H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October.

Slides:



Advertisements
Similar presentations
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Advertisements

1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
Status at DORIS Hall New fixed cable channel on the floor for cables from outside to electronics hut Firedetection and network connections rerouted to.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 Plans for first installation 30 June to 19 July 2009.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements.
STEAM CONDENSERS.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MOM Report Galina Vankova RAL, MICE Video Conference.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
C 3 F 8 detection in N 2 pixel volume environment Rusty Boyd, Martin Doubek, Jan Godlewski Greg Hallewell Sasha Rozanov,Vic Vacek ATLAS ID Sonar Coolant.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
LG, 15 March 2007 ATB work for 2007 run1  Repair of ‘guillotine valves’  Repair converter (just after T4 TAX – quite radioactive !)  Invert order of.
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Installation of the T600 at Fermilab CSN2, September 22,
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
ICARUS Collaboration Meeting Dec A. Scaramelli.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
IBL CO 2 cooling flexible transfer integration into IDEP 24 July 2013 Jan Godlewski, Bart Verlaat, Siegfried Wenig, Nicolas Massol, Tomasz Blaszczyk 1.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
C. Kiesling, 7th Belle II VXD Workshop, Prague, Jan , VXD Cooling Requirements IBBelle Overview Commissioning at CERN (ATLAS version) Software.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
DEPFET Workshop, Kloster Seeon, May 2015 Mechanics & IBBelle 1 No news on PXD Mechanics in general Cooling blocks for thermal mock up are at DESY 2 more.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
3. Climate Control Systems Service Automotive – Heating & Air Conditioning Topics covered in this presentation: Gauge set and refrigerant Service ports.
H.-G. Moser, PXD, July 12, 2016 IBBelle: Status & Plans 1 2-phase CO 2 cooling system for PXD and SVD Minimal temperature: - 40 o C (intended: -30 o C)
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
BGV 23-feb-2016CERNMassimiliano Ferro-Luzzi 1 BGV cooling : status and plans reporting on behalf of EN-CV (Sylvain Nichilo & Olivier Crespo-Lopez)
S A Griffiths CM42 June 2015 Electrical & Control.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
Design, Evaluation and Application of a Fuel Cell Vehicle
IBBelle: Status & Plans
S.Movchan Straw manufacturing and QC
Heat Transfer and Refrigeration Cycle
Climate Control Systems Service
14 Refrigerant Recovery, Recycling, and Recharging.
1.3-GHz Cavity Vacuum Furnace at IB4
Status of the CO2 Cooling Project
Structure and etc Shoji Uno (KEK) at B2GM
Detector hall in mountain regions
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
USA-15 Compressor displacement for maintenance
Radiation-safe area for electronics, or laser or
Recirculating CO2 System
IBBelle: Status Commissioning at MPP Transport to KEK
Detector hall in mountain regions
Extract from today’s talk given to DCB
TRENTON Casing Filler Presentation
Far Experimental Hall - Hutches
LEBT water cooling system
Presentation transcript:

H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October B2GM Needed for Beast Phase II: April 2017 Visit at KEK by H.-G. Moser, R. Sedlmayer, and S. Vogt to prepare IBBelle commissioning (April 23-26) Check location, service connections, logistics

H.-G. Moser, April 25, 2016 Location 2 UNIT A UNIT B (laterl) CO 2 line Pump removal Enough service space? Room next to Tsukuba Hall in B1 level (used for solenoid)

H.-G. Moser, April 25, 2016 Requirements 3 1)60 cm free space around frame for access (open service doors). 2)Sufficient space for replacement of pumps (lift and crane access). 3)Short CO 2 transfer lines. 4)Possibility to fit second unit later without displacing the first one (clearance for crane operation). 5)Don’t obstruct escape doors. 60 cm Remove pump 2 m Need fork for crane 1 m

H.-G. Moser, April 25, 2016 Location at KEK m 0.6 m1.5 m >0.6 m For solenoid Clearance? Unit BUnit A

H.-G. Moser, April 25, 2016 Installation of B-Unit m1.5 m m >0.6 m For solenoid

H.-G. Moser, April 25, 2016 Escape Door 6 Escape door hidden behind unit B 60 cm clearance between wall and IBBelle frame (+ 40 cm on frame) In principle we can short Unit B by ~140 cm (no accumulator needed)  Only partially hidden.  Is this acceptable ? Seems to be ok….

H.-G. Moser, April 25, 2016 Ramp 7 In order to extract IBBelle the container has to be levelled and some steps filled (slight ramp before gate) Request to transport company(?)

H.-G. Moser, April 25, 2016 Long Transfer Line 8 At IBBelle Location Along gallery (moveable) Total length: 32 m (as expected)

H.-G. Moser, April 25, 2016 Transformer 9 Voltage too high (420V instead of 400V) Might reduce lifetime of some components Phase shifts between the lines were not correct! Fixed? Still confusing measurements => Need to verified

H.-G. Moser, April 25, 2016 Other Services 10 Compressed air (6 bar, ok) flexible tube (standard) will be provided by MPP sample of connection pipe at KEK Water pipe connection (25°C, 3 bar) Flexible hose sufficient. Sample of connection type at KEK. Network Lan required, power for switch close to JB (Ito-san) CO 2 connection IBBelle  transfer line  JB VCR, 3/8 and 1/2 inch. Needs to be produced in Japan CO 2 Connection JB manifolds: VCR, 3/8 and 1/2 inch. Needs to be produced in Japan. Need tray for tubes and cables (to give headroom). Vacuum for Flex lines: bar => ok IBBelle shipment in summer. After locating it in B1 the exact pipe shapes and length can be defined. Time for production and installation: till October 2016

H.-G. Moser, April 25, 2016 Other Requests 11 Monitoring of environment (humidity, temperature): Dew point < 15°C. R404a filling By company. Quantity: 12 kg. Needed early October CO2 filling: by us or KEK group, need 3 bottles 50kg (with rising pipe) in B1 Unloading IBBelle from container: need to level container

H.-G. Moser, April 25, 2016 Tools needed 12 Crane tool: bar Fork to lift pumps with the crane (only if unit B installed ) 5 m x 2 m; 5 tons

H.-G. Moser, April 25, 2016 Additional budget for IBBelle Shuji Tanaka: »AC transformer (400V: 3phase with neutral line) »Water Cooling pipe »Vacuum pump for flex line »Transfer tube piping (also between junction box and manifold) »CO 2 monitor »Dew point sensor for IBBelle room