Ancillary Services Replacement

Slides:



Advertisements
Similar presentations
Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
CRR Shortfall – Revenue Equalization Part 2 (Continuation from 2/21/08 TPTF discussion) Bill Barnes TPTF 3/5/2008.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
Concerns with RUC Capacity Short Charge and Energy Trades.
NPRR605 Ancillary Service Make-Whole Payments Under a Watch.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Ancillary Services – Day-Ahead & Real Time Markets Mini Market.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
July QMWG Update (WMS). GREDP Discussion GREDP is currently used as a compliance tool ERCOT is considering now just using it as an investigative tool.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
August 2012 QMWG DAM Clearing Behavior for Fixed Quantity Blocks Carrie Tucker Supervisor, Day-Ahead Market.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Operational Issues.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Application of High Sustainable Limit With PRR 666/676 WMS November 15, 2006 Ino Gonzalez ERCOT Settlements.
QMWG Update to WMS S. Looney December 3, Assignments from WMS ERCOT Market Operations Report – Two SASMs in October, no AS insufficiency – Two unique.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
Ancillary Services Replacement Presenter: Ino González Wholesale Market Subcommittee July 8, 2015 ERCOT Public.
ERCOT Ancillary Services Workshop. Legal Disclaimers and Admonitions ANTITRUST ADMONITION ERCOT strictly prohibits market participants and their employees,
QSE Managers Working Group November 7 th 2011 NPRR 334 – Additional Analysis.
1 Nodal Stabilization Market Call December 03, :30 PM.
Settlement Update Blake Holt ERCOT 2/15/2016. Agenda NPRR689 – R1 – 02/10/16 NPRR744 – Buy-Back notification NPRR746 – Negative load impacts 2016 Settlement.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
DAM Self-Commitment Issues & Solutions Shams Siddiqi, Ph.D. (512) March 3, 2008.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
Utilization of Fuel Costs in Ercot Markets Ino González RCWG Meeting 2/24/2016.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
RPRS March 23, 2006 Presented by ERCOT Art Deller Bill Kettlewell
CRR Deration and NPRR821 WMS 09/06/2017.
Exceptional Fuel Costs in LMP
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Current FRRS Language & Explanation of Posted Data
General Overview Of Resource Costs
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Ancillary Service Trades and Ancillary Service Settlement
Real-Time Co-optimization of Energy & Ancillary Services
Settlement Update Austin Rosel ERCOT October 11, 2017.
Real-Time Co-optimization of Energy & Ancillary Services
Txho/10627 HLP089.PPT DSWG LaaR Update May 13, 2005.
Settlements Analysis due to SFT Deration Issue
7th July 2011 Transmission Workgroup - Elexon
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Presentation transcript:

Ancillary Services Replacement Presenter: Ino González QMWG July 10, 2015 ERCOT Public

Replacement of Undeliverable Ancillary Services NP 6.4.9.1.2 Replacement of Undeliverable Ancillary Service Due to Transmission Constraints (4) If ERCOT procures additional Ancillary Services for the amount of substituted capacity that is deemed infeasible or the amount of Ancillary Services capacity that each affected QSE does not replace, then all QSEs that bought the specific Ancillary Service in the DAM are charged for their share of the net cost incurred for the Ancillary Service procured by ERCOT as part of the multiple procurement processes (DAM and SASMs) , in accordance with Section 6.7.3, Adjustments to Cost Allocations for Ancillary Services Procurement. ERCOT Public

Replacement of Undeliverable Ancillary Services NP 6.4.9.1.2 Replacement of Undeliverable Ancillary Service Due to Transmission Constraints (5) If the QSE’s Ancillary Service capacity that is undeliverable because of a transmission constraint identified by ERCOT, as set forth in (1) above, was not awarded in the DAM or any SASM (i.e., the capacity is part of Self-Arranged Ancillary Services for the hours of the RUC Study Period), then the QSE is charged for the insufficient Ancillary Service capacity the same price paid for the Ancillary Service as purchasers in the DAM paid for that time period, as determined under paragraph (4) above. ERCOT Public

Replacement of Undeliverable Ancillary Services NP 6.4.9.1.2 Replacement of Undeliverable Ancillary Service Due to Transmission Constraints (6) If the QSE’s Ancillary Service capacity that is undeliverable because of a transmission constraint identified by ERCOT, as set forth in (1) above, was awarded in the DAM or any SASM, then the QSE is not compensated for the quantity of the Ancillary Service capacity that is undeliverable. ERCOT Public

Replacement of Undeliverable Ancillary Services NP 6.7.3 Adjustments to Cost Allocations for Ancillary Procurement Each QSE’s share of the net total costs for Reg-Up for the Operating Hour is calculated as follows: RUCOST q = RUPR * RUQ q Where: RUPR = RUCOSTTOT / RUQTOT RUQTOT = RUQ q RUQ q = RUO q – SARUQ q RUO q = Sum[SARUQ q + (RTPCRU q, m) + PCRU q – RURP q – RUFQ q] * HLRS q + RURP q SARUQ q = DASARUQ q + RTSARUQ q ERCOT Public

Questions that need to be answered to develop an NPRR Should QSEs be charged (claw back) for undeliverable MWs? Options: Based on replaced MW or Undeliverable MW quantities Note: Replaced MWs ≤ Undeliverable MWs Example: DAM Award (10MW), Undeliverable (7MW), RURP(5MW), MCPCRU ($3) DAM Payment = (-1)*10MW*$3/MWh = ($30) Claw back option 1= 7MW*$3/MWh = $21 Claw back option 2 = 5MW**$3/MWh = $15 To what extend QSEs with self-arrange MWs are responsible for undeliverable quantities? Should QSEs with DAM Obligations be charged when the self-arranged MWs are part of a trade that is undeliverable? Other policy questions? ERCOT Public