HA Electronics Progress December R. Larsen For the Team.

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 1 DR Kicker R&D: Goals and Work Scope Michael S. Zisman and Tom Mattison.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
PEP II Transverse Feedback System Ron Akre Anatoly Krasnykh Uli Wienands MAC April 15, 2004.
MICE Electronics & DAQ P J Smith University of Sheffield.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
Using FPGAs with Embedded Processors for Complete Hardware and Software Systems Jonah Weber May 2, 2006.
PROBE CARD INTEGRATION IN pALPIDEfs TEST SYSTEM ALICE | ITS-MFT Mini-Week | | Markus Keil.
Americas Region High Availability Electronics R&D Program FY06-07 DOE/NSF ILC Americas Program Review FNAL April Ray Larsen SLAC For Controls,
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Engineering & Instrumentation Department, ESDG, Rob Halsall, 24th February 2005CFI/Confidential CFI - Opto DAQ - Status 24th February 2005.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
Ultra-Fast Damping Ring Kicker Modulator Development at SLAC Status update for ILC2010 C. Burkhart, A. Krasnykh, R. Larsen, & T. Tang March 27, 2010.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
SLAC ILC High Availability Electronics R&D LCWS IISc Bangalore India Ray Larsen, SLAC Presented by S. Dhawan, Yale University.
Operations, Test facilities, CF&S Tom Himel SLAC.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixtures FEE64 commissioning A few of the remaining tasks 16th July 2009.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
ATCA at UIUC M. Haney, M. Kasten High Energy Physics Z. Kalbarczyk, T. Pham, T. Nguyen Coordinated Science Laboratory ILLINOIS UNIVERSITY OF ILLINOIS AT.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
BUSINESS SERVICES Goals and Objectives *TOP EIGHT* ACCOMPLISHMENTS DURING
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
Report on T1 and T2 DAQ A.Asahara, H.Kubo, D.Nishida 5/July/2002CANGAROO meeting.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Chris Pasma, SSL Mechanical.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Notes on visit to Rome 28/04/2014 Christian Joram Szymon Kulis Samir Arfaoui.
July 10, 2001 Status Report of the ROD Testing at BNL Kin Yip Activity update of the ROD system at BNL: DAQ-1 with trigger controller Data corruption testing.
Bogusław Kosęda, DMCS-TUL XFEL-LLRF-ATCA Meeting, 3-4 Dec The European X-Ray Laser Project XFEL X-Ray Free-Electron Laser 1 Automation for XFEL in.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
DR Kicker R&D: Goals and Work Scope
CLAS12 DAQ & Trigger Status
Beam diagnostics from GSI
LKr status R. Fantechi.
Development of a Marx-Generator for the drive beam electron gun
LCLS Klystron Modulator AIP Sec 28 AIP Review Feb 2010
Senior Staff Meeting November 12, 2008
TileCal upgrade EVO meeting Demonstrator tesks
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Chris Adolphsen Sergei Nagaitsev
THE PROCESS OF EMBEDDED SYSTEM DEVELOPMENT
T1 Electronic status Conclusions Electronics Cards:
EDR HLRF Work Packages Draft Summary
CMS November Upgrade Week
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
New xTCA Developments at SLAC
Mini-drawers, FE-ASIC , Integrator
Beam Sync Output - fiber, one microsecond pulse of Beam Sync Input
HCAL Data Concentrator Production Status
CMS EMU TRIGGER ELECTRONICS
INO TRIDAS presentations
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
TCM PS – SPS Thyratron Power Trigger Consolidation
Fast Kicker R&D in the Americas Region
Proton Source and LEBT Luigi Celona & Lorenzo Neri
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Junji Urakawa (KEK) for ATF International Collaboration
Combiner functionalities
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Krzysztof Czuba ESS LLRF Quarterly Meeting
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
Presentation transcript:

HA Electronics Progress December R. Larsen For the Team

December HA Progress2 Power Supplies HA development demonstration: –Current sharing 1+N done –Dual bulk in progress – supplies ordered –Dual controller in progress – MacNair will be ~40% time in 07

December HA Progress3 ATF2 Power Supplies B. Lam assigned engineer w/ Bellomo supervising –Procurement of major components in progress – took a month to get through purchasing –B. Lam off to Japan to coordinate installation preparations –M&S grew somewhat but generally are very tight on M&S in current budget

December HA Progress4 Kicker Status –Two proposals submitted, one to continue LLNL program (E. Cook) and one new DSRD snap recovery diode (A. Krasnykh & C. Burkhart) –Ed continues experimenting with faster mosfets, packaging, integration –Anatoly proposal is abandoned orphan on porch waiting for someone to pick up

December HA Progress5 Controls & Instrumentation Stds Due to budget restrictions 07 program limited to U of Illinois evaluation program (0.75 FTE) plus oversight and consulting from B. Downing (1/4 time) Generally good progress running systems with software that they installed –Demo of shelf manager operation, controller failover –Very limited system; need some additional modules –We proposed study of a VME adapter card so could get ATCA running experience with small DAQ implementations –Working on spec and will get company to build it (Downing, Kastner)

December HA Progress6 Controls Collaboration Had money & FTEs in 07 but has been stripped out with latest budget –Expect further cuts (somewhere) with CR –Will continue with weekly meetings involvement and no active project work –08-09 ART budget shows more than half of controls funds going to FNAL for test systems (Controls + LLRF)

December HA Progress7 Marx Progress continues slowly but steadily –Reached 70 kV late last week with 8 cards running –Greg fixing a trip problem in FPGA that “needs a 1 usec blanking pulse” –Hoping for a Christmas pony Vernier card designed, getting ready for review, then will be built (Burkhart) –Meanwhile Greg has another scheme to control droop using the standard cards alone which he wants to evaluate along with vernier.

December HA Progress8 Marx Diagnostic Processor Jeff’s processor card working at HV after hdwe floating pin fixed with pullup. –Display shows pulse width and delay settings each board and sum –Current and voltage diagnostics still to be implemented (need probes) –Seems like a very nice start –Chestnut et al to interface to EPICS high level controls

Finis