DHCAL Progress Report José Repond Argonne National Laboratory SiD Meeting, SLAC, October 26, 2006.

Slides:



Advertisements
Similar presentations
Status of DHCAL Slice Test Data Analysis Lei Xia ANL-HEP All results preliminary.
Advertisements

1 m 3 Prototype Digital Hadron Calorimeter Collaborators Argonne National Laboratory Boston University University of Chicago Fermilab University of Texas.
Digital Hadron Calorimetry using Gas Electron Multipliers Andy White University of Texas at Arlington.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 24 November 2003 What’s new since September…
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
July 2003American Linear Collider Workshop Cornell U. Development of GEM-based Digital Hadron Calorimetry Andy White U.Texas at Arlington (for J.Yu, J.Li,
Andy White U.Texas at Arlington (for J.Yu, C.Han, J.Li, D.Jenkins, J.Smith, K.Parmer, A.Nozawa, V.Kaushik) 10/18/04 IEEE/NSS Digital Hadron Calorimetry.
Report from CALICE meeting CERN 9/23-23/2002 Andy White Web Site for meeting: agenda_CALICE_23090.html.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
DHCAL Construction Status Lei Xia Argonne National Laboratory ALCPG2009, Albuquerque.
GEM Digital Hadron Calorimetry
1 Status of GEM DHCAL Andy White For GEM-TGEM/DHCAL Group March 21, 2011 ALCPG11 Workshop Univ. of Oregon Introduction 30cmx30cm 2D readout with KPiX chip.
Development of a DHCAL with Resistive Plate Chambers ECFA/DESY Workshop at NIKHEF, Amsterdam, Netherlands April 1 - 4, 2003 José Repond Argonne National.
Andy White University of Texas at Arlington For GEM DHCAL Group ESTB Workshop SLAC 2012 Introduction KPiX Readout FTBF Beam Test Setup Beam Test Analysis.
José Repond Argonne National Laboratory Status of the DHCAL Project SiD Collaboration Week January 12 – 14, 2015 SLAC.
Digital Hadron Calorimeter (DHCAL) José Repond Argonne National Laboratory CLIC Workshop 2013 January 28 – February 1, 2013 CERN, Geneva, Switzerland.
Hadron Calorimeter Summary Andy White SiD Workshop, SLAC October 2006.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Recent DHCAL Developments José Repond and Lei Xia Argonne National Laboratory Linear Collider Workshop 2013 University of Tokyo November 11 – 15, 2013.
Tests of a Digital Hadron Calorimeter José Repond Argonne National Laboratory CALICE Collaboration Meeting March 10 – 12, 2010 University of Texas at Arlington.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
The DHCAL Data Analysis José Repond CALICE Meeting, Prague, September 10 – 12, 2007.
BILCW07, Feb 2007, H.WeertsSlide 1 RPC-DHCAL Progress & Status H.Weerts BILCW07, Beijing, February 4 – 7, 2007 Research done as part of program of CALICE.
Calibration of a Digital Hadron Calorimeter with Muons Burak Bilki d, John Butler b, Tim Cundiff a, Gary Drake a, William Haberichter a, Eric Hazen b,
Construction and Operation of DHCAL Fermilab Test Beam Facility Lei Xia ANL_HEP.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
RPC-DHCAL Progress Report José Repond Argonne National Laboratory SiD Workshop, FNAL, April 9 – 11, 2007.
May 31, 2007CALICE DHCAL J. Yu 1 Gas DHCAL R&D May 31, 2007 WWS CAL R&D Review, DESY Jae Yu University of Texas at Arlington For CALICE DHCAL Groups Introduction.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
A Hadron Calorimeter with Resistive Plate Chambers José Repond Argonne National Laboratory Presented by Andy White University of Texas at Arlington LCWS.
Experiences at MTBF José Repond Argonne National Laboratory CALICE Meeting, ANL, 17 – 19 March, 2008.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
A Hadron Calorimeter with Resistive Plate Chambers José Repond Argonne National Laboratory CALOR 2006, Chicago, June 5 – 9, 2006.
US DHCAL Status Lei Xia Argonne National Laboratory.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Digital Hadron Calorimetry for the International Linear Collider Using Gas Electron Multiplier Technology Andy White University of Texas at Arlington (for.
DHCAL Construction Status José Repond Argonne National Laboratory CALICE Meeting, February 19 – 20, 2009 Kyungpook National University, Daegu, Republic.
DHCAL Construction Status Lei Xia Argonne National Laboratory CALICE Meeting, September 16 – 18, 2009 Université Claude Bernard Lyon I, France.
José Repond Argonne National Laboratory LCWS, Vancouver, Canada, July 19 – 22, 2006 American Test Beam Plans.
Mar. 31, 2003CAL Testbeam Discussion J. Yu 1 Calorimeter Test Beam Goals 1.Test of hardware technologies Feasibilities, properties and performances of.
Status of GEM DHCAL Jae Yu For GEM DHCAL Group April 25, 2012 KILC Workshop, KNU Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test.
Future R&D of the RPC based Digital Hadron Calorimeter (DHCAL) Lei Xia ANL_HEP.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Future DHCAL Activities José Repond Argonne National Laboratory CALICE Meeting, CERN, May 19 – 21, 2011.
Andy White University of Texas at Arlington For GEM DHCAL Group CALOR 2012 Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test Analysis.
Digital HCAL Electronics Status of Electronics Production CALOR 2010 Conference IHEP Beijing, People’s Republic of China May 10-14, 2010 José Repond for.
G. Drake Electronics for DHCAL R&D Oct. 13, 2005 p. 1.
Test Beam Request for the Semi-Digital Hadronic Calorimeter
A Digital Hadron Calorimeter Resistive Plate Chambers
Recent DHCAL Developments
SiD Calorimeter R&D Collaboration
Construction and Testing of a Digital Hadron Calorimeter Prototype
Lei Xia Argonne National Laboratory
(My personal) CALICE Report
The DHCAL: an overview José Repond Argonne National Laboratory
Status of GEM DHCAL Andy White RD51 Collaboration Meeting CERN
José Repond Argonne National Laboratory
SiD Collaboration Meeting
GEM-based Digital Hadron Calorimetry for SiD
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
GEM-based Digital Hadron Calorimetry for SiD
GEM DHCAL Status and Plans
Tests of a Digital Hadron Calorimeter
Presentation transcript:

