Jiří Karásek, Jan Veleba SEVEn, The Energy Efficiency Center This project has received funding from the European Union’s Horizon 2020 research and innovation.

Slides:



Advertisements
Similar presentations
SIMPLY CLEVER Ing. Martin Jahn Member of the board of management ŠKODA AUTO a.s. KNOWLEDGE ECONOMY FORUM V Innovation and Technology Absorption for Growth.
Advertisements

Building Materials And their properties.. Traditional building materials Stone Brick Timber Slate Lead Mud! Plaster (gypsum)
5800 Pleven, Al. Stamboliiski str. 16 tel.: ; fax: German-Bulgarian Vocational Training Centre Pleven.
Funded by the European Union University of Zagreb Faculty of Agriculture Svetosimunska street 25, Zagreb, Croatia Contact:
AFFORDABLE “BREATHING WALL” Building Envelope Design For conventional North American wood frame and panelized (SIP’s) construction “Breath of Life” building.
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Environmentally-friendly insulation systems made from natural wood fibres We care about your well-being.
Improving Energy Efficiency in Traditional Buildings Moses Jenkins Technical Conservation Group.
Energy Efficient Through-holes Repository: Aho Hanna, Korpi Minna (edit) REALISATION OF AIR PROOF STRUCTURES AND CONNECTIONS IN RESIDENTAL BUILDING Techical.
REMODECE Project: WP6: Strategies for Market Transformation and Recommendations to Policy Makers Aggelidis Konstantinos Centre for Renewable Energy Sources.
BioRES - Sustainable Regional Supply Chains for Woody Bioenergy EU Horizon 2020 Coordination and Support Action 1 BioRES has received funding from the.
BioRES Project: Sustainable Regional Supply Chains for Woody Bioenergy EU Horizon - Coordination and Support Action 1 BioRES has received funding from.
Energy Efficient Through-holes The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect the opinion.
Possibilities of Business Support within the Operational Programme Enterprise and Innovation for Competitiveness May 2015.
Dunia Baddou, Zaida de León Martín y Ekaitz Casas. 4ºC.
Cedars-Sinai Medical Center Capacity Building in Central and Eastern Europe: Research and Innovation Management Education and Training Innovation 2005.
Co-funded by the European Union "This project has been funded with support from the European Commission. This publication reflects the views only of the.
Energy Conservation in the roof structure. Energy conservation Conservation of energy within a roof structure can be at two different positions i.e. Ceiling.
K O N F E R E N C E Ministerstva průmyslu a obchodu ČR 14. června 2007 Michnův palác, Praha OPERAČNÍ PROGRAM PODNIKÁNÍ A INOVACE Investice do Vaší budoucnosti.
Common Components of a Traditional Wood Framed Building
BlueBRIDGE receives funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No
Market Health Health-2-Market Final Conference 1st July 2015, The Hotel, Brussels, Belgium Health-2-Market mobile application Krisztina Toth, Project Manager,
Common borders. Common Solutions. Grant Contract No , MIS-ETC 2674 MANAGE.EDU: Efficient Education Management Network for LLL in the Black.
1 Innovation Energie Développement Vocational Technical Training for Cambodia and Laos Rural Electrification SMEs (VTCL) Tuan Nguyen, IED Supported by.
LPP-LDV-TOI-09-IT-0503 Project Presentation. LPP-LDV-TOI-09-IT-0503 What is the LeTS GO project? The LeTS Go project has been financed by the European.
Klik om het opmaakprofiel van de modelondertitel te bewerken I AM ROMA.
Framing the House. Platform Framing Platform framing.
TÜBİTAK SOCRATES II European Community action programme in the field of education Duration: 1 January December 2006 Budget: 1,850 mEuro over.
Leonardo da Vinci Innovation Projects- European Priorities Priority: Transparency and Recognition Projects that did it!
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
Unit 6/P6 – Timber Frame Construction Name ________________
Name ________________ Unit 6/P6 – Traditional Construction Most common foundation = strip Damp Proof Course 150mm above ground level External Walls are.
TRAFOON project is funded by the European Community's Seventh Framework Programme (FP7/ ) under grant agreement no Mrs. PATRICIA MORA GESTIONA.
Common borders. Common Solutions. Grant Contract No , MIS-ETC 2674 MANAGE.EDU: Efficient Education Management Network for LLL in the Black.
Research and Innovation Research and Innovation I Foro Panamá – Unión Europea Piero Venturi Counsellor for Research and Innovation EU Delegation to Brazil.
Networks ∙ Services ∙ People Bert van Pinxteren General Assembly, Porto, Portugal Transition to one GÉANT Annual Review June,
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
Agentia pentru Eficienta Energetica si Energii Regenerabile Ploiesti- Prahova.
Energy efficient connections in stone houses The sole responsibility for the content of this publication lies with the authors. It does not necessarily.
Boosting the scientific excellence and innovation capacity in additive manufacturing of TUCN The AMaTUC project has received funding from the European.
Pilot project „ Support Measures for Small-Scale Fishing ” GRANT AGREEMENT FINANCED BY THE EUROPEAN UNION: MARE / 2014/04 - SI Total amount of.
FROM LOCAL TRIALS TOWARDS A EUROPEAN KNOWLEDGE COMMUNITY
1 Towards Excellence: Research, Development and Innovation Policy Measures of the Ministry of Education, Youth and Sports Dalibor Štys Minister of Education,
Dublin City Council Fabric Upgrade Programme Shane Hawkshaw Senior Executive Engineer Dublin City Council.
Olga Zyrina, IPPT-PAN, Poland. NCP for HORIZON 2020 & Euratom-Fission Coordinator of NCP & EURAXESS Networks in Poland Cooperation with the Enterprise.
Authentication and Authorisation for Research and Collaboration Brussels Training and Outreach Authentication and Authorisation.
CONCRETE AND SUSPENDED TIMBER
Training-to-trainers
Between a rock and a hard place:
Education towards nZEBs in the Czech Republic
The design and construction of ground floors:
Training programs in IngREes project
1st Conference in the Field of Creative and Cultural Industries,
Substructure Construction Sequence
Task 1 Activities Achievements Pictures
Made in Danube Transnational Cooperation to transform knowledge into
Sound insulation of massive wood floor constructions
International Building Materials and components
TOOP The Once-Only Principle Project
Framing the House                                                                                                                   
US Cluster Visit Booklet
25 partners around the world
INTRODUCTION AND SPECIFIC NEEDS
DISPA meeting Czech Presidency of the EU 2009
their business through new product lines
For your MSCA project submission
SUpport and PartnERship for the development of multiple sustainable and market ready value chains in the BIO-based economy SuperBIO is funded by the research.
Chapter KNOWLEDGE SHARING
Digital Learning – participatory meeting
Presentation transcript:

