE OF EMERGENCY MANAGEMENT 72

CAMEO Chemicals - Desktop, Online, Mobile OFFICE OF SOLID WASTE & EMERGENCY RESPONSE OFFICE OF EMERGENCY MANAGEMENT 73

74

CAMEOfm 75

76

MARPLOT: Mapping Applications for Response, Planning, and Local Operational Tasks 77

78

OFFICE OF SOLID WASTE & EMERGENCY RESPONSE OFFICE OF EMERGENCY MANAGEMENT 79

ALOHA: Areal Locations of Hazardous Atmospheres 80

81

82

83

84

85

86

Questions? Rebecca Broussard