DHCAL Progress Report José Repond Argonne National Laboratory SiD Meeting, SLAC, October 26, 2006

Slice Test Test of ~8 chambers with complete electronics At MTBF in early 2007 Mechanical DCAL2 chip Pad and Front-end boards Data concentrators Data collectors DAQ software Beam telescope, HV, gas Prototype Section Measurements Measurements with complete 1m 3 section Hopefully starting in early 2008 Funding Outline

Slice Test

Slice test: RPCs and GEMs Uses the 40 DCAL ASICs from the 2 nd prototype run Equip ~8 chambers with 4 DCAL chips each 256 channels/chamber ~2000 channels total Order additional DCAL ASICs to equip GEM prototypes Chambers interleaved with 20 mm copper - steel absorber plates Electronic readout system (almost) identical to the one of the prototype section Tests in MTBF beam planned for March 2007 → Measure efficiency, pad multiplicity, rate capability of individual chambers → Measure hadronic showers and compare to simulation Validate RPC/GEM approach to calorimetry Validate concept of electronic readout

Mechanical: RPC design All chambers: channels, resistive paint, glass in hand 1 st chamber → being assembled V Guarino (ANL)

PC board attached to copper plate with screws (glued onto board) and spacers? Chamber held onto copper plate with c-clips (minimize distance to PC board) V Guarino (ANL)

Mechanical: Stack Design accommodates 20 x 20 cm 2 RPCs as well as 30 x 30 cm 2 GEMs All parts in hand, stack will be assembled shortly V Guarino (ANL)

Electronic Readout System for Prototype Section 40 layers à 1 m 2 → 400,000 readout channels I Front-end ASIC and motherboard II Data concentrator III Super Concentrator IV VME data collection V Trigger and timing system More than all of DØ in Run I Some recent changes concerning role of data collector and timing/trigger module

