European cryogenic days Membrane cryostats for large volume neutrino detectors June 9 th, GENEVA.

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
MGT Liquid & Process Systems Designing and manufacturing of custom-made, innovative stainless steel process solutions Privately owned 40 years of experience.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Environmentally-friendly insulation systems made from natural wood fibres We care about your well-being.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
The WA105 17m3 LArCryostat pre-experience M.Ne. Status Tender done for the membrane part, 1 German firm selected A lot of time wasted to renegotiate the.
Constructing the “Price” of the Technology in IP Licensing Negotiations Sub Regional Training Program on IP Valuation Maribor November 5 to 7, 2012.
1 Fulvio TESSAROTTO Update on the thin RICH beam pipe project - prototypes validation and pipe production - microflanges and fixation system - the intervention.
Benefits of a SUSE ® Subscription Insert Presenter's Name (16pt) Insert Presenter's Title (14pt) Insert Company/ (14pt)
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
ICARUS Cold Vessels Thermal insulation Project progress report.
April 30, 2007 openSUSE.org Build Service a short introduction Moiz Kohari VP Engineering.
JPARC- Decay Volume M.Sakuda (KEK) 11 November Decay Volume Requirements Design 2. Construction Status 3. Summary and schedule In collaboration.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
Some naïf ideas on cryostats , BNL-LBNF meeting D.Mladenov, M.Nessi.
Discussion: développement du système de lecture des photomultiplicateurs pour le prototype de détecteur Argon liquide de LBNO 21/11/2013 Réunion: APC,
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Concept Design for LBNF Far detector (LAr single phase)
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Increase of the T600 maximum drift distance and preliminary considerations for larger aluminum vessels Claudio Montanari INFN-Pavia, Italy 1ICARUS Meeting.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Dual-Phase ProtoDUNE Detector Installation : Plans & Constraints Adamo Gendotti.
35ton and LAPD cryostats and future DUNE detector development.
The ModuLAr Project LoI discussion INFN-LNL 21/11/2007 Legnaro (PD)
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Liquid natural gas LNG. Outline What is LNG? Well to customers.
The DUNE 35ton Prototype at Fermilab. DUNE FD ND 1300 km We have learned much about neutrinos in the last 70 years, but there is still much we don’t understand.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
Neutrino Platform Proximity Cryogenics Functional Design M.Chalifour 14/04/2016 M. Chalifour - TE/CRG-CI 2.
ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14,
Forrester and Novell Novell ® Identity Manager 4 Webcast I Insert Presenter's Name (16pt) Insert Presenter's Title (14pt) Insert Company/ (14pt)
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
SBND Cryostat Requirements David Montanari, Michael Geynisman, Dimitar Mladenov, Joe Howell 14 October 2015.
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Installation of the T600 at Fermilab
Overview of the Long-Baseline Neutrino Facility Cryogenic System
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
Plans for the construction of the new membrane cryostat in bldg 182
LBNF CAD models, Drawings and Component list
Proximity Cryogenics P&IDs Meeting
protoDUNE – single-phase Instrumentation - Gas Analyzers
Dielectric Oil Installations
SC Railing Company Overview
Proximity Cryogenics P&IDs meeting
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
INSTALLATION SEQUENCE
COOL BUILDINGS Anne-Claire Streck.
M. Chalifour - TE/CRG-CI
First tests on the roll-formed field cage.
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Teleconference ACS – FREIA 17th October 2017
Warm structure requirements :
Teleconference ACS – FREIA 31st October 2017
Low-Radioactivity Argon Transportation and Storage
EHN1 Neutrino Installation Plans
Far Detector Activities Late 2017 – Early 2018
Status of the cryogenic system for B180
Teleconference ACS – FREIA 20th February 2018
Company profile ABCD GROUP CO., LTD.
 GDPR Readiness Quiz Quick Insight: Quick Insight: Quick Insight:
UPPSALA UNIVERSITY_GERSEMI PROJECT
Magnetic shielding and thermal shielding
Presentation transcript:

European cryogenic days Membrane cryostats for large volume neutrino detectors June 9 th, GENEVA

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 This document is strictly confidential. Any unauthorised access to, appropriation of, copying, modification, use or disclosure thereof, in whole or in part, by any means, for any purpose, infringes GTT’s rights. This document is part of GTT’s proprietary know- how and may contain trade secrets protected worldwide by TRIPS and EU Directives against their unlawful acquisition, use and disclosure. It is also protected by Copyright law. The production, offering or placing on the market of, the importation, export or storage of goods or services using GTT’s trade secrets or know-how is subject to GTT’s prior written consent. Any violation of these obligations may give rise to civil or criminal liability. © GTT, Disclaimer 2

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 Agenda 1- Company overview 2- A first prototype: 17 m³ LAr tank 3- Two new 600 m³ LAr tanks 4- Next step 3

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 Company overview 4 1

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 An engineering company with more than 50 years of experience in the design of the Membrane Cargo Containment Systems for cryogenic liquids GTT is a public company listed on the Euronext Stock Exchange (Paris) About 120 ships and onshore tanks currently on order Around 380 highly qualified people, mainly at head office, but also present worldwide One project already designed for CERN and two others ongoing GTT in brief 5 (1)As at December 31 st, 2015

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 NO96 system Primary Invar membrane Primary insulation box Secondary Invar membrane Inner hull Secondary insulation box Invar tongue Coupler Composite secondary membrane (Triplex) Inner hull Metallic insert Top bridge pad Primary stainless steel membrane Corner panel Hard wood key Resin ropes Insulation panel Mark III system GTT membrane technologies 6

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 A first prototype: 17m³ Lar tank 7 2

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 Context Main targets of the « prototype », a 17m3 tank containing liquid Argon Approving membrane technology in contact with Argon (keep the Argon very pure) Approving the thermal efficiency of the insulation system Approving the instrumentation system developed to detect neutrinos

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 A real challenge for GTT First time for GTT to design container for Liquid Argon: Argon specificities -188°C 1400 kg/m³ Keep an high purity of the stored Argon (no pollution from containment system) Tightness of the primary container reaching 10-9 mbar.l.s-1 Tank: Three liners of insulation (1m) Thermal flux limited to 5W/m² Foam density: 70kg/m³ Top cap about 20 crossing pipes in 6m² Removable element

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 An innovative solution Adapted to CERN needs: 3 isolating layers: 400mm + 2*300mm Specific panels arrangement Double containment A mix between two insulation systems made of: Stainless steel (tank) Invar (Top Cap) Dedicated corrugation arrangement (1.2m high) in upper part of the tank

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 Construction already completed Containment system for tank: Built at CERN premises By, a company specialized in the GTT’s membrane system installation Containment system for top cap: Built at premises Already delivered at CERN Next steps: Instrumentation installation is ongoing Top cap installation scheduled during summer Cool down of the tank in the second half 2016

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 Two new 600 m³ LAr tanks 12 3

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 Franco Sergiampietri, 20 November 2016, 13 CONTEXT: Two different detectors GTT’s system has been selected for this new step of development NP02 tank : Double phase TPC (Time Projection Chamber ) as a prototype for the DUNE experiment NP04 tank : Single phase TPC as a prototype for the DUNE

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 A new challenge for GTT Two liners of insulation (0,8m) Triple containment system Foam density: 90kg/m³ First time for GTT to design: Pipes crossing 3 liners High density of crossing pipes (mainly on top side) About 60 elements from Ø30 to 700mm

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 Next step 15 4

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 Final goal? 16 LBNF/DUNE project

CONFIDENTIAL GTT for European cryogenic days 09/06/2016 Thank you for your attention 17 Jérôme Pellé