Jiří Karásek, Jan Veleba SEVEn, The Energy Efficiency Center This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No CESB 16 (22 June Prague)

2 OBJECTIVES OF PROJECT Setting up 4 Building Knowledge Hubs (BKHs) Bulgaria Romania Turkey Czech Republic and 1 pilot center in Ukraine 2 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

3 OBJECTIVES OF PROJECT 120 training courses on 10 selected training programs for each of the 4 BKHs, targeting additional qualification of 2400 trainees 24 training courses for designers, consultants and building managers on at least 2 selected training programmes for each BKH, targeting additional qualification of 480 trainees 36 training courses for non-specialists on at least 3 selected training programmes, targeting additional qualification of 720 trainees 3 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

4 MARKETING RESEARCH 4 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

5 MARKETING RESEARCH 5 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

6 CONCLUDED AGREEMENT Concluded agreement with ABF 6 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

7 DEVELOPMENT OF MODELS 7 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No PopisMěřítko a rozměrySkladba konstrukcíObrázek Budoucí novostavba, stěna z vápenopískových cihel s izolací z minerální vlny. Stavba má splňovat standard pasivní budovy. U-hodnota obvodové stěny 0,115 W(m2K) 1:1 cca 130 x 80 x 260 cm Spodní stavba – floor finish e.g. timber, tile etc. 150 mm power floated concrete floor slab 300 mm EPS/XPS insulated foundation system in 3 layers of 100 mm 50 mm sand blinding hardcore Stěna – MVC 215? mm vapenopiskove cihly 250 mm polystyren/minerální vlna 0,031 W/mK omítka Střecha – izolována concrete tile or slate finish timber counter batten timber batten breathable roof membrane 80 mm gutex wood fibre board 225 mm timber rafter at 400 centres with insulation between 18 mm OSB racking board taped for airtightness 50 mm timber batten at 600 centres with insulation between 18 mm OSB racking board Okno – izolační, trojsklo

8 CURRENT ACTIVITIES Business plan Training programmes Development of models Training of trainers Pilot trainings Advisory center 8 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

Jiří Karásek Thank you for your attention! 9 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No