DCAL chip 1 st version → extensively tested with computer controlled interface → all functions performed as expected Redesign → decrease of gain by factor 20 (GEMs) or 100 (RPCs) → decoupling of clocks (readout and front-end) 2 nd version → submitted on July 22 nd → 40 chips (packaged) in hand Test board → redesign of test board (changes in pin layout etc.) complete → boards fabricated → chip mounted on test board Testing (2/40) → all software written → unless serious problems: tests complete by mid-November G Drake (ANL)

Pad and front-end boards New concept Pad boards two-layer board containing pads can be sized as big as necessary cheap and simple conductive epoxy to fill vias Front-end boards multi-layer board 16 x 16 cm 2 contain all transfer lines, houses DCAL chip expensive (blind and buried vias) and tough to design Connections board to board with conductive glue on each pad (being tested) cables for connection to data concentrators G Drake (ANL) Prototypes of pad boards expected by next week

Data concentrator boards Functionality defined Protocol to data collector defined Being designed Timing and trigger module Functionality defined Possibly to be designed by Chicago G Drake (ANL)

Data collector boards Three options considered ● Re-use of CRC boards (CALICE) Difficult to obtain Not matched to our application (trigger) Not considered anymore ● Re-use of CMS boards (Boston) Possible, but many drawbacks (availability) Costly (~ $70k for prototype section) Main advantage: could be ready in 3 months ● New design Not much more expensive (~$80k for prototype section) (~$60k for slice test) Will be exactly what we want Time needed ~ 6 months Decided to go for new design → contribution of Boston University Interface meeting on September 22 nd Design work started E Hazen (Boston)

DAQ software Particular challenge to be compatible with CALICE software L Xia (ANL) CRC boards SBS620 VME-PCI bridge Driver for SBS620 Hardware Access Library (HAL) Bus Adapter Board specific read/write classes CALICE DAQ program Data collectors some VME-PCI bridge CALICE Slice test Driver for the bridge Data collector read/write classes Need to choose a VME-PCI bridge Need to write a set of I/O classes Will acquire SBS618 VME-PCI bridge next week

Beam telescope, HV, and gas Beam telescope 6 counters (3 x (1 x 1 cm 2 ) + 1 x (4 x 4 cm 2 ) + 2 x (19 x 19 cm 2 ) Mounted on rigid structure In production HV modules Need separate supplies for each chamber Modules (from FNAL pool) being tested With additional RC-filter perform similarly to our Bertran unit in analog tests (RABBIT system) Still need to perform tests with digital readout Gas system Need manifold for 10 chambers (in hand! Thanks to D Northacker) Need approval for gas tanks (safety issue) J Li, A White, J Yu (UTA) E Norbeck (Iowa)

ASIC Pad board Front-end board Data concentrator Data collector Timing and trigger DAQ software RPCs GEMs Scanning table and absorber stack HV system Gas system Beam telescope Tests RedesignProductionTests Design Fabrication AssemblyTests Design Construction Development Tests Design Build 1 Test Build Build 11 Build TestAcquire Test MT6 Fabrication Assemble Time scales DesignConstructionTests

1 m 3 Prototype Section

Costs and Funding Stack ItemCostContingencyTotal RPC stack M&S607,200194,600801,800 Labor243,07599,625342,700 Total 850,275294,2251,144,500 GEM stack * M&S400,000165,000565,000 Labor280,46040,700321,160 Total 680,460205,700886,160 Both stacks M&S1007,200359, ,800 Labor523,535140,325663,860 Total 1,530,735499,9252,030,660 A) Slice test is funded by LCDRD06, LDRD06 and ANL-HEP, and Fermilab funds B) Prototype section not yet funded, but… Proposal for supplemental funds for $500k/year over two years submitted to DOE Help from ANL (LDRD), ANL-HEP, FNAL expected… * Reusing most of the RPC electronics

Funding LCRD funds for 2006 RPCs (ANL, Boston, Chicago, Iowa)$98k GEMs (UTA, Washington)$60k Supplemental LCRD funds for 2006/7 Available funds $1,200k/year? Submitted pre-proposal for RPC/GEM DHCAL Requested $1,200k for 2006 ~$800k for build RPC-DHCAL continue R&D on GEMs 2007test RPC-DHCAL at MTBF build GEM stack 2008test GEM-stack DOE asked us to submit proposal for $500k/year (done)